What changed, Commission Implementing Regulation (EU) 2018/2066 of 19 December 2018 on the monitoring an…
2022-01-01 → 2022-08-28 · no interpretation, just the text delta
| on 2022-01-01 | eu-eurlex:32018r2066:2022-01-01 (2022-01-01 → 2022-08-27) · official source ↗ |
| on 2022-08-28 | eu-eurlex:32018r2066:2022-08-28 (2022-08-28 → 2023-12-31) · official source ↗ |
Open the structured article comparison → matched by provision anchor when continuity is sufficient; otherwise Lex refuses rather than inventing changes
2,790 line(s) in the old middle, 1,113 in the new; 1 unchanged leading and 1 trailing lines trimmed.
Change too large for a useful line-by-line page. Showing a small removed/added sample; use the structured article comparison above or the official source links.
− ## *SECTION 1* / ***Subject matter and definitions*** − ## *SECTION 2* / ***General principles*** − ## *SECTION 1* / ***General rules*** − ## *SECTION 2* / ***Technical feasibility and unreasonable costs*** − ## *SECTION 1* / ***General provisions*** − ## Subsection 1 / **General** − ## Subsection 2 / **Activity data** − ## Subsection 3 / **Calculation factors** − ## Subsection 4 / **Specific calculation factors** − ## Subsection 5 / **Treatment of biomass** − ## *SECTION 3* / ***Measurement-based methodology*** − ## *SECTION 4* / ***Special provisions*** − ## CHAPTER IV / **MONITORING OF EMISSIONS AND TONNE-KILOMETRE DATA FROM AVIATION** − ## CHAPTER V / **DATA MANAGEMENT AND CONTROL** − ## CHAPTER VI / **REPORTING REQUIREMENTS** − ## CHAPTER VII / **INFORMATION TECHNOLOGY REQUIREMENTS** − ## CHAPTER VIII / **FINAL PROVISIONS** − This Regulation shall be binding in its entirety and directly applicable in all Member States. − ### ANNEX I − **Minimum content of the monitoring plan (Article 12(1))** − 1. **MINIMUM CONTENT OF THE MONITORING PAN FOR INSTALLATIONS** − The monitoring plan for an installation shall contain at least the following information: − (1) general information on the installation: (a) a description of the installation and activities carried out by the installation to be monitored, containing a list of emissions sources and source streams to be monitored for each activity carried out within the installation and meeting the following… − (2) a detailed description of the calculation-based methodologies where applied, consisting of the following: (a) a detailed description of the calculation-based methodology applied, including a list of input data and calculation formulae used, a list of the tiers applied for activity data and all r… − (3) where a fall-back monitoring methodology is applied in accordance with Article 22, a detailed description of the monitoring methodology applied for all source streams or emission sources, for which no tier methodology is used, and a description of the written procedure used for the associated un… − (4) a detailed description of the measurement-based methodologies, where applied, including the following: (a) a description of the measurement method including descriptions of all written procedures relevant for the measurement and the following: (i) any calculation formulae used for data aggregati… − (5) in addition to elements listed in point 4, a detailed description of the monitoring methodology where N2O emissions are monitored, where appropriate in the form of description of the written procedures applied, including a description of the following: (a) the method and parameters used to deter… − (6) a detailed description of the monitoring methodology as far as perfluorocarbons from primary aluminium production are monitored, where appropriate in the form of a description of the written procedures applied, including the following: (a) where applicable, the dates of measurement for the deter… − (7) a detailed description of the monitoring methodology where transfer of inherent CO2 as part of a source stream in accordance with Article 48, transfer of CO2 in accordance with Article 49, or transfer of N2O in accordance with Article 50 are carried out, where appropriate in the form of a descri… − (8) where applicable, a description of the procedure used to assess if biomass source streams comply with Article 38(5); + ## CHAPTER I — GENERAL PROVISIONS / SECTION 1 — Subject matter and definitions + ## CHAPTER I — GENERAL PROVISIONS / SECTION 2 — General principles + ## CHAPTER II — MONITORING PLAN / SECTION 1 — General rules + ## CHAPTER II — MONITORING PLAN / SECTION 2 — Technical feasibility and unreasonable costs + ## CHAPTER III — MONITORING OF EMISSIONS FROM STATIONARY INSTALLATIONS / SECTION 1 — General provisions + ## CHAPTER III — MONITORING OF EMISSIONS FROM STATIONARY INSTALLATIONS / SECTION 2 — Calculation-based methodology / Subsection 1 — General + ## CHAPTER III — MONITORING OF EMISSIONS FROM STATIONARY INSTALLATIONS / SECTION 2 — Calculation-based methodology / Subsection 2 — Activity data + ## CHAPTER III — MONITORING OF EMISSIONS FROM STATIONARY INSTALLATIONS / SECTION 2 — Calculation-based methodology / Subsection 3 — Calculation factors + ## CHAPTER III — MONITORING OF EMISSIONS FROM STATIONARY INSTALLATIONS / SECTION 2 — Calculation-based methodology / Subsection 4 — Specific calculation factors + ## CHAPTER III — MONITORING OF EMISSIONS FROM STATIONARY INSTALLATIONS / SECTION 2 — Calculation-based methodology / Subsection 5 — Treatment of biomass + ## CHAPTER III — MONITORING OF EMISSIONS FROM STATIONARY INSTALLATIONS / SECTION 3 — Measurement-based methodology + ## CHAPTER III — MONITORING OF EMISSIONS FROM STATIONARY INSTALLATIONS / SECTION 4 — Special provisions + ## CHAPTER IV — MONITORING OF EMISSIONS AND TONNE-KILOMETRE DATA FROM AVIATION + ## CHAPTER V — DATA MANAGEMENT AND CONTROL + ## CHAPTER VI — REPORTING REQUIREMENTS + ## CHAPTER VII — INFORMATION TECHNOLOGY REQUIREMENTS + ## CHAPTER VIII — FINAL PROVISIONS
| tier | A, publisher-supplied validity dates |
| history begins | publisher |
| index built | 2026-08-07T19:46:23Z · corpus 8d5e859 |
| stamp signature | valid (ECDSA-P256) |