What changed, Council Directive of 21 December 1989 on the coordination of the laws, regulations and adm…

2008-01-09 → 2014-04-17 · no interpretation, just the text delta

on 2008-01-09eu-eurlex:31989l0665:2008-01-09 (2008-01-09 → 2014-04-16) · official source ↗
on 2014-04-17eu-eurlex:31989l0665:2014-04-17 (2014-04-17 → open) · official source ↗

Open the structured article comparison → matched by provision anchor when continuity is sufficient; otherwise Lex refuses rather than inventing changes

225 line(s) in the old middle, 165 in the new; 3 unchanged leading and 1 trailing lines trimmed.

+ **1.** This Directive applies to contracts referred to in Directive 2014/24/EU of the European Parliament and of the Council (8) unless such contracts are excluded in accordance with Articles 7, 8, 9, 10, 11, 12, 15, 16, 17 and 37 of that Directive.
+ 
+ This Directive also applies to concessions awarded by contracting authorities, referred to in Directive 2014/23/EU of the European Parliament and of the Council (9) unless such concessions are excluded in accordance with Articles 10, 11, 12, 17 and 25 of that Directive.
− 1. This Directive applies to contracts referred to in Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts (8), unless such contracts are exc…
+ Contracts within the meaning of this Directive include public contracts, framework agreements, works and services concessions and dynamic purchasing systems.
− Contracts within the meaning of this Directive include public contracts, framework agreements, public works concessions and dynamic purchasing systems.
+ Member States shall take the measures necessary to ensure that, as regards contracts falling within the scope of Directive 2014/24/EU or Directive 2014/23/EU, decisions taken by the contracting authorities may be reviewed effectively and, in particular, as rapidly as possible in accordance with the …
− Member States shall take the measures necessary to ensure that, as regards contracts falling within the scope of Directive 2004/18/EC, decisions taken by the contracting authorities may be reviewed effectively and, in particular, as rapidly as possible in accordance with the conditions set out in Ar…
+ **2.** Member States shall ensure that there is no discrimination between undertakings claiming harm in the context of a procedure for the award of a contract as a result of the distinction made by this Directive between national rules implementing Community law and other national rules.
− 2. Member States shall ensure that there is no discrimination between undertakings claiming harm in the context of a procedure for the award of a contract as a result of the distinction made by this Directive between national rules implementing Community law and other national rules.
+ **3.** Member States shall ensure that the review procedures are available, under detailed rules which the Member States may establish, at least to any person having or having had an interest in obtaining a particular contract and who has been or risks being harmed by an alleged infringement.
− 3. Member States shall ensure that the review procedures are available, under detailed rules which the Member States may establish, at least to any person having or having had an interest in obtaining a particular contract and who has been or risks being harmed by an alleged infringement.
+ **4.** Member States may require that the person wishing to use a review procedure has notified the contracting authority of the alleged infringement and of his intention to seek review, provided that this does not affect the standstill period in accordance with Article 2a(2) or any other time limit…
− 4. Member States may require that the person wishing to use a review procedure has notified the contracting authority of the alleged infringement and of his intention to seek review, provided that this does not affect the standstill period in accordance with Article 2a(2) or any other time limits fo…
+ **5.** Member States may require that the person concerned first seek review with the contracting authority. In that case, Member States shall ensure that the submission of such an application for review results in immediate suspension of the possibility to conclude the contract.
− 5. Member States may require that the person concerned first seek review with the contracting authority. In that case, Member States shall ensure that the submission of such an application for review results in immediate suspension of the possibility to conclude the contract.
+ **1.** Member States shall ensure that the measures taken concerning the review procedures specified in Article 1 include provision for powers to:(a) take, at the earliest opportunity and by way of interlocutory procedures, interim measures with the aim of correcting the alleged infringement or prev…
− 1. Member States shall ensure that the measures taken concerning the review procedures specified in Article 1 include provision for powers to:
+ **2.** The powers specified in paragraph 1 and Articles 2d and 2e may be conferred on separate bodies responsible for different aspects of the review procedure.
− (a) take, at the earliest opportunity and by way of interlocutory procedures, interim measures with the aim of correcting the alleged infringement or preventing further damage to the interests concerned, including measures to suspend or to ensure the suspension of the procedure for the award of a pu…
+ **3.** When a body of first instance, which is independent of the contracting authority, reviews a contract award decision, Member States shall ensure that the contracting authority cannot conclude the contract before the review body has made a decision on the application either for interim measures…
− (b) either set aside or ensure the setting aside of decisions taken unlawfully, including the removal of discriminatory technical, economic or financial specifications in the invitation to tender, the contract documents or in any other document relating to the contract award procedure;
+ **4.** Except where provided for in paragraph 3 and Article 1(5), review procedures need not necessarily have an automatic suspensive effect on the contract award procedures to which they relate.
− (c) award damages to persons harmed by an infringement.
+ **5.** Member States may provide that the body responsible for review procedures may take into account the probable consequences of interim measures for all interests likely to be harmed, as well as the public interest, and may decide not to grant such measures when their negative consequences could…
− 2. The powers specified in paragraph 1 and Articles 2d and 2e may be conferred on separate bodies responsible for different aspects of the review procedure.

