What changed, Commission Delegated Regulation (EU) No 241/2014 of 7 January 2014 supplementing Regulation (EU) No 575/2013

2020-12-23 → 2023-05-09 · no interpretation, just the text delta

on 2020-12-23eu-eurlex:32014r0241:2020-12-23 (2020-12-23 → 2023-05-08) · official source ↗
on 2023-05-09eu-eurlex:32014r0241:2023-05-09 (2023-05-09 → open) · official source ↗

Open the structured article comparison → matched by provision anchor when continuity is sufficient; otherwise Lex refuses rather than inventing changes

633 line(s) in the old middle, 751 in the new; 1 unchanged leading and 1 trailing lines trimmed.

+ ## CHAPTER I — GENERAL
− ## CHAPTER I / **GENERAL**
+ (c) the applicable forms and nature of indirect funding of own funds instruments, in accordance with Article 28(5) of Regulation (EU) No 575/2013 and eligible liabilities instruments in accordance with Article 72b(7), point (a), of that Regulation;
− (c) the applicable forms and nature of indirect funding of capital instruments, according to Article 28(5) of Regulation (EU) No 575/2013;
+ (ha) the form and nature of incentives to redeem for the purposes of the condition set out in Article 72b(2), first subparagraph, point (g), and Article 72c(3) of Regulation (EU) No 575/2013, in accordance with Article 72b(7), point (b), of that Regulation;
+ 
+ (i) the extent of conservatism required in estimates used as an alternative to the calculation of underlying exposures for indirect holdings arising from index holdings and the meaning of operationally burdensome for the institution to monitor those underlying exposures, in accordance with Article 7…
− (i) the extent of conservatism required in estimates used as an alternative to the calculation of underlying exposures for indirect holdings arising from index holdings, according to Article 76(4) of Regulation (EU) No 575/2013;
+ 
+ (ja) the procedure, including the limits and information requirements, for granting the permission to reduce eligible liabilities instruments, and the process of cooperation between the competent authority and the resolution authority in accordance with Article 78a(3) of Regulation (EU) No 575/2013;
+ (k) the conditions for a temporary waiver for deduction from own funds and eligible liabilities to be provided, in accordance with Article 79(2) of Regulation (EU) No 575/2013;
− (k) the conditions for a temporary waiver for deduction from own funds to be provided, according to Article 79(2) of Regulation (EU) No 575/2013;
+ 
+ ### Article 1a — Application of this Regulation to entities subject to the minimum requirement for own funds and eligible liabilities, and to eligible liabilities referred to in Directive 2014/59/EU
+ 
+ For the purposes of the application of Articles 8, 9 and 20, and Chapter IV, Section 2, of this Regulation, entities subject to the minimum requirement for own funds and eligible liabilities referred to in Article 45(1) of Directive 2014/59/EU shall be considered to be ‘institutions’, and ‘eligible …
+ ## CHAPTER II — ELEMENTS OF OWN FUNDS AND ELIGIBLE LIABILITIES / SECTION 1 — Common Equity Tier 1 capital and eligible liabilities items and instruments / Subsection 1 — Foreseeable dividends and charges
− ## Subsection 1 / **Foreseeable dividends and charges**
+ ## CHAPTER II — ELEMENTS OF OWN FUNDS AND ELIGIBLE LIABILITIES / SECTION 1 — Common Equity Tier 1 capital and eligible liabilities items and instruments / Subsection 2 — Cooperative societies, savings institutions, mutuals and similar institutions
− ## Subsection 2 / **Cooperative societies, savings institutions, mutuals and similar institutions**
+ **2.** To qualify as a cooperative society for the purposes of paragraph 1, an institution’s legal status shall fall within one of the following categories:(a) in Austria: institutions registered as ‘eingetragene Genossenschaft (e.Gen.)’ or ‘registrierte Genossenschaft’ under the ‘Gesetz über Erwerb…
− **2.** To qualify as a cooperative society for the purposes of paragraph 1, an institution’s legal status shall fall within one of the following categories:(a) in Austria: institutions registered as ‘eingetragene Genossenschaft (e.Gen.)’ or ‘registrierte Genossenschaft’ under the ‘Gesetz über Erwerb…
+ 
+ ## CHAPTER II — ELEMENTS OF OWN FUNDS AND ELIGIBLE LIABILITIES / SECTION 1 — Common Equity Tier 1 capital and eligible liabilities items and instruments / Subsection 3 — Indirect funding
+ ### Article 8 — Indirect funding of capital instruments for the purposes of Article 28(1), point (b), Article 52(1), point (c), and Article 63, point (c), and of liabilities for the purpose of Article 72b(2), point (c), of Regulation (EU) No 575/2013
+ 
+ **1.** Indirect funding of capital instruments under Article 28(1), point (b), Article 52(1), point (c) and Article 63, point (c), and liabilities under Article 72b(2), point (c), of Regulation (EU) No 575/2013 shall be deemed funding that is not direct.
+ 
+ **2.** For the purposes of paragraph 1, direct funding shall refer to situations where an institution has granted a loan or other funding in any form to an investor that is used for the acquisition of ownership of the institution’s capital instruments or liabilities.
+ 
+ **3.** Direct funding shall also include funding granted for other purposes than acquiring ownership of the capital instruments or liabilities of an institution, to any natural or legal person who has a qualifying holding in the institution, as referred to in Article 4(1), point (36), of Regulation …
+ 
+ ### Article 9 — Applicable forms and nature of indirect funding of capital instruments for the purposes of Article 28(1), point (b), Article 52(1), point (c) and Article 63, point (c), and of liabilities for the purpose of Article 72b(2), point (c), of Regulation (EU) No 575/2013
− ## Subsection 3 / **Indirect funding**
+ **1.** The applicable forms and nature of indirect funding of the acquisition of ownership of the capital instruments and liabilities of an institution shall include all of the following:(a) funding of an investor’s acquisition of ownership, at issuance or thereafter, of the capital instruments or l…
− ### Article 8 — Indirect funding of capital instruments for the purposes of Article 28(1)(b,) Article 52(1)(c) and Article 63(c) of Regulation (EU) No 575/2013
+ **2.** In order to be considered as indirect funding for the purposes of paragraph 1, the following conditions shall also be met, where applicable:(a) the investor is not included in any of the following:(i) the scope of accounting or prudential consolidation of the institution;(ii) the scope of the…
