What changed, Directive 2003/87/EC
2009-04-20 → 2009-06-25 · no interpretation, just the text delta
| on 2009-04-20 | eu-eurlex:32003l0087:2009-04-20 (2009-04-20 → 2009-06-24) · official source ↗ |
| on 2009-06-25 | eu-eurlex:32003l0087:2009-06-25 (2009-06-25 → 2013-06-30) · official source ↗ |
Open the structured article comparison → matched by provision anchor when continuity is sufficient; otherwise Lex refuses rather than inventing changes
1,012 line(s) in the old middle, 1,379 in the new; 7 unchanged leading and 1 trailing lines trimmed.
+ This Directive also provides for the reductions of greenhouse gas emissions to be increased so as to contribute to the levels of reductions that are considered scientifically necessary to avoid dangerous climate change. + + This Directive also lays down provisions for assessing and implementing a stricter Community reduction commitment exceeding 20 %, to be applied upon the approval by the Community of an international agreement on climate change leading to greenhouse gas emission reductions exceeding those required in… + + (c) ‘greenhouse gases’ means the gases listed in Annex II and other gaseous constituents of the atmosphere, both natural and anthropogenic, that absorb and re-emit infrared radiation; − (c) ‘greenhouse gases’ means the gases listed in Annex II; + + (h) ‘new entrant’ means: + — any installation carrying out one or more of the activities indicated in Annex I, which has obtained a greenhouse gas emissions permit for the first time after 30 June 2011, + + — any installation carrying out an activity which is included in the Community scheme pursuant to Article 24(1) or (2) for the first time, or + + — any installation carrying out one or more of the activities indicated in Annex I or an activity which is included in the Community scheme pursuant to Article 24(1) or (2), which has had a significant extension after 30 June 2011, only in so far as this extension is concerned; − (h) ‘new entrant’ means any installation carrying out one or more of the activities indicated in Annex I, which has obtained a greenhouse gas emissions permit or an update of its greenhouse gas emissions permit because of a change in the nature or functioning or an extension of the installation, sub… + (s) ‘historical aviation emissions’ means the mean average of the annual emissions in the calendar years 2004, 2005 and 2006 from aircraft performing an aviation activity listed in Annex I; + + (t) ‘combustion’ means any oxidation of fuels, regardless of the way in which the heat, electrical or mechanical energy produced by this process is used, and any other directly associated activities, including waste gas scrubbing; + + (u) ‘electricity generator’ means an installation that, on or after 1 January 2005, has produced electricity for sale to third parties, and in which no activity listed in Annex I is carried out other than the ‘combustion of fuels’. − (s) ‘historical aviation emissions’ means the mean average of the annual emissions in the calendar years 2004, 2005 and 2006 from aircraft performing an aviation activity listed in Annex I. + 2. For the period referred to in ►M4 Article 13(1)** ◄ ** beginning on 1 January 2013, and, in the absence of any amendments following the review referred to in Article 30(4), for each subsequent period, the total quantity of allowances to be allocated to aircraft operators shall be equivalent to 95… − 2. For the period referred to in Article 11(2) beginning on 1 January 2013, and, in the absence of any amendments following the review referred to in Article 30(4), for each subsequent period, the total quantity of allowances to be allocated to aircraft operators shall be equivalent to 95 % of the h… + The administering Member State shall ensure that each aircraft operator submits to the competent authority in that Member State a monitoring plan setting out measures to monitor and report emissions and tonne-kilometre data for the purpose of an application under Article 3e and that such plans are a… − The administering Member State shall ensure that each aircraft operator submits to the competent authority in that Member State a monitoring plan setting out measures to monitor and report emissions and tonne-kilometre data for the purpose of an application under Article 3e and that such plans are a… + Member States shall ensure that, from 1 January 2005, no installation carries out any activity listed in Annex I resulting in emissions specified in relation to that activity unless its operator holds a permit issued by a competent authority in accordance with Articles 5 and 6, or the installation i… − Member States shall ensure that, from 1 January 2005, no installation undertakes any activity listed in Annex I resulting in emissions specified in relation to that activity unless its operator holds a permit issued by a competent authority in accordance with Articles 5 and 6, or the installation is… + (d) the measures planned to monitor and report emissions in accordance with the regulation referred to in Article 14. − (d) the measures planned to monitor and report emissions in accordance with the guidelines adopted pursuant to Article 14. + + The competent authority shall, at least every five years, review the greenhouse gas emissions permit and make any amendments as are appropriate. + (c) a monitoring plan that fulfils the requirements under the regulation referred to in Article 14. Member States may allow operators to update monitoring plans without changing the permit. Operators shall submit any updated monitoring plans to the competent authority for approval; − (c) monitoring requirements, specifying monitoring methodology and frequency; + The operator shall inform the competent authority of any planned changes to the nature or functioning of the installation, or any extension or significant reduction of its capacity, which may require updating the greenhouse gas emissions permit. Where appropriate, the competent authority shall updat… − The operator shall inform the competent authority of any changes planned in the nature or functioning, or an extension, of the installation which may require updating of the greenhouse gas emissions permit. Where appropriate, the competent authority shall update the permit. Where there is a change i… + + ### Article 9 — Community-wide quantity of allowances + + The Community-wide quantity of allowances issued each year starting in 2013 shall decrease in a linear manner beginning from the mid-point of the period from 2008 to 2012. The quantity shall decrease by a linear factor of 1,74 % compared to the average annual total quantity of allowances issued by M… + + The Commission shall, by 30 June 2010, publish the absolute Community-wide quantity of allowances for 2013, based on the total quantities of allowances issued or to be issued by the Member States in accordance with the Commission Decisions on their national allocation plans for the period from 2008 … + + The Commission shall review the linear factor and submit a proposal, where appropriate, to the European Parliament and to the Council as from 2020, with a view to the adoption of a decision by 2025. + + ### Article 9a — Adjustment of the Community-wide quantity of allowances + + 1. In respect of installations that were included in the Community scheme during the period from 2008 to 2012 pursuant to Article 24(1), the quantity of allowances to be issued from 1 January 2013 shall be adjusted to reflect the average annual quantity of allowances issued in respect of those insta… + + 2. In respect of installations carrying out activities listed in Annex I, which are only included in the Community scheme from 2013 onwards, Member States shall ensure that the operators of such installations submit to the relevant competent authority duly substantiated and independently verified em… + + Any such data shall be submitted, by 30 April 2010, to the relevant competent authority in accordance with the provisions adopted pursuant to Article 14(1). + + If the data submitted are duly substantiated, the competent authority shall notify the Commission thereof by 30 June 2010 and the quantity of allowances to be issued, adjusted by the linear factor referred to in Article 9, shall be adjusted accordingly. In the case of installations emitting greenhou… + + 3. The Commission shall publish the adjusted quantities referred to in paragraphs 1 and 2 by 30 September 2010. + + 4. In respect of installations which are excluded from the Community scheme in accordance with Article 27, the Community-wide quantity of allowances to be issued from 1 January 2013 shall be adjusted downwards to reflect the average annual verified emissions of those installations in the period from… + + ### Article 10 — Auctioning of allowances + + 1. From 2013 onwards, Member States shall auction all allowances which are not allocated