− 3. When a body of first instance, which is independent of the contracting authority, reviews a contract award decision, Member States shall ensure that the contracting authority cannot conclude the contract before the review body has made a decision on the application either for interim measures or …

− 4. Except where provided for in paragraph 3 and Article 1(5), review procedures need not necessarily have an automatic suspensive effect on the contract award procedures to which they relate.

− 5. Member States may provide that the body responsible for review procedures may take into account the probable consequences of interim measures for all interests likely to be harmed, as well as the public interest, and may decide not to grant such measures when their negative consequences could exc…
+ **6.** Member States may provide that where damages are claimed on the grounds that a decision was taken unlawfully, the contested decision must first be set aside by a body having the necessary powers.
− 6. Member States may provide that where damages are claimed on the grounds that a decision was taken unlawfully, the contested decision must first be set aside by a body having the necessary powers.
+ **7.** Except where provided for in Articles 2d to 2f, the effects of the exercise of the powers referred to in paragraph 1 of this Article on a contract concluded subsequent to its award shall be determined by national law.
− 7. Except where provided for in Articles 2d to 2f, the effects of the exercise of the powers referred to in paragraph 1 of this Article on a contract concluded subsequent to its award shall be determined by national law.
+ **8.** Member States shall ensure that decisions taken by bodies responsible for review procedures can be effectively enforced.
− 8. Member States shall ensure that decisions taken by bodies responsible for review procedures can be effectively enforced.
+ **9.** Where bodies responsible for review procedures are not judicial in character, written reasons for their decisions shall always be given. Furthermore, in such a case, provision must be made to guarantee procedures whereby any allegedly illegal measure taken by the review body or any alleged de…
− 9. Where bodies responsible for review procedures are not judicial in character, written reasons for their decisions shall always be given. Furthermore, in such a case, provision must be made to guarantee procedures whereby any allegedly illegal measure taken by the review body or any alleged defect…
+ **1.** The Member States shall ensure that the persons referred to in Article 1(3) have sufficient time for effective review of the contract award decisions taken by contracting authorities, by adopting the necessary provisions respecting the minimum conditions set out in paragraph 2 of this Article…
− 1. The Member States shall ensure that the persons referred to in Article 1(3) have sufficient time for effective review of the contract award decisions taken by contracting authorities, by adopting the necessary provisions respecting the minimum conditions set out in paragraph 2 of this Article and…
+ **2.** ►M3 A contract may not be concluded following the decision to award a contract falling within the scope of Directive 2014/24/EU or Directive 2014/23/EU before the expiry of a period of at least 10 calendar days with effect from the day following the date on which the contract award decision i…
− 2. A contract may not be concluded following the decision to award a contract falling within the scope of Directive 2004/18/EC before the expiry of a period of at least 10 calendar days with effect from the day following the date on which the contract award decision is sent to the tenderers and cand…
+ — a summary of the relevant reasons as set out in Article 55(2) of Directive 2014/24/EU, subject to Article 55(3) of that Directive, or in the second subparagraph of Article 40(1) of Directive 2014/23/EU, subject to Article 40(2) of that Directive, and
− — a summary of the relevant reasons as set out in Article 41(2) of Directive 2004/18/EC, subject to the provisions of Article 41(3) of that Directive, and,
+ (a) if Directive 2014/24/EU or, where relevant, Directive 2014/23/EU does not require prior publication of a contract notice in the *Official Journal of the European Union*;
− (a) if Directive 2004/18/EC does not require prior publication of a contract notice in the *Official Journal of the European Union*;
+ (c) in the case of a contract based on a framework agreement as provided for in Article 33 of Directive 2014/24/EU and in the case of a specific contract based on a dynamic purchasing system as provided for in Article 34 of that Directive.
− (c) in the case of a contract based on a framework agreement as provided for in Article 32 of Directive 2004/18/EC and in the case of a specific contract based on a dynamic purchasing system as provided for in Article 33 of that Directive.
+ — there is an infringement of point (c) of Article 33(4) or of Article 34(6) of Directive 2014/24/EU, and
− — there is an infringement of the second indent of the second subparagraph of Article 32(4) or of Article 33(5) or (6) of Directive 2004/18/EC, and,
+ — the contract value is estimated to be equal to or to exceed the thresholds set out in Article 4 of Directive 2014/24/EU.
− — the contract value is estimated to be equal to or to exceed the thresholds set out in Article 7 of Directive 2004/18/EC.
+ Where a Member State provides that any application for review of a contracting authority's decision taken in the context of, or in relation to, a contract award procedure falling within the scope of ►M3 Directive 2014/24/EU or Directive 2014/23/EU** ◄ ** must be made before the expiry of a specified…
− Where a Member State provides that any application for review of a contracting authority's decision taken in the context of, or in relation to, a contract award procedure falling within the scope of Directive 2004/18/EC must be made before the expiry of a specified period, this period shall be at le…
+ **1.** Member States shall ensure that a contract is considered ineffective by a review body independent of the contracting authority or that its ineffectiveness is the result of a decision of such a review body in any of the following cases:▼M3(a) if the contracting authority has awarded a contract…
− 1. Member States shall ensure that a contract is considered ineffective by a review body independent of the contracting authority or that its ineffectiveness is the result of a decision of such a review body in any of the following cases:

