The text of one Luxembourg work as it stood on one date, or of one EU work in the wording that answers that date (its original wording or a later consolidated one), article by article, as the publisher wrote it, with what a quotation of it needs. The identifier and the date go to this server in the request and nowhere else, and this page keeps nothing.

Today in Luxembourg: 2026-10-31.

Lex shows the published text of the law. It does not tell you whether or how it applies to your situation and is not legal advice.

016 Article 16

Quoted from 32014R0651, eng, the consolidated wording of 2023-07-01 (the publisher's consolidation date).

Article 16 Regional urban development aid 1. Regional urban development aid shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled. 2. Urban development projects shall fulfil the following criteria: (a) they are implemented via urban development funds in assisted areas; (b) they are co-financed by the European Structural and Investment Funds; (c) they support the implementation of an ‘integrated sustainable urban development strategy’; 3. The total investment in an urban development project under any urban development aid measure shall not exceed EUR 22 million. 4. The eligible costs shall be the overall costs of the urban development project to the extent that they comply with Articles 37 and 65 of Regulation (EU) No 1303/2013, or Articles 67 and 68 of Regulation (EU) 2021/1060, whichever is applicable. 5. Aid granted by an urban development fund to the eligible urban development projects may take the form of equity, quasi-equity, loans, guarantees, or a mix thereof. 6. The urban development aid shall leverage additional investment from independent private investors as defined in Article 2 point (72) at the level of the urban development funds or the urban development projects, so as to achieve an aggregate amount reaching a minimum of 20 % of the total financing provided to an urban development project. 7. Private and public investors may provide cash or an in-kind contribution or a combination of those for the implementation of an urban development project. An in-kind contribution shall be taken into account at its market value, as certified by an independent qualified expert or duly authorised official body. 8. The urban development measures shall fulfil the following conditions: (a) urban development fund managers shall be selected through an open, transparent and non-discriminatory call in accordance with the applicable Union and national laws. In particular, there shall be no discrimination between urban development fund managers on the basis of their place of establishment or incorporation in any Member State. Urban development fund managers may be required to fulfil predefined criteria objectively justified by the nature of the investments; (b) the independent private investors shall be selected through an open, transparent and non-discriminatory call in accordance with applicable Union and national laws aimed at establishing the appropriate risk-reward sharing arrangements whereby, for investments other than guarantees, asymmetric profit-sharing shall be given preference over downside protection. If the private investors are not selected by such a call, the fair rate of return to the private investors shall be established by an independent expert selected via an open, transparent and non-discriminatory call; (c) in the case of asymmetric loss-sharing between public and private investors, the first loss assumed by the public investor shall be capped at 25 % of the total investment; (d) in the case of guarantees to private investors in urban development projects, the guarantee rate shall be limited to 80 % and total losses assumed by a Member State shall be capped at 25 % of the underlying guaranteed portfolio; (e) the investors shall be allowed to be represented in the governance bodies of the urban development fund, such as the supervisory board or the advisory committee; (f) the urban development fund shall be established according to the applicable laws. The Member State shall provide for a due diligence process in order to ensure a commercially sound investment strategy for the purpose of implementing the urban development aid measure. 9. Urban development funds shall be managed on a commercial basis and shall ensure profit-driven financing decisions. This is considered to be the case when the managers of the urban development fund fulfill the following conditions: (a) the managers of urban development funds shall be obliged by law or contract to act with the diligence of a professional manager in good faith and avoiding conflicts of interest; best practices and regulatory supervision shall apply; (b) the remuneration of the managers of urban development funds shall conform to market practices. This requirement is considered to be met where a manager is selected through an open, transparent and non-discriminatory call, based on objective criteria linked to experience, expertise and operational and financial capacity; (c) the managers of urban development funds shall receive a remuneration linked to performance, or shall share part of the investment risks by co-investing own resources so as to ensure that their interests are permanently aligned with the interests of the public investors; (d) the managers of urban development funds shall set out an investment strategy, criteria and the proposed timing of investments in urban development projects, establishing the ex ante financial viability and their expected impact on urban development; (e) a clear and realistic exit strategy shall exist for each equity and quasi-equity investment. 10. Where an urban development fund provides loans or guarantees to urban development projects, the following conditions shall be fulfilled: (a) in the case of loans, the nominal amount of the loan is taken into account in calculating the maximum investment amount for the purposes of paragraph 3 of this Article; (b) in the case of guarantees, the nominal amount of the underlying loan is taken into account in calculating the maximum investment amount for the purposes of paragraph 3 of this Article. 11. The Member State may assign the implementation of the urban development aid measure to an entrusted entity.