free of charge in accordance with Article 10a and 10c. By 31 December 2010, the Commission shall determine and publish the estimated amount of allowances to be auctioned. + + 2. The total quantity of allowances to be auctioned by each Member State shall be composed as follows: + + (a) 88 % of the total quantity of allowances to be auctioned being distributed amongst Member States in shares that are identical to the share of verified emissions under the Community scheme for 2005 or the average of the period from 2005 to 2007, whichever one is the highest, of the Member State c… + + (b) 10 % of the total quantity of allowances to be auctioned being distributed amongst certain Member States for the purpose of solidarity and growth within the Community, thereby increasing the amount of allowances that those Member States auction under point (a) by the percentages specified in Ann… + + (c) 2 % of the total quantity of allowances to be auctioned being distributed amongst Member States the greenhouse gas emissions of which were, in 2005, at least 20 % below their emissions in the base year applicable to them under the Kyoto Protocol. The distribution of this percentage amongst the M… + + For the purposes of point (a), in respect of Member States which did not participate in the Community scheme in 2005, their share shall be calculated using their verified emissions under the Community scheme in 2007. + + If necessary, the percentages referred to in points (b) and (c) shall be adapted in a proportional manner to ensure that the distribution is 10 % and 2 % respectively. + + 3. Member States shall determine the use of revenues generated from the auctioning of allowances. At least 50 % of the revenues generated from the auctioning of allowances referred to in paragraph 2, including all revenues from the auctioning referred to in paragraph 2, points (b) and (c), or the eq… + + (a) to reduce greenhouse gas emissions, including by contributing to the Global Energy Efficiency and Renewable Energy Fund and to the Adaptation Fund as made operational by the Poznan Conference on Climate Change (COP 14 and COP/MOP 4), to adapt to the impacts of climate change and to fund research… + + (b) to develop renewable energies to meet the commitment of the Community to using 20 % renewable energies by 2020, as well as to develop other technologies contributing to the transition to a safe and sustainable low-carbon economy and to help meet the commitment of the Community to increase energy… + + (c) measures to avoid deforestation and increase afforestation and reforestation in developing countries that have ratified the international agreement on climate change, to transfer technologies and to facilitate adaptation to the adverse effects of climate change in these countries; + + (d) forestry sequestration in the Community; + + (e) the environmentally safe capture and geological storage of CO2, in particular from solid fossil fuel power stations and a range of industrial sectors and subsectors, including in third countries; + + (f) to encourage a shift to low-emission and public forms of transport; + + (g) to finance research and development in energy efficiency and clean technologies in the sectors covered by this Directive; + + (h) measures intended to increase energy efficiency and insulation or to provide financial support in order to address social aspects in lower and middle income households; + + (i) to cover administrative expenses of the management of the Community scheme. + + Member States shall be deemed to have fulfilled the provisions of this paragraph if they have in place and implement fiscal or financial support policies, including in particular in developing countries, or domestic regulatory policies, which leverage financial support, established for the purposes … + + Member States shall inform the Commission as to the use of revenues and the actions taken pursuant to this paragraph in their reports submitted under Decision No 280/2004/EC. + + 4. By 30 June 2010, the Commission shall adopt a regulation on timing, administration and other aspects of auctioning to ensure that it is conducted in an open, transparent, harmonised and non-discriminatory manner. To this end, the process should be predictable, in particular as regards the timing … + + Auctions shall be designed to ensure that: + + (a) operators, and in particular any SMEs covered by the Community scheme, have full, fair and equitable access; + + (b) all participants have access to the same information at the same time and that participants do not undermine the operation of the auction; + + (c) the organisation and participation in auctions is cost-efficient and undue administrative costs are avoided; and + + (d) access to allowances is granted for small emitters. + + That measure, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). + + Member States shall report on the proper implementation of the auctioning rules for each auction, in particular with respect to fair and open access, transparency, price formation and technical and operational aspects. These reports shall be submitted within one month of the auction concerned and sh… + + 5. The Commission shall monitor the functioning of the European carbon market. Each year, it shall submit a report to the European Parliament and to the Council on the functioning of the carbon market including the implementation of the auctions, liquidity and the volumes traded. If necessary, Membe… + + ### Article 10a — Transitional Community-wide rules for harmonised free allocation + + 1. By 31 December 2010, the Commission shall adopt Community-wide and fully-harmonised implementing measures for the allocation of the allowances referred to in paragraphs 4, 5, 7 and 12, including any necessary provisions for a harmonised application of paragraph 19. + + Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). + + The measures referred to in the first subparagraph shall, to the extent feasible, determine Community-wide ex-ante benchmarks so as to ensure that allocation takes place in a manner that provides incentives for reductions in greenhouse gas emissions and energy efficient techniques, by taking account… + + For each sector and subsector, in principle, the benchmark shall be calculated for products rather than for inputs, in order to maximise greenhouse gas emissions reductions and energy efficiency savings throughout each production process of the sector or the subsector concerned. + + In defining the principles for setting ex-ante benchmarks in individual sectors and subsectors, the Commission shall consult the relevant stakeholders, including the sectors and subsectors concerned. + + The Commission shall, upon the approval by the Community of an international agreement on climate change leading to mandatory reductions of greenhouse gas emissions comparable to those of the Community, review those measures to provide that free allocation is only to take place where this is fully j… + + 2. In defining the principles for setting ex-ante benchmarks in individual sectors or subsectors, the starting point shall be the average performance of the 10 % most efficient installations in a sector or subsector in the Community in the years 2007-2008. The Commission shall consult the relevant s… + + The regulations pursuant to Articles 14 and 15 shall provide for harmonised rules on monitoring, reporting and verification of production-related greenhouse gas emissions with a view to determining the ex-ante benchmarks. + + 3. Subject to paragraphs 4 and 8, and notwithstanding Article 10c, no free allocation shall be given to electricity generators, to installations for the capture of CO2, to pipelines for transport of CO2 or to CO2 storage sites. + + 4. Free allocation shall be given to district heating as well as to high efficiency cogeneration, as defined by Directive 2004/8/EC, for economically justifiable demand, in respect of the production of heating or cooling. In each year subsequent to 2013, the total allocation to such installations in… + + 5. The maximum annual amount of allowances that is the basis for calculating allocations to installations which are not covered by paragraph 3 and are not new entrants shall not exceed the sum of: + + (a) the annual Community-wide total quantity, as determined pursuant to Article 9, multiplied by the share of emissions from installations not covered by paragraph 3 in the total average verified emissions, in the period from 2005 to 2007, from installations covered by the Community scheme in the pe… + + (b) the total average annual verified emissions from installations in the period from 2005 to 2007 which are only included in the Community scheme from 2013 onwards and are not covered by paragraph 3, adjusted by the linear factor, as referred to in Article 9. + + A uniform cross-sectoral correction factor shall