− **1.** Indirect funding of capital instruments under Article 28(1)(b), Article 52(1)(c) and Article 63(c) of Regulation (EU) No 575/2013 shall be deemed funding that is not direct.
+ For the purposes of point (a)(ii), an investor shall be deemed to be included in the scope of the extended aggregated calculation where the relevant capital instrument or liability is subject to consolidation or extended aggregated calculation in accordance with Article 49(3), point (a)(iv), of Regu…
− **2.** For the purposes of paragraph 1, direct funding shall refer to situations where an institution has granted a loan or other funding in any form to an investor that is used for the purchase of its capital instruments.
+ **2a.** The applicable forms and nature of indirect funding of the acquisition of ownership of the capital instruments and liabilities of an institution shall include intragroup circular funding.
− **3.** Direct funding shall also include funding granted for other purposes than purchasing an institution’s capital instruments, to any natural or legal person who has a qualifying holding in the credit institution, as referred to in Article 4(36) of Regulation (EU) No 575/2013, or who is deemed to…
+ For those purposes, intragroup circular funding means any of the following:
− ### Article 9 — Applicable forms and nature of indirect funding of capital instruments for the purposes of Article 28(1)(b) and 52(1)(c) and 63(c) of Regulation (EU) No 575/2013
+ (a) situations where an institution has granted a loan or other funding in any form to one of the entities referred to in paragraph 1, point (a), through another entity referred to in paragraph 1, point (a), that is used for the acquisition of ownership of the institution’s capital instruments or li…
− **1.** The applicable forms and nature of indirect funding of the purchase of an institution’s capital instruments shall include the following:(a) funding of an investor’s purchase, at issuance or thereafter, of an institution’s capital instruments by any entities on which the institution has a dire…
+ (b) funding granted to one of the entities referred to in paragraph 1, point (a), for other purposes than acquiring ownership of the capital instruments or liabilities of an institution through another entity referred to in paragraph 1, point (a), provided that, taking into account any additional gu…
− **2.** In order to be considered as indirect funding for the purposes of paragraph 1, the following conditions shall also be met, where applicable:(a) the investor is not included in any of the following:(1) the scope of accounting or prudential consolidation of the institution;(2) the scope of the …
+ **3.** When establishing whether the acquisition of ownership of a capital instrument or liability involves direct or indirect funding as referred to in Article 8, the amount to be considered shall be net of any individually assessed impairment allowance made.
− **3.** When establishing whether the purchase of a capital instrument involves direct or indirect funding in accordance with Article 8, the amount to be considered shall be net of any individually assessed impairment allowance made.
+ **4.** In order to avoid a qualification of direct or indirect funding as referred to in Article 8 and where the loan or other form of funding or guarantees is granted to any natural or legal person who has a qualifying holding in the institution or who is deemed to be a related party as referred to…
− **4.** In order to avoid a qualification of direct or indirect funding in accordance with Article 8 and where the loan or other form of funding or guarantees is granted to any natural or legal person who has a qualifying holding in the credit institution or who is deemed to be a related party as ref…
+ **5.** With regard to mutuals, cooperative societies and similar institutions, where a customer is obliged under national law or the statutes of the institution to subscribe capital instruments to receive a loan, that loan shall not be considered as a direct or indirect funding where all of the foll…
− **5.** With regard to mutuals, cooperative societies and similar institutions, where there is an obligation under national law or the statutes of the institution for a customer to subscribe capital instruments in order to receive a loan, that loan shall not be considered as a direct or indirect fund…
+ ## CHAPTER II — ELEMENTS OF OWN FUNDS AND ELIGIBLE LIABILITIES / SECTION 1 — Common Equity Tier 1 capital and eligible liabilities items and instruments / Subsection 4 — Limitations on redemption of capital instruments
− ## Subsection 4 / **Limitations on redemption of capital instruments**
+ ## CHAPTER II — ELEMENTS OF OWN FUNDS AND ELIGIBLE LIABILITIES / SECTION 2 — Prudential Filters
− ## *SECTION 2* / ***Prudential Filters***
+ **3.** The recognised gain on sale which is associated with the future margin income, shall refer, in this context, to the expected future ‘excess spread’ defined as the finance charge collections and other fee income received in respect of the securitised exposures net of costs and expenses.
− **3.** The recognised gain on sale which is associated with the future margin income, shall refer, in this context, to the expected future ‘excess spread’ as defined in Article 242 of Regulation (EU) No 575/2013.
+ ## CHAPTER II — ELEMENTS OF OWN FUNDS AND ELIGIBLE LIABILITIES / SECTION 3 — Deductions from Common Equity Tier 1 items
− ## *SECTION 3* / ***Deductions from Common Equity Tier 1 items***
+ ## CHAPTER II — ELEMENTS OF OWN FUNDS AND ELIGIBLE LIABILITIES / SECTION 4 — Other deductions for Common Equity Tier 1, additional Tier 1 and Tier 2 items
− ## *SECTION 4* / ***Other deductions for Common Equity Tier 1, additional Tier 1 and Tier 2 items***
+ ## CHAPTER III — ADDITIONAL TIER 1 AND TIER 2 CAPITAL AND ELIGIBLE LIABILITIES / SECTION 1 — Form and nature of incentives to redeem
− ## *SECTION 1* / ***Form and nature of incentives to redeem***
+ ### Article 20 — Form and nature of incentives to redeem for the purposes of Article 52(1), point (g), Article 63, point (h), Article 72b(2), point (g), and Article 72c(3) of Regulation (EU) No 575/2013
− ### Article 20 — Form and nature of incentives to redeem for the purposes of Article 52(1)(g) and 63(h)of Regulation (EU) No 575/2013
+ **1.** Incentives to redeem shall mean all features that provide, at the date of issuance, an expectation that the capital instrument or the liability is likely to be redeemed.