Text digest 97cf941b9384dd8414081126c1daf81dd17ceb51b20fd6a541aa8e45e7b1b6ab, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/016

Cite this article

Usual citation
Article 16 of Regulation (EU) No 651/2014
With its permalink
Article 16 of Regulation (EU) No 651/2014 (https://law.soufien.lu/eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/016)
Evidence form
Article 16 of Regulation (EU) No 651/2014
Permalink: https://law.soufien.lu/eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/016

CELEX: 02014R0651-20230701

Wording: the consolidated wording of 2023-07-01

Published in: the Official Journal reference is not held by this index.

Text digest (SHA-256): 97cf941b9384dd8414081126c1daf81dd17ceb51b20fd6a541aa8e45e7b1b6ab

Consulted on Lex on 2026-10-31 (date in Luxembourg).

Only the Official Journal of the European Union published in electronic form is authentic and produces legal effects (Regulation (EU) No 216/2013, Article 1(2)); this text is a reproduction read from the Publications Office's Formex package, not the authentic edition.

The whole act in this wording

© European Union, https://eur-lex.europa.eu

Only the Official Journal of the European Union published in electronic form is authentic and produces legal effects (Regulation (EU) No 216/2013, Article 1(2)); this text is a reproduction read from the Publications Office's Formex package, not the authentic edition.

How to read this

The publisher's dates this site holds for this act

  • Application: 2014-07-01 (the publisher's qualifier, word for word: V ART 59)
  • End of validity, in whole or in part: 2026-12-31 (the publisher's qualifier, word for word: P/PAR 32023R1315)
  • Deadline: 2014-07-01 (the publisher's qualifier, word for word: V ART 2.27)
  • Deadline: 2019-12-31 (the publisher's qualifier, word for word: V ART 1.4(c) ET 14.16)
  • Deadline: 2020-01-01 (the publisher's qualifier, word for word: V ART 1.4(c) ET 14.16)
  • Deadline: 2021-06-30 (the publisher's qualifier, word for word: V ART 1.4(c) ET 14.16)
  • Deadline: 2021-12-31 (the publisher's qualifier, word for word: V ART 2.27)
  • Deadline: 2022-01-01 (the publisher's qualifier, word for word: V ART 2.27)
  • Deadline: 2023-12-31 (the publisher's qualifier, word for word: V ART 11.2)
  • Deadline: 2027-12-31 (the publisher's qualifier, word for word: V ART 2.27)

Not held for this act: entry into force. The publisher's dated statements this site holds for it give no such date, which says nothing of whether the act has one.

None of the dates above is used to choose a wording: each wording below carries its own date.

32014R0651, eng, the consolidated wording of 2023-07-01 (the publisher's consolidation date)

This is the latest wording held: it answers every later date, and an amendment the publisher has not yet consolidated is not in it.

11 other publisher works carry this date: 1 with this same text held here, 10 with no text held here.

/eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng

86 articles quoted, 0 held without text.

Contents
  1. Page 1: Article 1
  2. Page 2: Article 2 to Article 3
  3. Page 3: Article 4 to Article 21a
  4. Page 4: Article 22 to Article 40
  5. Page 5: Article 41 to Article 56
  6. Page 6: Article 56a to Article 59

Page 3 of 6: Article 4 to Article 21a.