be applied if necessary. + + 6. Member States may also adopt financial measures in favour of sectors or subsectors determined to be exposed to a significant risk of carbon leakage due to costs relating to greenhouse gas emissions passed on in electricity prices, in order to compensate for those costs and where such financial me… + + Those measures shall be based on ex-ante benchmarks of the indirect emissions of CO2 per unit of production. The ex-ante benchmarks shall be calculated for a given sector or subsector as the product of the electricity consumption per unit of production corresponding to the most efficient available t… + + 7. Five percent of the Community-wide quantity of allowances determined in accordance with Articles 9 and 9a over the period from 2013 to 2020 shall be set aside for new entrants, as the maximum that may be allocated to new entrants in accordance with the rules adopted pursuant to paragraph 1 of thi… + + Allocations shall be adjusted by the linear factor referred to in Article 9. + + No free allocation shall be made in respect of any electricity production by new entrants. + By 31 December 2010, the Commission shall adopt harmonised rules for the application of the definition of ‘new entrant’, in particular in relation to the definition of ‘significant extensions’. + + Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). + + 8. Up to 300 million allowances in the new entrants' reserve shall be available until 31 December 2015 to help stimulate the construction and operation of up to 12 commercial demonstration projects that aim at the environmentally safe capture and geological storage (CCS) of CO2 as well as demonstrat… + + The allowances shall be made available for support for demonstration projects that provide for the development, in geographically balanced locations, of a wide range of CCS and innovative renewable energy technologies that are not yet commercially viable. Their award shall be dependent upon the veri… + + Projects shall be selected on the basis of objective and transparent criteria that include requirements for knowledge-sharing. Those criteria and the measures shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3), and shall be made available to the p… + + Allowances shall be set aside for the projects that meet the criteria referred to in the third subparagraph. Support for these projects shall be given via Member States and shall be complementary to substantial co-financing by the operator of the installation. They could also be co-financed by the M… + + 9. Lithuania, which, pursuant to Article 1 of Protocol No 4 on the Ignalina nuclear power plant in Lithuania, annexed to the 2003 Act of Accession, has committed to the closure of unit 2 of the Ignalina Nuclear Power Plant by 31 December 2009, may, if the total verified emissions of Lithuania in the… + + 10. Any Member State with an electricity network which is interconnected with Lithuania and which, in 2007, imported more than 15 % of its domestic electricity consumption from Lithuania for its own consumption, and where emissions have increased due to investment in new electricity generation, may … + + 11. Subject to Article 10b, the amount of allowances allocated free of charge under paragraphs 4 to 7 of this Article in 2013 shall be 80 % of the quantity determined in accordance with the measures referred to in paragraph 1. Thereafter the free allocation shall decrease each year by equal amounts … + + 12. Subject to Article 10b, in 2013 and in each subsequent year up to 2020, installations in sectors or subsectors which are exposed to a significant risk of carbon leakage shall be allocated, pursuant to paragraph 1, allowances free of charge at 100 % of the quantity determined in accordance with t… + + 13. By 31 December 2009 and every five years thereafter, after discussion in the European Council, the Commission shall determine a list of the sectors or subsectors referred to in paragraph 12 on the basis of the criteria referred to in paragraphs 14 to 17. + + Every year the Commission may, at its own initiative or at the request of a Member State, add a sector or subsector to the list referred to in the first subparagraph if it can be demonstrated, in an analytical report, that this sector or subsector satisfies the criteria in paragraphs 14 to 17, follo… + + For the purpose of implementing this Article, the Commission shall consult the Member States, the sectors or subsectors concerned and other relevant stakeholders. + + Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). + + 14. In order to determine the sectors or subsectors referred to in paragraph 12, the Commission shall assess, at Community level, the extent to which it is possible for the sector or subsector concerned, at the relevant level of disaggregation, to pass on the direct cost of the required allowances a… + + 15. A sector or subsector shall be deemed to be exposed to a significant risk of carbon leakage if: + + (a) the sum of direct and indirect additional costs induced by the implementation of this Directive would lead to a substantial increase of production costs, calculated as a proportion of the gross value added, of at least 5 %; and + + (b) the intensity of trade with third countries, defined as the ratio between the total value of exports to third countries plus the value of imports from third countries and the total market size for the Community (annual turnover plus total imports from third countries), is above 10 %. + + 16. Notwithstanding paragraph 15, a sector or subsector is also deemed to be exposed to a significant risk of carbon leakage if: + + (a) the sum of direct and indirect additional costs induced by the implementation of this Directive would lead to a particularly high increase of production costs, calculated as a proportion of the gross value added, of at least 30 %; or + + (b) the intensity of trade with third countries, defined as the ratio between the total value of exports to third countries plus the value of imports from third countries and the total market size for the Community (annual turnover plus total imports from third countries), is above 30 %. + + 17. The list referred to in paragraph 13 may be supplemented after completion of a qualitative assessment, taking into account, where the relevant data are available, the following criteria: + + (a) the extent to which it is possible for individual installations in the sector or subsector concerned to reduce emission levels or electricity consumption, including, as appropriate, the increase in production costs that the related investment may entail, for instance on the basis of the most eff… + + (b) current and projected market characteristics, including when trade exposure or direct and indirect cost increase rates are close to one of the thresholds mentioned in paragraph 16; + + (c) profit margins as a potential indicator of long-run investment or relocation decisions. + + 18. The list referred to in paragraph 13 shall be determined after taking into account, where the relevant data are available, the following: + + (a) the extent to which third countries, representing a decisive share of global production of products in sectors or subsectors deemed to be at risk of carbon leakage, firmly commit to reducing greenhouse gas emissions in the relevant sectors or subsectors to an extent comparable to that of the Com… + + (b) the extent to which the carbon efficiency of installations located in these countries is comparable to that of the Community. + + 19. No free allocation shall be given to an installation that has ceased its operations, unless the operator demonstrates to the competent authority that this installation will resume production within a specified and reasonable time. Installations for which the greenhouse gas emissions permit has e… + + 20. The Commission shall, as part of the measures adopted under paragraph 1, include measures for defining installations that partially cease to operate or significantly reduce their capacity, and measures for adapting, as appropriate, the level of free allocations given to them accordingly. + + ### Article 10b — Measures to support certain energy-intensive industries in the event of carbon leakage + + 1. By 30 June 2010, the Commission shall, in the light of the outcome of the international negotiations and the extent to which these lead to global greenhouse gas emission reductions, and after consulting with all relevant social partners, submit to the European Parliament and to the Council an ana… + + (a) adjustment of the proportion of allowances received free of charge by those sectors or subsectors under Article 10a; + + (b) inclusion in the Community scheme of importers of products which are produced by the sectors or subsectors determined in accordance with Article 10a; + + (c) assessment of the impact of carbon leakage