− **1.** Incentives to redeem shall mean all features that provide, at the date of issuance, an expectation that the capital instrument is likely to be redeemed.
+ **2.** The incentives referred to in paragraph 1 shall include the following forms:(a) a call option combined with an increase in the credit spread of the instrument or the liability if the call is not exercised;(b) a call option combined with a requirement or an investor option to convert the instr…
− **2.** The incentives referred to in paragraph 1 shall include the following forms:(a) a call option combined with an increase in the credit spread of the instrument if the call is not exercised;(b) a call option combined with a requirement or an investor option to convert the instrument into a Comm…
+ ## CHAPTER III — ADDITIONAL TIER 1 AND TIER 2 CAPITAL AND ELIGIBLE LIABILITIES / SECTION 2 — Conversion or write-down of the principal amount
− ## *SECTION 2* / ***Conversion or write-down of the principal amount***
+ ## CHAPTER III — ADDITIONAL TIER 1 AND TIER 2 CAPITAL AND ELIGIBLE LIABILITIES / SECTION 3 — Features of instruments that could hinder recapitalisation
− ## *SECTION 3* / ***Features of instruments that could hinder recapitalisation***
+ ## CHAPTER III — ADDITIONAL TIER 1 AND TIER 2 CAPITAL AND ELIGIBLE LIABILITIES / SECTION 4 — Use of special purposes entities for indirect issuance of own funds instruments
− ## *SECTION 4* / ***Use of special purposes entities for indirect issuance of own funds instruments***
+ ## CHAPTER IV — GENERAL REQUIREMENTS / SECTION 1 — Indirect holdings arising from index holdings
− ## *SECTION 1* / ***Indirect holdings arising from index holdings***
+ **1.** An estimate shall be sufficiently conservative where either of the following conditions is met:(a) where the investment mandate of the index specifies that an own funds instrument of a financial sector entity or an eligible liabilities instrument of an institution which is part of the index c…
− **1.** An estimate is sufficiently conservative when either of the following conditions is met:(a) where the investment mandate of the index specifies that a capital instrument of a financial sector entity which is part of the index cannot exceed a maximum percentage of the index, the institution us…
+ **2.** For the purposes of paragraph 1, the following shall apply:(a) an indirect holding arising from an index holding comprises the proportion of the index invested in the Common Equity Tier 1, Additional Tier 1 and Tier 2 instruments of financial sector entities and in eligible liabilities instru…
− **2.** For the purposes of paragraph 1, the following shall apply:(a) an indirect holding arising from an index holding comprises the proportion of the index invested in the Common Equity Tier 1, Additional Tier 1 and Tier 2 instruments of financial sector entities included in the index;(b) an index…
+ **1.** For the purpose of Article 76(3) of Regulation (EU) No 575/2013, operationally burdensome shall mean situations under which look-through approaches to capital instruments holdings in financial sector entities or to eligible liabilities instruments holdings in institutions on an ongoing basis …
− **1.** For the purpose of Article 76(3) of Regulation (EU) No 575/2013, operationally burdensome shall mean situations under which look-through approaches to capital holdings in financial sector entities on an ongoing basis are unjustified, as assessed by the competent authorities. In their assessme…
+ 
+ ## CHAPTER IV — GENERAL REQUIREMENTS / SECTION 2 — Permission for reducing own funds and eligible liabilities / Subsection 1 — Supervisory permission for reducing own funds
+ 
+ ### Article 27 — Meaning of sustainable for the income capacity of the institution for the purposes of Article 78(1), point (a), and Article 78(4), point (d), of Regulation (EU) No 575/2013
+ 
+ Sustainable for the income capacity of the institution under Article 78(1), point (a), and under Article 78(4), point (d), of Regulation (EU) No 575/2013 shall mean that the profitability of the institution, as assessed by the competent authority, continues to be sound or does not see any negative c…
+ 
+ ### Article 28 — Process requirements including the limits and procedures for an application by an institution to reduce own funds pursuant to Article 77(1) of Regulation (EU) No 575/2013
+ 
+ **1.** Redemptions, reductions and repurchases of own funds instruments shall not be announced to holders of the instruments before the institution has obtained the prior permission of the competent authority.
+ 
+ **2.** Where the actions listed in Article 77(1) of Regulation (EU) No 575/2013 are expected to take place with sufficient certainty, and once the prior permission of the competent authority has been obtained, the institution shall deduct the corresponding amounts of own funds instruments to be rede…
+ 
+ **3.** In the case of a general prior permission as referred to in Article 78(1), second subparagraph, of Regulation (EU) No 575/2013, the predetermined amount for which the competent authority has given its permission shall be deducted from corresponding elements of the institution’s own funds from…
+ 
+ **4.** When applying for a prior permission, including a general prior permission referred to in Article 78(1), second subparagraph, of Regulation (EU) No 575/2013, for actions listed in Article 77(1) of that Regulation, and where the related own funds instruments are purchased for passing them on t…
+ 
+ **5.** The competent authority shall grant a prior permission, other than the general prior permission referred to in Article 78(1), second subparagraph, of Regulation (EU) No 575/2013, for a specified period of time, necessary to perform any of the actions listed in Article 77(1) of that Regulation…
+ 
+ **6.** Paragraphs 1 to 5 shall apply at consolidated, sub-consolidated and individual levels of application of prudential requirements, as applicable.
+ 
+ ### Article 29 — Submission by the institution of an application to reduce own funds pursuant to Article 77(1) of Regulation (EU) No 575/2013
+ 
+ **1.** An institution shall submit an application for prior permission, including the general prior permission referred to in Article 78(1), second subparagraph, of Regulation (EU) No 575/2013, to the competent authority before taking any of the actions referred to in Article 77(1) of that Regulatio…
+ 
+ **2.** Paragraph 1 shall apply at consolidated, sub-consolidated and individual levels of application of prudential requirements, as applicable.
+ 