  1. 004 Article 4

    Article 4 Notification thresholds 1. This Regulation shall not apply to aid which exceeds the following thresholds: (a) for regional investment aid: for an investment with eligible costs of EUR 110 million or more, the aid amounts per undertaking per investment projects as set out below: in cases of maximum regional aid intensity of 10 %: EUR 8.25 million; in cases of maximum regional aid intensity of 15 %: EUR 12.38 million; in cases of maximum regional aid intensity of 20 %: EUR 16.5 million; in cases of maximum regional aid intensity of 25 %: EUR 20.63 million; in cases of maximum regional aid intensity of 30 %: EUR 24.75 million; in cases of maximum regional aid intensity of 35 %: EUR 28.88 million; in cases of maximum regional aid intensity of 40 %: EUR 33 million; in cases of maximum regional aid intensity of 50 %: EUR 41.25 million; in cases of maximum regional aid intensity of 60 %: EUR 49.5 million; in cases of maximum regional aid intensity of 70 %: EUR 57.75 million; (b) for regional urban development aid, EUR 22 million as laid down in Article 16(3); (c) for investment aid to SMEs: EUR 8.25 million per undertaking per investment project; (d) for aid for consultancy in favour of SMEs: EUR 2.2 million per undertaking, per project; (e) for aid to SMEs for participation in fairs: EUR 2.2 million per undertaking, per year; (ea) for aid to microenterprises in the form of public interventions concerning the supply of electricity, gas or heat referred to in Article 19c: EUR per beneficiary per calendar year. For microenterprises active in the primary production of agricultural products, this limit shall be EUR per beneficiary per calendar year, and for microenterprises active in the fishery and aquaculture sectors, EUR per beneficiary per calendar year; (eb) for aid to SMEs in the form of temporary public interventions concerning the supply of electricity, gas or heat produced from natural gas or electricity to mitigate the impact of price increases following Russia’s war of aggression against Ukraine referred to in Article 19d: EUR 2 million per beneficiary per calendar year. For SMEs active in the primary production of agricultural products, this limit shall be EUR per beneficiary per calendar year, and for SMEs active in the fishery and aquaculture sectors, EUR per beneficiary per calendar year. Aid granted to undertakings active in the processing and marketing of agricultural products shall be conditional on not being partly or entirely passed on to primary producers; (f) for aid for undertakings participating in European Territorial Cooperation projects: for aid under Article 20, EUR 2.2 million per undertaking, per project; for aid under Article 20a, the amounts laid down in Article 20a(2) per undertaking, per project; (g) for risk finance aid: EUR 16.5 million per eligible undertaking as laid down in Article 21(8) and Article 21a(2); (h) for aid for start-ups: the amounts laid down per undertaking in Article 22(3), (4), (5) and (7); (i) for aid for research and development: (i) if the project is predominantly fundamental research: EUR 55 million per undertaking, per project; that is the case where more than half of the eligible costs of the project are incurred through activities which fall within the category of fundamental research; (ii) if the project is predominantly industrial research: EUR 35 million per undertaking, per project; that is the case where more than half of the eligible costs of the project are incurred through activities which fall within the category of industrial research or within the categories of industrial research and fundamental research taken together; (iii) if the project is predominantly experimental development: EUR 25 million per undertaking, per project; that is the case where more than half of the eligible costs of the project are incurred through activities which fall within the category of experimental development; (iv) if the project is a Eureka project, is implemented by a Joint Undertaking established on the basis of Article 185 or of Article 187 of the Treaty, or complies with the conditions set out in Article 25(6), point (d), the amounts referred to in points (i) to (iii) are doubled; (v) if the aid for research and development projects is granted in the form of repayable advances which, in the absence of an accepted methodology to calculate their gross grant equivalent, are expressed as a percentage of the eligible costs and the measure provides that in case of a successful outcome of the project, as defined on the basis of a reasonable and prudent hypothesis, the advances will be repaid with an interest rate