on Member States’ energy security, in particular where the electricity connections with the rest of the Union are insufficient and where there are electricity connections with third countries, and appropriate measures in this regard. + + Any binding sectoral agreements which lead to global greenhouse gas emissions reductions of the magnitude required to effectively address climate change, and which are monitorable, verifiable and subject to mandatory enforcement arrangements shall also be taken into account when considering what mea… + + 2. The Commission shall assess, by 31 March 2011, whether the decisions made regarding the proportion of allowances received free of charge by sectors or subsectors in accordance with paragraph 1, including the effect of setting ex-ante benchmarks in accordance with Article 10a(2), are likely to sig… + + ### Article 10c — Option for transitional free allocation for the modernisation of electricity generation + + 1. By derogation from Article 10a(1) to (5), Member States may give a transitional free allocation to installations for electricity production in operation by 31 December 2008 or to installations for electricity production for which the investment process was physically initiated by the same date, p… + + (a) in 2007, the national electricity network was not directly or indirectly connected to the network interconnected system operated by the Union for the Coordination of Transmission of Electricity (UCTE); + + (b) in 2007, the national electricity network was only directly or indirectly connected to the network operated by UCTE through a single line with a capacity of less than 400 MW; or + + (c) in 2006, more than 30 % of electricity was produced from a single fossil fuel, and the GDP per capita at market price did not exceed 50 % of the average GDP per capita at market price of the Community. + + The Member State concerned shall submit to the Commission a national plan that provides for investments in retrofitting and upgrading of the infrastructure and clean technologies. The national plan shall also provide for the diversification of their energy mix and sources of supply for an amount equ… + + 2. Transitional free allocations shall be deducted from the quantity of allowances that the respective Member State would otherwise auction pursuant to Article 10(2). In 2013, the total transitional free allocation shall not exceed 70 % of the annual average verified emissions in 2005-2007 from such… + + The Member State concerned may determine that the allowances allocated pursuant to this Article may only be used by the operator of the installation concerned for surrendering allowances pursuant to Article 12(3) with respect to emissions of the same installation during the year for which the allowa… + + 3. Allocations to operators shall be based on the allocation under the verified emissions in 2005-2007 or an ex-ante efficiency benchmark based on the weighted average of emission levels of most greenhouse gas efficient electricity production covered by the Community scheme for installations using d… + + 4. Any Member State applying this Article shall require benefiting electricity generators and network operators to report every 12 months on the implementation of their investments referred to in the national plan. Member States shall report on this to the Commission and shall make such reports publ… + + 5. Any Member State that intends to allocate allowances on the basis of this Article shall, by 30 September 2011, submit to the Commission an application containing the proposed allocation methodology and individual allocations. An application shall contain: − ### Article 9 — National allocation plan + (a) evidence that the Member State meets at least one of the conditions set out in paragraph 1; − 1. For each period referred to in Article 11(1) and (2), each Member State shall develop a national plan stating the total quantity of allowances that it intends to allocate for that period and how it proposes to allocate them. The plan shall be based on objective and transparent criteria, including… + (b) a list of the installations covered by the application and the amount of allowances to be allocated to each installation in accordance with paragraph 3 and the Commission guidance; − For the period referred to in Article 11(1), the plan shall be published and notified to the Commission and to the other Member States by 31 March 2004 at the latest. For subsequent periods, the plan shall be published and notified to the Commission and to the other Member States at least 18 months … + (c) the national plan referred to in the second subparagraph of paragraph 1; − 2. National allocation plans shall be considered within the committee referred to in Article 23(1). + (d) monitoring and enforcement provisions with respect to the intended investments pursuant to the national plan; − 3. Within three months of notification of a national allocation plan by a Member State under paragraph 1, the Commission may reject that plan, or any aspect thereof, on the basis that it is incompatible with the criteria listed in Annex III or with Article 10. The Member State shall only take a deci… + (e) information showing that the allocations do not create undue distortions of competition. − ### Article 10 — Method of allocation + 6. The Commission shall assess the application taking into account the elements set out in paragraph 5 and may reject the application, or any aspect thereof, within six months of receiving the relevant information. − For the three-year period beginning 1 January 2005 Member States shall allocate at least 95 % of the allowances free of charge. For the five-year period beginning 1 January 2008, Member States shall allocate at least 90 % of the allowances free of charge. + 7. Two years before the end of the period during which a Member State may give transitional free allocation to installations for electricity production in operation by 31 December 2008, the Commission shall assess the progress made in the implementation of the national plan. If the Commission consid… − ### Article 11 — Allocation and issue of allowances + ### Article 11 — National implementation measures − 1. For the three-year period beginning 1 January 2005, each Member State shall decide upon the total quantity of allowances it will allocate for that period and the allocation of those allowances to the operator of each installation. This decision shall be taken at least three months before the begi… + 1. Each Member State shall publish and submit to the Commission, by 30 September 2011, the list of installations covered by this Directive in its territory and any free allocation to each installation in its territory calculated in accordance with the rules referred to in Article 10a(1) and Article … − 2. For the five-year period beginning 1 January 2008, and for each subsequent five-year period, each Member State shall decide upon the total quantity of allowances it will allocate for that period and initiate the process for the allocation of those allowances to the operator of each installation. … + 2. By 28 February of each year, the competent authorities shall issue the quantity of allowances that are to be allocated for that year, calculated in accordance with Articles 10, 10a and 10c. − 3. Decisions taken pursuant to paragraph 1 or 2 shall be in accordance with the requirements of the Treaty, in particular Articles 87 and 88 thereof. When deciding upon allocation, Member States shall take into account the need to provide access to allowances for new entrants. + 3. Member States may not issue allowances free of charge under paragraph 2 to installations whose inscription in the list referred to in paragraph 1 has been rejected by the Commission. − 4. The competent authority shall issue a proportion of the total quantity of allowances each year of the period referred to in paragraph 1 or 2, by 28 February of that year. + ### Article 11a — Use of CERs and ERUs from project activities in the Community scheme before the entry into force of an international agreement on climate change + + 1. Without prejudice to the application of Article 28(3) and (4), paragraphs 2 to 7 of this Article shall apply. + + 2. To the extent that the levels of CER and ERU use, allowed to operators or aircraft operators by Member States for the period from 2008 to 2012, have not been used up or an entitlement to use credits is granted under paragraph 8, operators may request the competent authority to issue allowances to… + + Until 31 March 2015, the competent authority shall make such an exchange on request. + + 3. To the extent that the levels of CER and ERU use, allowed to operators or aircraft operators by Member States for the period from 2008 to 2012, have not been used up or an entitlement to use credits is granted under paragraph 8, competent authorities