+ ### Article 30 — Content of the application to be submitted by the institution for the purposes of Article 77(1) of Regulation (EU) No 575/2013
+ 
+ **1.** The application referred to in Article 29 shall be accompanied by all of the following:(a) a well-founded explanation of the rationale for performing any of the actions referred to in Article 77(1) of Regulation (EU) No 575/2013;(b) information about whether the permission sought is based on …
+ 
+ For the purposes of point (e), the information shall cover at least a three year period and, with regard to liabilities, shall include specifications of the following amounts, as applicable:
+ 
+ (a) liabilities which qualify as eligible liabilities instruments pursuant to Article 72b(2) of Regulation (EU) No 575/2013;
+ 
+ (b) liabilities which the resolution authority has permitted to qualify as eligible liabilities instruments pursuant to Article 72b, paragraphs 3 or 4, of Regulation (EU) No 575/2013;
+ 
+ (c) liabilities which are included in the amount of own funds and eligible liabilities of resolution entities pursuant to Article 45b(1) of Directive 2014/59/EU;
+ 
+ (d) liabilities that arise from debt instruments with embedded derivatives included in the amount of own funds and eligible liabilities pursuant to Article 45(b), point (2), of Directive 2014/59/EU;
+ 
+ (e) liabilities issued by a subsidiary which qualify for inclusion in the consolidated eligible liabilities instruments of an institution subject to Article 92a of Regulation (EU) No 575/2013 pursuant to Article 88a of that Regulation or of a resolution entity pursuant to Article 45b(3) of Directive…
+ 
+ (f) eligible liabilities instruments taken into account for the purpose of complying with the requirement for own funds and eligible liabilities for institutions that are material subsidiaries of non-EU G-SIIs pursuant to Article 92b(3) of Regulation (EU) No 575/2013 and for the purpose of complying…
+ 
+ **2.** The competent authority shall waive the submission of some of the information listed in paragraph 1 where it is satisfied that it already has that information.
+ 
+ **3.** Paragraphs 1 and 2 shall apply at individual, consolidated and sub-consolidated levels of application of requirements, as applicable.
+ 
+ ### Article 30a — Additional information to be submitted with an application for a general prior permission for actions listed in Article 77(1) of Regulation (EU) No 575/2013
+ 
+ **1.** Where a general prior permission as referred to in Article 78(1), second subparagraph, of Regulation (EU) No 575/2013 for an action under Article 77(1), point (a), of that Regulation is sought for, the application shall specify the amount of each relevant Common Equity Tier 1 issue that is su…
+ 
+ **2.** Where a general prior permission for an action under Article 77(1), point (c), of Regulation (EU) No 575/2013 is sought for, the institution shall specify in the application all of the following:(a) the amount of each relevant outstanding issue subject to the request;(b) the total carrying am…
+ 
+ **3.** An application for a general prior permission for an action under Article 77(1), points (a) and (c), of Regulation (EU) No 575/2013 may include own funds instruments still to be issued, subject to specification of the information referred to in paragraph 2, points (a) and (b), as applicable, …
+ 
+ **4.** Paragraphs 1, 2 and 3 shall apply at the consolidated, sub-consolidated and individual levels of application of prudential requirements, as applicable.
+ 
+ ### Article 30b — Information to be submitted with an application for a renewal of a general prior permission for actions listed in Article 77(1) of Regulation (EU) No 575/2013
+ 
+ **1.** Before the expiry of a general prior permission as referred to in Article 78(1), second subparagraph, of Regulation (EU) No 575/2013, an institution may submit an application for its renewal for a period of up to one additional year each time, provided that the institution does not request an…
+ **2.** When applying for the renewal of the general prior permission referred to in paragraph 1, the institution shall be exempted from the obligation to provide the information referred to in Article 30(1), points (a) to (d), (f), (g) and (i).
+ 
+ ### Article 31 — Timing of the application to be submitted by the institution and processing of the application by the competent authority for the purposes of Article 77(1) of Regulation (EU) No 575/2013
+ 
+ **1.** For a prior permission, other than a general prior permission as referred to in Article 78(1), second subparagraph, of Regulation (EU) No 575/2013, the institution shall transmit a complete application and the information referred to in Article 30 to the competent authority at least four mont…
+ 
+ **2.** For a general prior permission as referred to in Article 78(1), second subparagraph, of Regulation (EU) No 575/2013, the institution shall transmit a complete application and the information referred to in Articles 30 and 30a to the competent authority at least four months before the date on …
+ 
+ **3.** By way of derogation from paragraph 2, where a renewal of a general prior permission pursuant to Article 78(1), second subparagraph, of Regulation (EU) No 575/2013 and Article 30b is sought, the institution shall transmit the application and the information required under Articles 30, 30a and…
+ 
+ **4.** Competent authorities may allow institutions on a case-by-case basis and under exceptional circumstances to transmit the application referred to in paragraphs 1, 2 and 3 within a time frame shorter than the periods set out in those paragraphs.
+ 
+ **5.** The competent authority shall process an application during either the period of time referred to in paragraphs 1, 2 and 3 or during the period of time referred to in paragraph 4. Competent authorities shall take into account new information received during that period, where any such new inf…
+ 
+ ### Article 32 — Applications for redemptions, reductions and repurchases by mutuals, cooperative societies, savings institutions or similar institutions for the purposes of Article 77(1) of Regulation (EU) No 575/2013
+ 
+ **1.** With regard to the redemption of Common Equity Tier 1 instruments of mutuals, cooperative societies, savings institutions or similar institutions, the application referred to in Article 29, paragraphs 1 and 2, and the information referred to in Article 30(1) shall be submitted to the competen…
+ 