− (a) if the contracting authority has awarded a contract without prior publication of a contract notice in the *Official Journal of the European Union* without this being permissible in accordance with Directive 2004/18/EC;
+ **2.** The consequences of a contract being considered ineffective shall be provided for by national law.
− (b) in case of an infringement of Article 1(5), Article 2(3) or Article 2a(2) of this Directive, if this infringement has deprived the tenderer applying for review of the possibility to pursue pre-contractual remedies where such an infringement is combined with an infringement of Directive 2004/18/E…

− (c) in the cases referred to in the second subparagraph of Article 2b(c) of this Directive, if Member States have invoked the derogation from the standstill period for contracts based on a framework agreement and a dynamic purchasing system.

− 2. The consequences of a contract being considered ineffective shall be provided for by national law.
+ **3.** Member States may provide that the review body independent of the contracting authority may not consider a contract ineffective, even though it has been awarded illegally on the grounds mentioned in paragraph 1, if the review body finds, after having examined all relevant aspects, that overri…
− 3. Member States may provide that the review body independent of the contracting authority may not consider a contract ineffective, even though it has been awarded illegally on the grounds mentioned in paragraph 1, if the review body finds, after having examined all relevant aspects, that overriding…
+ **4.** The Member States shall provide that paragraph 1(a) of this Article does not apply where:▼M3— the contracting authority considers that the award of a contract without prior publication of a contract notice in the *Official Journal of the European Union* is permissible in accordance with Direc…
− 4. The Member States shall provide that paragraph 1(a) of this Article does not apply where:
+ **5.** The Member States shall provide that paragraph 1(c) of this Article does not apply where:▼M3— the contracting authority considers that the award of a contract is in accordance with point (c) of Article 33(4) or with Article 34(6) of Directive 2014/24/EU,▼M2— the contracting authority has sent…
− — the contracting authority considers that the award of a contract without prior publication of a contract notice in the *Official Journal of the European Union* is permissible in accordance with Directive 2004/18/EC,