shall allow operators to exchange CERs and ERU… + + The first subparagraph shall apply to CERs and ERUs for all project types which were eligible for use in the Community scheme during the period from 2008 to 2012. + + 4. To the extent that the levels of CER and ERU use, allowed to operators or aircraft operators by Member States for the period from 2008 to 2012, have not been used up or an entitlement to use credits is granted under paragraph 8, competent authorities shall allow operators to exchange CERs issued … + + The first subparagraph shall apply to CERs for all project types which were eligible for use in the Community scheme during the period from 2008 to 2012, until those countries have ratified a relevant agreement with the Community or until 2020, whichever is the earlier. + + 5. To the extent that the levels of CER and ERU use, allowed to operators or aircraft operators by Member States for the period from 2008 to 2012, have not been used up or an entitlement to use credits is granted under paragraph 8 and in the event that the negotiations on an international agreement … + + 6. Any agreements referred to in paragraph 5 shall provide for the use of credits in the Community scheme from project types which were eligible for use in the Community scheme during the period from 2008 to 2012, including renewable energy or energy efficiency technologies which promote technologic… − ### Article 11a — Use of CERs and ERUs from project activities in the Community scheme + 7. Once an international agreement on climate change has been reached, only credits from projects from third countries which have ratified that agreement shall be accepted in the Community scheme from 1 January 2013. − 1. Subject to paragraph 3, during each period referred to in Article 11(2), Member States may allow operators to use CERs and ERUs from project activities in the Community scheme up to a percentage of the allocation of allowances to each installation, to be specified by each Member State in its nati… + 8. All existing operators shall be allowed to use credits during the period from 2008 to 2020 up to either the amount allowed to them during the period from 2008 to 2012, or to an amount corresponding to a percentage, which shall not be set below 11 %, of their allocation during the period from 2008… − 1a. During the period referred to in Article 3c(1), aircraft operators may use CERs and ERUs, up to 15 % of the number of allowances they are required to surrender pursuant to Article 12(2a). + Operators shall be able to use credits beyond the 11 % provided for in the first subparagraph, up to an amount which results in their combined free allocation in the period from 2008 to 2012 and overall project credits entitlement equal to a certain percentage of their verified emissions in the peri… − For subsequent periods, the percentage of CERs and ERUs that may be used in relation to aviation activities shall be reviewed as part of the general review of this Directive and taking into consideration the development of the international climate change regime. + New entrants, including new entrants in the period from 2008 to 2012 which received neither free allocation nor an entitlement to use CERs and ERUs in the period from 2008-2012, and new sectors shall be able to use credits up to an amount corresponding to a percentage, which shall not be set below 4… − The Commission shall publish this percentage at least six months before the start of each period referred to in Article 3c. + Measures shall be adopted to specify the exact percentages which shall apply under the first, second and third subparagraphs. At least one-third of the additional amount which is to be distributed to existing operators beyond the first percentage referred to in the first subparagraph shall be distri… − 2. Subject to paragraph 3, during the period referred to in Article 11(1), Member States may allow operators to use CERs from project activities in the Community scheme. This shall take place through the issue and immediate surrender of one allowance by the Member State in exchange for one CER. Memb… + Those measures shall ensure that the overall use of credits allowed does not exceed 50 % of the Community-wide reductions below the 2005 levels of the existing sectors under the Community scheme over the period from 2008 to 2020 and 50 % of the Community-wide reductions below the 2005 levels of new … − 3. All CERs and ERUs that are issued and may be used in accordance with the UNFCCC and the Kyoto Protocol and subsequent decisions adopted thereunder may be used in the Community scheme: + Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). − (a) except that, in recognition of the fact that, in accordance with the UNFCCC and the Kyoto Protocol and subsequent decisions adopted thereunder, Member States are to refrain from using CERs and ERUs generated from nuclear facilities to meet their commitments pursuant to Article 3(1) of the Kyoto … + 9. From 1 January 2013, measures may be applied to restrict the use of specific credits from project types. − and + Those measures shall also set the date from which the use of credits under paragraphs 1 to 4 shall be in accordance with these measures. That date shall be, at the earliest, six months from the adoption of the measures or, at the latest, three years from their adoption. + + Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). The Commission shall consider submitting to the Committee a draft of the measures to be taken where… − (b) except for CERs and ERUs from land use, land use change and forestry activities. + + The Community and its Member States shall only authorise project activities where all project participants have headquarters either in a country that has concluded the international agreement relating to such projects or in a country or sub-federal or regional entity which is linked to the Community… + 1a. The Commission shall, by 31 December 2010, examine whether the market for emissions allowances is sufficiently protected from insider dealing or market manipulation and, if appropriate, shall bring forward proposals to ensure such protection. The relevant provisions of Directive 2003/6/EC of the… + + + 3a. An obligation to surrender allowances shall not arise in respect of emissions verified as captured and transported for permanent storage to a facility for which a permit is in force in accordance with Directive 2009/31/EC of the European Parliament and of the Council of 23 April 2009 on the geol… + 5. Paragraphs 1 and 2 apply without prejudice to Article 10c. + + 1. Allowances issued from 1 January 2013 onwards shall be valid for emissions during periods of eight years beginning on 1 January 2013. + + 2. Four months after the beginning of each period referred to in paragraph 1, allowances which are no longer valid and have not been surrendered and cancelled in accordance with Article 12 shall be cancelled by the competent authority. − 1. Allowances shall be valid for emissions during the period referred to in Article 11(1) or (2) for which they are issued. + Member States shall issue allowances to persons for the current period to replace any allowances held by them which are cancelled in accordance with the first subparagraph. − 2. Four months after the beginning of the first five-year period referred to in Article 11(2), allowances which are no longer valid and have not been surrendered and cancelled in accordance with Article 12(3) shall be cancelled by the competent authority. + ### Article 14 — Monitoring and reporting of emissions − Member States may issue allowances to persons for the current period to replace any allowances held by them which are cancelled in accordance with the first subparagraph. + 1. By 31 December 2011, the Commission shall adopt a regulation for the monitoring and reporting of emissions and, where relevant, activity data, from the activities listed in Annex I, for the monitoring and reporting of tonne-kilometre data for the purpose of an application under Articles 3e or 3f,… − 3. Four months after the beginning of each subsequent five-year period referred to in Article 11(2), allowances which are no longer valid and have not been surrendered and cancelled in accordance with ►M2 Article 12(2a) or (3)** ◄ ** shall be cancelled by the competent authority. + That measure, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). − Member States shall issue allowances to persons for the current period to replace any allowances held by them which are cancelled in accordance with the first subparagraph. + 2. The regulation referred to in paragraph 1 shall take into account the most accurate and up-to-date scientific evidence available, in particular from the IPCC, and may also specify requirements for operators to report on emissions associated with the production of goods produced by energy