+ **2.** Competent authorities may give their permission in advance to an action listed in Article 77(1) of Regulation (EU) No 575/2013 for a certain predetermined amount to be redeemed, net of the amount of the subscription of new paid in Common Equity Tier 1 instruments during a period up to one yea…
+ 
+ ## CHAPTER IV — GENERAL REQUIREMENTS / SECTION 2 — Permission for reducing own funds and eligible liabilities / Subsection 2 — Permission for reducing eligible liabilities instruments
+ 
+ ### Article 32a — Meaning of sustainable for the income capacity of the institution for the purposes of Article 78a(1), point (a), of Regulation (EU) No 575/2013
+ 
+ Sustainable for the income capacity of the institution under Article 78a(1), point (a), of Regulation (EU) No 575/2013 shall mean that the profitability of the institution, as assessed by the resolution authority, continues to be sound or does not see any negative change after the replacement of the…
+ 
+ ### Article 32b — Process requirements, including the limits and procedures for an application by an institution to reduce eligible liabilities instruments pursuant to Article 77(2) of Regulation (EU) No 575/2013
+ 
+ **1.** Calls, redemptions, repayments and repurchases of eligible liabilities instruments shall not be announced to holders of those instruments before the institution has obtained the prior permission of the resolution authority.
+ 
+ **2.** Where the actions listed in Article 77(2) of Regulation (EU) No 575/2013 are expected to take place with sufficient certainty, and once the prior permission of the resolution authority has been obtained, the institution shall deduct the amounts to be called, redeemed, repaid or repurchased fr…
+ 
+ **3.** In the case of a general prior permission as referred to in Article 78a(1), second subparagraph, of Regulation (EU) No 575/2013, the predetermined amount for which the resolution authority has given its permission shall be deducted from the institution’s eligible liabilities instruments from …
+ 
+ **4.** The resolution authority shall grant a prior permission, other than the general prior permission referred to in Article 78a(1), second subparagraph, of Regulation (EU) No 575/2013, for a specified period of time, necessary to perform any of the actions listed in Article 77(2) of that Regulati…
+ 
+ **5.** Where a general prior permission as referred to in Article 78a(1), second subparagraph, of Regulation (EU) No 575/2013 is sought for, the predetermined amount for which the general prior permission is granted shall not exceed 10 % of the total amount of outstanding eligible liabilities instru…
+ 
+ **6.** Paragraphs 1 to 5 shall apply at consolidated, sub-consolidated and individual levels of application of requirements for own funds and eligible liabilities, as applicable.
+ 
+ ### Article 32c — Submission by the institution of an application to reduce eligible liabilities instruments pursuant to Article 77(2) of Regulation (EU) No 575/2013
+ 
+ **1.** An institution shall submit an application for prior permission, including the general prior permission as referred to in Article 78a(1), second subparagraph, of Regulation (EU) No 575/2013, to the resolution authority before taking an action as referred to in Article 77(2) of that Regulation…
+ 
+ **2.** Paragraph 1 shall apply at individual, consolidated and sub-consolidated levels of application of requirements for own funds and eligible liabilities, as applicable.
+ 
+ ### Article 32d — Content of the application to be submitted by the institution for the purposes of Article 77(2) of Regulation (EU) No 575/2013
+ 
+ **1.** The application referred to in Article 32c shall be accompanied by all of the following:(a) a well-founded explanation of the rationale for performing any of the actions referred to in Article 77(2) of Regulation (EU) No 575/2013;(b) information about whether the permission sought is based on…
+ 
+ **2.** The resolution authority shall waive the submission of some of the information listed in paragraph 1 where it is satisfied that it already has that information.
+ 
+ **3.** Paragraphs 1 and 2 shall apply at individual, consolidated and sub-consolidated levels of application of requirements for own funds and eligible liabilities, as applicable.
+ 
+ ### Article 32e — Additional information to be submitted with the application for a general prior permission for actions listed in Article 77(2) of Regulation (EU) No 575/2013
+ 
+ **1.** Where a general prior permission as referred to in Article 78a(1), second subparagraph, of Regulation (EU) No 575/2013 for an action under Article 77(2) of that Regulation is sought for, the institution shall specify in the application the total amount of outstanding eligible liabilities inst…
+ 
+ **2.** An application for a general prior permission for an action under Article 77(2) of Regulation (EU) No 575/2013 may include eligible liabilities instruments still to be issued, subject to specification of the final amount referred to in paragraph 1, to be provided to the resolution authority f…
+ 
+ ### Article 32f — Information to be submitted with an application for a renewal of a general prior permission for actions listed in Article 77(2) of Regulation (EU) No 575/2013
− ## *SECTION 2* / ***Supervisory permission for reducing own funds***
+ **1.** Before the expiry of the general prior permission granted pursuant to Article 78a(1), second subparagraph, of Regulation (EU) No 575/2013, an institution may submit an application for its renewal for a period of up to one additional year each time, provided that the institution does not reque…
− ### Article 27 — Meaning of sustainable for the income capacity of the institution for the purposes of Article 78(1)(a) of Regulation (EU) No 575/2013
+ **2.** When applying for the renewal of a general prior permission referred to in paragraph 1, the institution shall be exempted from the obligation to provide the information referred to in Article 32d(1), points (a), (b), (c), (e), (f) and (h).
− Sustainable for the income capacity of the institution under point (a) of Article 78(1) of Regulation (EU) No 575/2013 shall mean that the profitability of the institution, as assessed by the competent authority, continues to be sound or does not see any negative change after the replacement of the …
+ ### Article 32g — Timing of the application to be submitted by the institution and processing of the application by the resolution authority for the purposes of Article 77(2) of Regulation (EU) No 575/2013
− ### Article 28 — Process and data requirements for an application by an institution to carry out redemptions, reductions and repurchases — for the purposes of Article 77 of Regulation (EU) No 575/2013