− — the contracting authority has published in the *Official Journal of the European Union* a notice as described in Article 3a of this Directive expressing its intention to conclude the contract, and,

− — the contract has not been concluded before the expiry of a period of at least 10 calendar days with effect from the day following the date of the publication of this notice.
− 5. The Member States shall provide that paragraph 1(c) of this Article does not apply where:

− — the contracting authority considers that the award of a contract is in accordance with the second indent of the second subparagraph of Article 32(4) or with Article 33(5) and (6) of Directive 2004/18/EC,

− — the contracting authority has sent a contract award decision, together with a summary of reasons as referred to in the first indent of the fourth subparagraph of Article 2a(2) of this Directive, to the tenderers concerned, and,

− — the contract has not been concluded before the expiry of a period of at least 10 calendar days with effect from the day following the date on which the contract award decision is sent to the tenderers concerned if fax or electronic means are used or, if other means of communications are used, befo…

+ **1.** In the case of an infringement of Article 1(5), Article 2(3) or Article 2a(2) which is not covered by Article 2d(1)(b), Member States shall provide for ineffectiveness in accordance with Article 2d(1) to (3), or for alternative penalties. Member States may provide that the review body indepen…
− 1. In the case of an infringement of Article 1(5), Article 2(3) or Article 2a(2) which is not covered by Article 2d(1)(b), Member States shall provide for ineffectiveness in accordance with Article 2d(1) to (3), or for alternative penalties. Member States may provide that the review body independent…
+ **2.** Alternative penalties must be effective, proportionate and dissuasive. Alternative penalties shall be:— the imposition of fines on the contracting authority; or,— the shortening of the duration of the contract.
− 2. Alternative penalties must be effective, proportionate and dissuasive. Alternative penalties shall be:

− — the imposition of fines on the contracting authority; or,

− — the shortening of the duration of the contract.
+ **1.** Member States may provide that the application for review in accordance with Article 2d(1) must be made:▼M3(a) before the expiry of at least 30 calendar days with effect from the day following the date on which:— the contracting authority published a contract award notice in accordance with A…
− 1. Member States may provide that the application for review in accordance with Article 2d(1) must be made:
+ **2.** In all other cases, including applications for a review in accordance with Article 2e(1), the time limits for the application for a review shall be determined by national law, subject to the provisions of Article 2c.
− (a) before the expiry of at least 30 calendar days with effect from the day following the date on which:

− — the contracting authority published a contract award notice in accordance with Articles 35(4), 36 and 37 of Directive 2004/18/EC, provided that this notice includes justification of the decision of the contracting authority to award the contract without prior publication of a contract notice in th…

− — the contracting authority informed the tenderers and candidates concerned of the conclusion of the contract, provided that this information contains a summary of the relevant reasons as set out in Article 41(2) of Directive 2004/18/EC, subject to the provisions of Article 41(3) of that Directive. …

− (b) and in any case before the expiry of a period of at least six months with effect from the day following the date of the conclusion of the contract.

− 2. In all other cases, including applications for a review in accordance with Article 2e(1), the time limits for the application for a review shall be determined by national law, subject to the provisions of Article 2c.
+ **1.** The Commission may invoke the procedure provided for in paragraphs 2 to 5 when, prior to a contract being concluded, it considers that a serious infringement of Union law in the field of public procurement has been committed during a contract award procedure falling within the scope of Direct…
− 1. The Commission may invoke the procedure provided for in paragraphs 2 to 5 when, prior to a contract being concluded, it considers that a serious infringement of Community law in the field of public procurement has been committed during a contract award procedure falling within the scope of Direct…
+ **2.** The Commission shall notify the Member State concerned of the reasons which have led it to conclude that a serious infringement has been committed and request its correction by appropriate means.
− 2. The Commission shall notify the Member State concerned of the reasons which have led it to conclude that a serious infringement has been committed and request its correction by appropriate means.
+ **3.** Within 21 calendar days of receipt of the notification referred to in paragraph 2, the Member State concerned shall communicate to the Commission:(a) its confirmation that the infringement has been corrected;(b) a reasoned submission as to why no correction has been made; or(c) a notice to th…
− 3. Within 21 calendar days of receipt of the notification referred to in paragraph 2, the Member State concerned shall communicate to the Commission:
+ **4.** A reasoned submission communicated pursuant to paragraph 3(b) may rely among other matters on the fact that the alleged infringement is already the subject of judicial or other review proceedings or of a review as referred to in Article 2(9). In such a case, the Member State shall inform the …
− (a) its confirmation that the infringement has been corrected;
+ **5.** Where notice has been given that a contract award procedure has been suspended in accordance with paragraph 3(c), the Member State shall notify the Commission when the suspension is lifted or another contract procedure relating in whole or in part to the same subject matter is begun. That not…
− (b) a reasoned submission as to why no correction has been made; or
− (c) a notice to the effect that the contract award procedure has been suspended either by the contracting authority on its own initiative or on the basis of the powers specified in Article 2(1)(a).