intensiv… − ### Article 14 — Guidelines for monitoring and reporting of emissions + Those requirements may include reporting on levels of emissions from electricity generation covered by the Community scheme associated with the production of such goods. − 1. ►M3 The Commission shall adopt guidelines for the monitoring and reporting of emissions resulting from the activities listed in Annex I of greenhouse gases specified in relation to those activities. Those measures, designed to amend non-essential elements of this Directive, by supplementing it, s… + 3. Member States shall ensure that each operator of an installation or an aircraft operator monitors and reports the emissions from that installation during each calendar year, or, from 1 January 2010, the aircraft which it operates, to the competent authority after the end of that year in accordanc… − 2. Member States shall ensure that emissions are monitored in accordance with the guidelines. + 4. The regulation referred to in paragraph 1 may include requirements on the use of automated systems and data exchange formats to harmonise communication on the monitoring plan, the annual emission report and the verification activities between the operator, the verifier and competent authorities. − 3. Member States shall ensure that each operator or aircraft operator reports the emissions during each calendar year from the installation, or, from 1 January 2010, the aircraft, which it operates to the competent authority after the end of that year in accordance with the guidelines. + ### Article 15 — ►M4 Verification and accreditation** ◄ ** − ### Article 15 — Verification + + By 31 December 2011, the Commission shall adopt a regulation for the verification of emission reports based on the principles set out in Annex V and for the accreditation and supervision of verifiers. It shall specify conditions for the accreditation and withdrawal of accreditation, for mutual recog… + + That measure, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). + + ### Article 15a — Disclosure of information and professional secrecy + Member States and the Commission shall ensure that all decisions and reports relating to the quantity and allocation of allowances and to the monitoring, reporting and verification of emissions are immediately disclosed in an orderly manner ensuring non-discriminatory access. + + Information covered by professional secrecy may not be disclosed to any other person or authority except by virtue of the applicable laws, regulations or administrative provisions. + + 4. The excess emissions penalty relating to allowances issued from 1 January 2013 onwards shall increase in accordance with the European index of consumer prices. − 4. During the three-year period beginning 1 January 2005, Member States shall apply a lower excess emissions penalty of EUR 40 for each tonne of carbon dioxide equivalent emitted by that installation for which the operator has not surrendered allowances. Payment of the excess emissions penalty shall… + (a) in the case of an aircraft operator with a valid operating licence granted by a Member State in accordance with the provisions of Council Regulation (EEC) No 2407/92 of 23 July 1992 on licensing of air carriers (15), the Member State which granted the operating licence in respect of that aircraf… − (a) in the case of an aircraft operator with a valid operating licence granted by a Member State in accordance with the provisions of Council Regulation (EEC) No 2407/92 of 23 July 1992 on licensing of air carriers (13), the Member State which granted the operating licence in respect of that aircraf… + + 1. Allowances issued from 1 January 2012 onwards shall be held in the Community registry for the execution of processes pertaining to the maintenance of the holding accounts opened in the Member State and the allocation, surrender and cancellation of allowances under the Commission Regulation referr… + Each Member State shall be able to fulfil the execution of authorised operations under the UNFCCC or the Kyoto Protocol. − 1. Member States shall provide for the establishment and maintenance of a registry in order to ensure the accurate accounting of the issue, holding, transfer and cancellation of allowances. Member States may maintain their registries in a consolidated system, together with one or more other Member S… + + 4. The Regulation referred to in paragraph 3 shall contain appropriate modalities for the Community registry to undertake transactions and other operations to implement arrangements referred to in Article 25(1b). That Regulation shall also include processes for the change and incident management for… + 1. Each year the Member States shall submit to the Commission a report on the application of this Directive. ►M4 That report shall pay particular attention to the arrangements for the allocation of allowances, the operation of registries, the application of the implementing measures on monitoring an… − 1. Each year the Member States shall submit to the Commission a report on the application of this Directive.►M1 This report shall pay particular attention to the arrangements for the allocation of allowances, the use of ERUs and CERs in the Community scheme, the operation of registries, the applicat… + 3. The Commission shall organise an exchange of information between the competent authorities of the Member States concerning developments relating to issues of allocation, the use of ERUs and CERs in the Community scheme, the operation of registries, monitoring, reporting, verification, accreditati… − 3. The Commission shall organise an exchange of information between the competent authorities of the Member States concerning developments relating to issues of allocation, the use of ERUs and CERs in the Community scheme, the operation of registries, monitoring, reporting, verification and complian… + + ### Article 22 — Amendments to the Annexes + The Annexes to this Directive, with the exception of Annexes I, IIa and IIb, may be amended in the light of the reports provided for in Article 21 and of the experience of the application of this Directive. Annexes IV and V may be amended in order to improve the monitoring, reporting and verificatio… − ### Article 22 — Amendments to Annex III + Those measures, designed to amend non-essential elements of this Directive, inter alia, by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). − The Commission may amend Annex III, with the exception of criteria 1, 5 and 7, for the period from 2008 to 2012 in the light of the reports provided for in Article 21 and of the experience of the application of this Directive. Those measures, designed to amend non-essential elements of this Directiv… + 4. Where reference is made to this paragraph, Article 4 and 7 of Decision 1999/468/EC shall apply, having regard to the provisions of Article 8 thereof. + + + 1. From 2008, Member States may apply emission allowance trading in accordance with this Directive to activities and to greenhouse gases which are not listed in Annex I, taking into account all relevant criteria, in particular the effects on the internal market, potential distortions of competition,… + + (a) in accordance with the regulatory procedure referred to in Article 23(2), if the inclusion refers to installations which are not covered by Annex I; or + + (b) in accordance with the regulatory procedure with scrutiny referred to in Article 23(3), if the inclusion refers to activities and greenhouse gases which are not listed in Annex I. Those measures are designed to amend non-essential elements of this Directive by supplementing it. + + 2. When the inclusion of additional activities and gases is approved, the Commission may at the same time authorise the issue of additional allowances and may authorise other Member States to include such additional activities and gases. + + 3. On the initiative of the Commission or at the request of a Member State, a regulation may be adopted on the monitoring of, and reporting on, emissions concerning activities, installations and greenhouse gases which are not listed as a combination in Annex I, if that monitoring and reporting can b… + That measure, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). + + ### Article 24a — Harmonised rules for projects that reduce emissions − 1. Taking into account all relevant criteria, in particular the effects on the internal market, potential distortions of competition, the environmental integrity of the scheme and the reliability of the planned monitoring and reporting system, Member States may, from 2008, apply emission allowance t… + 1. In addition to the inclusions provided for in Article 24, implementing measures for issuing allowances or credits in respect of projects administered by Member States that reduce greenhouse gas emissions not covered by the Community scheme may be adopted. − (a) installations which are not listed in Annex I, provided that inclusion of such installations is approved by the Commission in accordance with the regulatory procedure referred to in Article 23(2), and + Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). − (b) activities and greenhouse gases which are not listed in Annex I, provided that the inclusion of such activities and greenhouse gases is approved by the Commission. Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with … + Any such measures shall not result in the double-counting of emission reductions nor impede the undertaking of other policy measures to reduce emissions not covered by the Community scheme. Measures shall only be adopted where inclusion is not possible in accordance with Article 24, and the next rev… − From 2005, Member States may under the same conditions apply emissions allowance trading to installations carrying out activities listed in Annex I below the capacity limits referred to in that Annex. + 2. Implementing measures that set out the details for crediting in respect of Community-level projects referred to in paragraph 1 may be adopted. − 2. Allocations made to installations carrying out such activities shall be specified in the national allocation plan referred to in Article 9. + Those measures, designed to amend non-essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). − 3. The Commission may, on its own initiative, or shall, on request by a Member State, adopt monitoring and reporting guidelines for emissions from activities, installations and greenhouse gases which are not listed in Annex I if the monitoring and reporting of these emissions can be carried out with… + 3. A Member State can refuse to issue allowances or credits in respect of certain types of projects that reduce greenhouse gas emissions on its own territory. − Those measures, designed to amend non-essential elements of this Directive, by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 23(3). + Such projects will be executed on the basis of the agreement of the Member State in which the project takes place. − 4. In the event that such measures are introduced, reviews carried out pursuant to Article 30 shall also consider whether Annex I should be amended to include emissions from these activities in a harmonised way throughout the Community. + 1a. Agreements may be made to provide for the recognition of allowances between the Community scheme and compatible mandatory greenhouse gas emissions trading systems with absolute emissions caps established in any other country or in sub-federal or regional entities. + + 1b. Non-binding arrangements may be made with third countries or with sub-federal or regional entities to provide for administrative and technical coordination in relation to allowances in the Community scheme or other mandatory greenhouse gas emissions trading systems with absolute emissions caps. + + ‘Where emissions of a greenhouse gas from an installation are specified in Annex I to Directive 2003/87/EC of the European Parliament and of the Council of 13 October 2003 establishing a scheme for greenhouse gas emission allowance trading within the Community and amending Council Directive 96/61/EC… − ‘Where emissions of a greenhouse gas from an installation are specified in Annex I to Directive 2003/87/EC of the European Parliament and of the Council of 13 October 2003 establishing a scheme for greenhouse gas emission allowance trading within the Community and amending Council Directive 96/61/EC… + + ### Article 27 — Exclusion of small installations subject to equivalent measures + + 1. Following consultation with the operator, Member States may exclude from the Community scheme installations which have reported to the competent authority emissions of less than 25 000 tonnes of carbon dioxide equivalent and, where they carry out combustion activities, have a rated thermal input … + + (a) it notifies the Commission of each such installation, specifying the equivalent measures applying to that installation that will achieve an equivalent contribution to emission reductions that are in place, before the list of installations pursuant to Article 11(1) has to be submitted and at the … + + (b) it confirms that monitoring arrangements are in place to assess whether any installation emits 25 000 tonnes or more of carbon dioxide equivalent, excluding emissions from biomass, in any one calendar year. Member States may allow simplified monitoring, reporting and verification measures for in… + + (c) it confirms that if any installation emits 25 000 tonnes or more of carbon dioxide equivalent, excluding emissions from biomass, in any one calendar year or the measures applying to that installation that will achieve an equivalent contribution to emission reductions are no longer in place, the … + + (d) it publishes the information referred to in points (a), (b) and (c) for public comment. + + Hospitals may also be excluded if they undertake equivalent measures. + + 2. If, following a period of three months from the date of notification for public comment, the Commission does not object within a further period of six months, the exclusion shall be deemed approved. + + Following the surrender of allowances in respect of the period during which the installation is in the Community scheme, the installation shall be excluded and the Member State shall no longer issue free allowances to the installation pursuant to Article 10a. + + 3. When an installation is reintroduced into the Community scheme pursuant to paragraph 1(c), any allowances issued pursuant to Article 10a shall be granted starting with the year of the reintroduction. Allowances issued to these installations shall be deducted from the quantity to be auctioned purs… + + Any such installation shall stay in the Community scheme for the rest of the trading period. + + 4. For installations which have not been included in the Community scheme during the period from 2008 to 2012, simplified requirements for monitoring, reporting and verification may be applied for determining emissions in the three years preceding the notification under paragraph 1 point (a). + + ### Article 28 — Adjustments applicable upon the approval by the Community of an international agreement on climate change + + 1. Within three months of the signature by the Community of an international agreement on climate change leading, by 2020, to mandatory reductions of greenhouse gas emissions exceeding 20 % compared to 1990 levels, as reflected in the 30 % reduction commitment as endorsed by the European Council of … + + (a) the nature of the measures agreed upon in the framework of the international negotiations as well as the commitments made by other developed countries to comparable emission reductions to those of the Community and the commitments made by economically more advanced developing countries to contri… + (b) the implications of the international agreement on climate change, and consequently, options required at Community level, in order to move to the more ambitious 30 % reduction target in a balanced, transparent and equitable way, taking into account work under the Kyoto Protocol's first commitmen… − ### Article 27 — Temporary exclusion of certain installations + (c) the Community manufacturing industries' competitiveness in the context of carbon leakage risks; − 1. Member States may apply to the Commission for installations to be temporarily excluded until 31 December 2007 at the latest from the Community scheme. Any such application shall list each such installation and shall be published. + (d) the impact of the international agreement on climate change on other Community economic sectors; − 2. If, having considered any comments made by the public on that application, the Commission decides, in accordance with the procedure referred to in Article 23(2), that the installations will: + (e) the impact on the Community agriculture sector, including carbon leakage risks; + + (f) the appropriate modalities for including emissions and removals related to land use, land use change and forestry in the Community; − (a) as a result of national policies, limit their emissions as much as would be the case if they were subject to the provisions of this Directive; + (g) afforestation, reforestation, avoided deforestation and forest degradation in third countries in the event of the establishment of any internationally recognised system in this context; − (b) be subject to monitoring, reporting and verification requirements which are equivalent to those provided for pursuant to Articles 14 and 15; and + (h) the need for additional Community policies and measures in view of the greenhouse gas reduction commitments of the Community' and of Member States. − (c) be subject to penalties at least equivalent to those referred to in Article 16(1) and (4) in the case of non-fulfilment of national requirements; + 2. On the basis of the report referred to in paragraph 1, the Commission shall, as appropriate, submit a legislative proposal to the European Parliament and to the Council amending this Directive pursuant to paragraph 1, with a view to the amending Directive entering into force upon the approval by … − it shall provide for the temporary exclusion of those installations from the Community scheme. + The proposal shall be based upon the principles of transparency, economic efficiency and cost-effectiveness, as well as fairness and solidarity in the distribution of efforts between Member States. − It must be ensured that there will be no distortion of the internal market. + 3. The proposal shall allow, as appropriate, operators to use, in addition to the credits provided for in this Directive, CERs, ERUs or other approved credits from third countries which have ratified the international agreement on climate change. − ### Article 28 — Pooling + 4. The proposal shall also include, as appropriate, any other measures needed to help reach the mandatory reductions in accordance with paragraph 1 in a transparent, balanced and equitable way and, in particular, shall include implementing measures to provide for the use of additional types of proje… − 1. Member States may allow operators of installations carrying out one of the activities listed in Annex I to form a pool of installations from the same activity for the period referred to in Article 11(1) and/or the first five-year period referred to in Article 11(2) in accordance with paragraphs 2… + 5. The proposal shall include the appropriate transitional and suspensive measures pending the entry into force of the international agreement on climate change. − 2. Operators carrying out an activity listed in Annex I who wish to form a pool shall apply to the competent authority, specifying the installations and the period for which they want the pool and supplying evidence that a trustee will be able to fulfil the obligations referred to in paragraphs 3 an… + ### Article 29 — Report to ensure the better functioning of the carbon market − 3. Operators wishing to form a pool shall nominate a trustee: + If, on the basis of the regular reports on the carbon market referred to in Article 10(5), the Commission has evidence that the carbon market is not functioning properly, it shall submit a report to the European Parliament and to the Council. The report may be accompanied, if appropriate, by proposa… − (a) to be issued with the total quantity of allowances calculated by installation of the operators, by way of derogation from Article 11; + ### Article 29a — Measures in the event of excessive price fluctuations − (b) to be responsible for surrendering allowances, other than allowances issued under Chapter II, equal to the total emissions from installations in the pool, by way of derogation from Articles 6(2)(e) and 12(3); and + 1. If, for more than six consecutive months, the allowance price is more than three times the average price of allowances during the two preceding years on the European carbon market, the Commission shall immediately convene a meeting of the Committee established by Article 9 of Decision No 280/2004… − (c) to be restricted from making further transfers in the event that an operator's report has not been verified as satisfactory in accordance with the second paragraph of Article 15. + 2. If the price evolution referred to in paragraph 1 does not correspond to changing market fundamentals, one of the following measures may be adopted, taking into account the degree of price evolution: − 4. The trustee shall be subject to the penalties applicable for breaches of requirements to surrender sufficient allowances, other than allowances issued under Chapter II, to cover the total emissions from installations in the pool, by way of derogation from Article 16(2), (3) and (4). + (a) a measure which allows Member States to bring forward the auctioning of a part of the quantity to be auctioned; − 5. A Member State that wishes to allow one or more pools to be formed shall submit the application referred to in paragraph 2 to the Commission. Without prejudice to the Treaty, the Commission may within three months of receipt reject an application that does not fulfil the requirements of this Dire… + (b) a measure which allows Member States to auction up to 25 % of the remaining allowances in the new entrants reserve. − 6. In the event that the trustee fails to comply with penalties referred to in paragraph 4, each operator of an installation in the pool shall be responsible under Articles 12(3) and 16 in respect of emissions from its own installation. + Those measures shall be adopted in accordance with the management procedure referred to in Article 23(4). − ### Article 29 — *Force majeure* + 3. Any measure shall take utmost account of the reports submitted by the Commission to the European Parliament and to the Council pursuant to Article 29, as well as any other relevant information provided by Member States. − 1. During the period referred to in Article 11(1), Member States may apply to the Commission for certain installations to be issued with additional allowances in cases of *force majeure*. The Commission shall determine whether *force majeure* is demonstrated, in which case it shall authorise the iss… + 4. The arrangements for the application of these provisions shall be laid down in the regulation referred to in Article 10(4). − 2. The Commission shall, without prejudice to the Treaty, develop guidance to describe the circumstances under which *force majeure* is demonstrated, by 31 December 2003 at the latest. + Member States shall, in accordance with Article 3 of Decision No 280/2004/EC of the European Parliament and of the Council of 11 February 2004 concerning a mechanism for monitoring Community greenhouse gas emissions and for implementing the Kyoto Protocol (17), report to the Commission every two yea… − Member States shall, in accordance with Article 3 of Decision No 280/2004/EC of the European Parliament and of the Council of 11 February 2004 concerning a mechanism for monitoring Community greenhouse gas emissions and for implementing the Kyoto Protocol (15), report to the Commission every two yea… + (i) the impact of the exemption from the Community scheme of certain flights performed in the framework of public service obligations imposed in accordance with Council Regulation (EEC) No 2408/92 of 23 July 1992 on access for Community air carriers to intra-Community air routes (18); − (i) the impact of the exemption from the Community scheme of certain flights performed in the framework of public service obligations imposed in accordance with Council Regulation (EEC) No 2408/92 of 23 July 1992 on access for Community air carriers to intra-Community air routes (16); + + | 1. | Installations or parts of installations used for research, development and testing of new products and processes and installations exclusively using biomass are not covered by this Directive. | + | --- | --- | + | 2. | The thresholds values given below generally refer to production capacities or outputs. Where several activities falling under the same category are carried out in the same installation, the capacities of such activities are added together. | + | --- | --- | + + | 3. | When the total rated thermal input of an installation is calculated in order to decide upon its inclusion in the Community scheme, the rated thermal inputs of all technical units which are part of it, in which fuels are combusted within the installation, are added together. These units could … + | --- | --- | − 1. Installations or parts of installations used for research, development and testing of new products and processes are not covered by this Directive. + | 4. | If a unit serves an activity for which the threshold is not expressed as total rated thermal input, the threshold of this activity shall take precedence for the decision about the inclusion in the Community scheme. | + | --- | --- | − 2. The threshold values given below generally refer to production capacities or outputs. Where one operator carries out several activities falling under the same subheading in the same installation or on the same site, the capacities of such activities are added together. + | 5. | When the capacity threshold of any activity in this Annex is found to be exceeded in an installation, all units in which fuels are combusted, other than units for the incineration of hazardous or municipal waste, shall be included in the greenhouse gas emission permit. | + | --- | --- | … diff truncated at 500 changed lines …
| tier | A, publisher-supplied validity dates |
| history begins | publisher |
| index built | 2026-08-07T19:46:23Z · corpus 8d5e859 |
| stamp signature | valid (ECDSA-P256) |