+ **1.** For a prior permission, other than the general prior permission referred to in Article 78a(1), second subparagraph, of Regulation (EU) No 575/2013, the institution shall transmit a complete application and the information referred to in Article 32d to the resolution authority at least four mo…
− **1.** Redemptions, reductions and repurchases of own funds instruments shall not be announced to holders of the instruments before the institution has obtained the prior approval of the competent authority.
+ **2.** For the general prior permission referred to in Article 78a(1), second subparagraph, of Regulation (EU) No 575/2013, the institution shall transmit a complete application and the information referred to in Articles 32d and 32e to the resolution authority at least four months before the date o…
− **2.** Where redemptions, reductions and repurchases are expected to take place with sufficient certainty, and once the prior permission of the competent authority has been obtained, the institution shall deduct the corresponding amounts to be redeemed, reduced or repurchased from corresponding elem…
+ **3.** By way of derogation from paragraph 2, where a renewal of the general prior permission pursuant to Article 78a(1), second subparagraph, of Regulation (EU) No 575/2013 and Article 32f is sought, the institution shall transmit a complete application and the information required under Articles 3…
− **3.** Paragraphs 1 and 2 shall apply at the consolidated, sub-consolidated and individual levels of application of prudential requirements, where applicable.
+ **4.** Resolution authorities may allow institutions on a case-by-case basis and under exceptional circumstances to transmit the application referred to in paragraphs 1, 2 and 3 within a time frame shorter than the periods set out in those paragraphs.
− ### Article 29 — Submission of application by the institution to carry out redemptions, reductions and repurchases for the purposes of Article 77 and Article 78 of Regulation (EU) No 575/2013 and appropriate bases of limitation of redemption for the purposes of paragraph 3 of Article 78 of Regulatio…
+ **5.** The resolution authority shall process an application during either the period of time referred to in paragraphs 1, 2 and 3 or during the period of time referred to in paragraph 4. Resolution authorities shall take into account new information received during that period, where any such new i…
− **1.** An institution shall submit an application to the competent authority before reducing or repurchasing Common Equity Tier 1 instruments or calling, redeeming or repurchasing Additional Tier 1 or Tier 2 instruments.
+ ### Article 32h — Simplified requirements for institutions for which the resolution authority has set the minimum requirement for own funds and eligible liabilities laid down in Article 45(1) of Directive 2014/59/EU at a level that does not exceed an amount sufficient to absorb losses
− **2.** The application may include a plan to carry out, over a limited period of time, actions listed in Article 77 of Regulation (EU) No 575/2013 for several capital instruments.
+ **1.** By way of derogation from Articles 32d, 32e and 32f, where the application referred to in Article 32c is submitted by an institution for which the resolution authority has set the minimum requirement for own funds and eligible liabilities laid down in Article 45(1) of Directive 2014/59/EU at …
− **3.** In the case of a repurchase of Common Equity Tier 1 instruments, Additional Tier 1 instruments or Tier 2 instruments for market making purposes, competent authorities may give their permission in accordance with the criteria set out in Article 78 of Regulation (EU) No 575/2013 in advance to a…
+ **2.** A general prior permission as referred to in Article 78a(1), second subparagraph, of Regulation (EU) No 575/2013, granted following an application made in accordance with paragraph 1, shall not be subject to the restriction set out in Article 32b(5) of this Regulation.
− **4.** Competent authorities may also give in advance their permission to actions listed in Article 77 of Regulation (EU) No 575/2013 where the related own funds instruments are passed on to employees of the institution as part of their remuneration. Institutions shall inform competent authorities w…
+ **3.** By way of derogation from Article 32g, the institutions referred to in paragraph 1 shall submit the application referred to in Article 32c to the resolution authority at least three months before the date on which one of the actions listed in Article 77(2) of Regulation (EU) No 575/2013 will …
− **5.** A competent authority may give its permission in advance in accordance with the criteria set out in Article 78 of Regulation (EU) No 575/2013 to an action listed in Article 77 of that Regulation for a certain predetermined amount when the amount of own funds instruments to be called, redeemed…
+ **4.** Where the resolution authority does not oppose in writing the application referred to in Article 32c within the periods specified in paragraph 3, the permission shall be deemed granted.
− **6.** Paragraphs 1 to 5 shall apply at the consolidated, sub-consolidated and individual levels of application of prudential requirements, where applicable.
+ **5.** This article shall apply at individual, consolidated and sub-consolidated levels of application of requirements for own funds and eligible liabilities, as applicable.
− ### Article 30 — Content of the application to be submitted by the institution for the purposes of Article 77 of Regulation (EU) No 575/2013
+ ### Article 32i — Process of cooperation between the competent authority and the resolution authority when granting the permission referred to in Article 78a of Regulation (EU) No 575/2013
− **1.** The application referred to in Article 29 shall be accompanied by the following information:(a) a well-founded explanation of the rationale for performing one of the actions referred to in paragraph 1 of Article 29;(b) information on capital requirements and capital buffers, covering at least…
+ **1.** Where a complete application for a prior permission, including the general prior permission referred to in Article 78a(1), second subparagraph, of Regulation (EU) No 575/2013, is submitted by an institution, the resolution authority shall promptly transmit that application to the competent au…