− 4. A reasoned submission communicated pursuant to paragraph 3(b) may rely among other matters on the fact that the alleged infringement is already the subject of judicial or other review proceedings or of a review as referred to in Article 2(9). In such a case, the Member State shall inform the Comm…

− 5. Where notice has been given that a contract award procedure has been suspended in accordance with paragraph 3(c), the Member State shall notify the Commission when the suspension is lifted or another contract procedure relating in whole or in part to the same subject matter is begun. That notific…

+ **1.** The Commission shall be assisted by the Advisory Committee for Public Contracts set up by Article 1 of Council Decision 71/306/EEC of 26 July 1971 (10) (hereinafter referred to as the Committee).
− 1. The Commission shall be assisted by the Advisory Committee for Public Contracts set up by Article 1 of Council Decision 71/306/EEC of 26 July 1971 (9) (hereinafter referred to as the Committee).
+ **2.** Where reference is made to this paragraph, Articles 3 and 7 of Council Decision 1999/468/EC of 28 June 1999 laying down the procedures for the exercise of implementing powers conferred on the Commission (11) shall apply, having regard to the provisions of Article 8 thereof.
− 2. Where reference is made to this paragraph, Articles 3 and 7 of Council Decision 1999/468/EC of 28 June 1999 laying down the procedures for the exercise of implementing powers conferred on the Commission (10) shall apply, having regard to the provisions of Article 8 thereof.
+ **1.** The Commission may request the Member States, in consultation with the Committee, to provide it with information on the operation of national review procedures.
− 1. The Commission may request the Member States, in consultation with the Committee, to provide it with information on the operation of national review procedures.
+ **2.** Member States shall communicate to the Commission on an annual basis the text of all decisions, together with the reasons therefor, taken by their review bodies in accordance with Article 2d(3).
− 2. Member States shall communicate to the Commission on an annual basis the text of all decisions, together with the reasons therefor, taken by their review bodies in accordance with Article 2d(3).
+ ►C1 Member States shall bring into force, before 21 December 1991,** ◄ ** the measures necessary to comply with this Directive. They shall communicate to the Commission the texts of the main national laws, regulations and administrative provisions which they adopt in the field governed by this Direc…
− Member States shall bring into force, before 1 December 1991, the measures necessary to comply with this Directive. They shall communicate to the Commission the texts of the main national laws, regulations and administrative provisions which they adopt in the field governed by this Directive.

− (1) OJ No C 230, 28.8.1987, p. 6 and OJ No C 15, 19.1.1989, p. 8.

− (2) OJ No C 167, 27.6.1988, p. 77 and OJ No C 323, 27.12.1989.

− (3) OJ No C 347, 22.12.1987, p. 23.

− (4) OJ No L 185, 16.8.1971, p. 5.

− (5) OJ No L 210, 21.7.1989, p. 1.

− (6) OJ No L 13, 15.1.1977, p. 1.

− (7) OJ No L 127, 20.5.1988, p. 1.

− (8) OJ L 134, 30.4.2004, p. 114. Directive as last amended by Council Directive 2006/97/EC (OJ L 363, 20.12.2006, p. 107).

− (9) OJ L 185, 16.8.1971, p. 15. Decision as amended by Decision 77/63/EEC (OJ L 13, 15.1.1977, p. 15).

− (10) OJ L 184, 17.7.1999, p. 23. Decision as amended by Decision 2006/512/EC (OJ L 200, 22.7.2006, p. 11).