− **2.** The competent authority shall waive the submission of some of the information listed in paragraph 2 where it is satisfied that this information is already available to it.
+ **2.** At the same time of the transmission of the information referred to in paragraph 1, the resolution authority shall make a request for consultation to the competent authority on the application received, which shall include the reciprocal exchange of any other relevant information for the asse…
− **3.** Paragraphs 1 and 2 shall apply at the individual, consolidated and sub-consolidated levels of application of prudential requirements, where applicable.
+ **3.** The competent authority and the resolution authority shall agree on an adequate time limit for providing a response to the consultation referred to in paragraph 2, which shall not exceed three months from the moment of receipt of the request for consultation and that shall be reduced to two m…
− ### Article 31 — Timing of the application to be submitted by the institution and processing of the application by the competent authority for the purposes of Article 77 of Regulation (EU) No 575/2013
+ **4.** Where the agreement of the competent authority is required in accordance with Article 78a(1), point (b), of Regulation (EU) No 575/2013, the resolution authority shall communicate to the competent authority, within two months from the request for consultation referred to in paragraph 2, or wi…
− **1.** The institution shall transmit a complete application and the information referred to in Articles 29 and 30 to the competent authority at least three months in advance of the date where one of the actions listed in Article 77 of Regulation (EU) No 575/2013 will be announced to the holders of …
+ **5.** Within three weeks or, where the consultation concerns the renewal of a general prior permission pursuant to Article 32f or a general prior permission pursuant to Article 32h, within two weeks, after receiving the communication referred to in paragraph 4, the competent authority shall transmi…
− **2.** Competent authorities may allow institutions on a case-by-case basis and under exceptional circumstances to transmit the application referred to in paragraph 1 within a time frame shorter than the three months period.
+ **6.** By way of derogation from paragraph 3, where the agreement of the competent authority is required in accordance with Article 78a(1), point (b), of Regulation (EU) No 575/2013, the competent authority shall provide a response to the consultation referred to in paragraph 2 at the same time as t…
− **3.** The competent authority shall process an application during either the period of time referred to in paragraph 1 or during the period of time referred to in paragraph 2. Competent authorities shall take into account new information, where any is available and where they consider this informat…
+ **7.** By way of derogation from paragraphs 3 to 6, where the maximum time period for processing the application referred to in paragraph 1 is shorter than four months in accordance with Article 32g, paragraphs 3 or 4, the periods of time referred to in paragraphs 3, 4 and 5 shall be agreed between …
− ### Article 32 — Applications for redemptions, reductions and repurchases by mutuals, cooperative societies, savings institutions or similar institutions for the purposes of Article 77 of Regulation (EU) No 575/2013
+ **8.** The resolution authority and the competent authority shall endeavour to reach the agreement referred to in paragraph 5 in order to ensure that the application referred to in paragraph 1 is processed in any event within the period of time referred to in Article 32g, paragraphs 1, 2, 3 or 4.
− **1.** With regard to the redemption of Common Equity Tier 1 instruments of mutuals, cooperative societies, savings institutions or similar institutions, the application referred to in Article 29(1), (2) and (6) and the information referred to in Article 30(1) shall be submitted to the competent aut…
+ **9.** The resolution authority shall communicate to the competent authority the decision taken on the permission without undue delay. The resolution authority shall also inform the competent authority in case of withdrawal of the general prior permission where an institution breaches any of the cri…
− **2.** Competent authorities may give their permission in advance to an action listed in Article 77 of Regulation (EU) No 575/2013 for a certain predetermined amount to be redeemed, net of the amount of the subscription of new paid in Common Equity Tier 1 instruments during a period up to one year. …
+ ## CHAPTER IV — GENERAL REQUIREMENTS / SECTION 3 — Temporary waiver from deduction from own funds and eligible liabilities
− ## *SECTION 3* / ***Temporary waiver from deduction from own funds***
+ ### Article 33 — Temporary waiver from deduction from own funds and eligible liabilities for the purposes of Article 79(1) of Regulation (EU) No 575/2013
− ### Article 33 — Temporary waiver from deduction from own funds for the purposes of Article 79(1) of Regulation (EU) No 575/2013
+ **2.** The waiver shall apply only in relation to new holdings of own funds instruments in a financial sector entity or eligible liabilities instruments in an institution subject to the financial assistance operation.
− **2.** The waiver shall apply only in relation to new holdings of instruments in the financial sector entity subject to the financial assistance operation.
+ **3.** For the purposes of providing a temporary waiver for deduction from own funds and eligible liabilities, as applicable, a competent authority may deem the holdings referred to in Article 79(1) of Regulation (EU) No 575/2013 to be held for the purposes of a financial assistance operation design…
− **3.** For the purposes of providing a temporary waiver for deduction from own funds, a competent authority may deem the temporary holdings referred to in Article 79(1) of Regulation (EU) No 575/2013 to be held for the purposes of a financial assistance operation designed to reorganise and save a fi…
+ ## CHAPTER V — MINORITY INTEREST AND ADDITIONAL TIER 1 AND TIER 2 INSTRUMENTS ISSUED BY SUBSIDIARIES
− ## CHAPTER V / **MINORITY INTEREST AND ADDITIONAL TIER 1 AND TIER 2 INSTRUMENTS ISSUED BY SUBSIDIARIES**
+ ## CHAPTER Va — OWN FUNDS BASED ON FIXED OVERHEADS
− ## CHAPTER Va / **OWN FUNDS BASED ON FIXED OVERHEADS**
+ ## CHAPTER VI — SPECIFICATION OF THE TRANSITIONAL PROVISIONS OF REGULATION (EU) No 575/2013 IN RELATION TO OWN FUNDS
− ## CHAPTER VI / **SPECIFICATION OF THE TRANSITIONAL PROVISIONS OF REGULATION (EU) No 575/2013 IN RELATION TO OWN FUNDS**

− This Regulation shall be binding in its entirety and directly applicable in all Member States.

− (1) Directive 2013/36/EU of the European Parliament and of the Council of 26 June 2013 on access to the activity of credit institutions and the prudential supervision of credit institutions and investment firms, amending Directive 2002/87/EC and repealing Directives 2006/48/EC and 2006/49/EC (OJ L 1…

− (2) Commission Implementing Regulation (EU) No 680/2014 of 16 April 2014 laying down implementing technical standards with regard to supervisory reporting of institutions according to Regulation (EU) No 575/2013 of the European Parliament and of the Council (OJ L 191, 28.6.2014, p. 1).

− (3) Regulation (EC) No 1606/2002 of the European Parliament and of the Council of 19 July 2002 on the application of international accounting standards, (OJ L 243, 11.9.2002, p. 1).

− (4) Directive 2002/87/EC of the European Parliament and of the Council of 16 December 2002 on the supplementary supervision of credit institutions, insurance undertakings and investment firms in a financial conglomerate (OJ L 35, 11.2.2003, p.1).

− (5) Council Directive 86/635/EEC of 8 December 1986 on the annual accounts and consolidated accounts of banks and other financial institutions (OJ L 372, 31.12.1986, p. 1).

− (6) Directive 2009/110/EC of the European Parliament and of the Council of 16 September 2009 on the taking up, pursuit and prudential supervision of the business of electronic money institutions (OJ L 267, 10.10.2009, p. 7).

− (7) Directive 2007/64/EC of the European Parliament and of the Council on payment services in the internal market (OJ L 319, 5.12.2007, p. 1).

− (8) Directive 2011/61/EU of the European Parliament and of the Council of 8 June 2011 on Alternative Investments Fund Managers (OJ L 174, 1.7.2011, p. 1).

− (9) Directive 2009/65/EC of the European Parliament and of the Council of 13 July 2009 on the coordination of laws, regulations and administrative provisions relating to undertakings for collective investment in transferable securities (UCITS) (OJ L 302, 17.11.2009, p. 32).

− (10) Directive 2004/39/EC of the European Parliament and of the Council of 21 April 2004 on markets in financial instruments amending Council Directives 85/611/EEC and 93/6/EEC and Directive 2000/12/EC of the European Parliament and of the Council and repealing Council Directive 93/22/EEC (OJ L 145,…
tierA, publisher-supplied consolidated wording-state dates
history beginspublisher
index built2026-08-07T19:46:23Z · corpus 8d5e859
stamp signaturevalid (ECDSA-P256)