at least equal to the discount rate applicable at the time of grant, the amounts referred to in points (i) to (iv) are increased by 50 %; (vi) aid for feasibility studies in preparation for research activities: EUR 8.25 million per study; (vii) for aid for SMEs for research and development projects awarded a Seal of Excellence quality label and implemented under Article 25a, the amount referred to in Article 25a; (viii) for aid Marie Skłodowska-Curie actions and ERC Proof of Concept actions implemented under Article 25b, the amounts referred to in Article 25b; (ix) for aid involved in co-funded research and development projects implemented under Article 25c, the amounts referred to in Article 25c; (x) for aid for Teaming actions, the amounts referred to in Article 25d; (xi) for aid involved in the co-funding of projects supported by the European Defence Fund or the European Defence Industrial Development Programme under Article 25e: EUR 80 million per undertaking, per project; (j) for investment aid for research infrastructures: EUR 35 million per infrastructure; (ja) for investment aid for testing and experimentation infrastructures: EUR 25 million per infrastructure; (k) for aid for innovation clusters: EUR 10 million per cluster; (l) Innovation aid for SMEs: EUR 10 million per undertaking, per project; (m) for aid for process and organisational innovation: EUR 12.5 million per undertaking, per project; (n) for training aid: EUR 3 million per training project; (o) for aid for the recruitment of disadvantaged workers: EUR 5.5 million per undertaking, per year; (p) for aid for the employment of workers with disabilities in the form of wage subsidies: EUR 11 million per undertaking, per year; (q) for aid for compensating the additional costs of employing workers with disabilities: EUR 11 million per undertaking, per year; (r) for aid for compensating the costs of assistance provided to disadvantaged workers: EUR 5.5 million per undertaking, per year; (s) for investment aid for environmental protection, unless otherwise specified: EUR 30 million per undertaking per investment project; (sa) for aid for dedicated infrastructure and storage referred to in Article 36(4): EUR 25 million per project; (sb) for investment aid for recharging or refuelling infrastructure referred to in Article 36a(1) and (2): EUR 30 million per undertaking per project and, in the case of schemes, an average annual budget of EUR 300 million; (sc) for investment aid for the combined improvements of the energy and environmental performance of buildings referred to in Articles 38a(7) and 39(2a): EUR 30 million per undertaking per project; (sd) for aid for the facilitation of energy performance contracting referred to in Article 38b: EUR 30 million of total nominal outstanding financing per beneficiary; (se) for investment aid for energy efficiency projects in buildings in the form of financial instruments: the amounts set out in Article 39(5); (sf) for aid in form of reduction of environmental taxes or levies referred to in Article 44a: EUR 50 million per scheme per year; (t) for investment aid for energy efficiency projects, the amounts set out in Article 39(5); (u) for investment aid for remediation of contaminated sites: EUR 20 million per undertaking per investment project; (v) for operating aid for the promotion of electricity from renewable sources, as referred to in Article 42, and operating aid for the promotion of energy from renewable sources and renewable hydrogen in small projects and renewable energy communities, as referred to in Article 43: EUR 30 million per undertaking per project; the sum of the budgets of all the schemes falling under Article 42 and the sum of the budgets of all the schemes falling under Article 43 should respectively not exceed EUR 300 million per year; (w) for aid for district heating and/or cooling systems, as referred to in Article 46: EUR 50 million per undertaking per project; (x) for aid for energy infrastructure, as referred to in Article 48: EUR 70 million per undertaking per project; (y) for aid for the deployment of fixed broadband networks awarded in the form of a grant: EUR 100 million total costs per project; for aid for fixed broadband networks awarded in the form of a financial instrument the nominal amount of total financing provided to any final beneficiary per project must not exceed EUR 150 million; (ya) for aid for the deployment of 4G or 5G mobile networks awarded in the form of a grant: EUR 100 million total costs per project; for aid for 4G or 5G mobile networks awarded in the form of a financial instrument the nominal amount of total financing provided to any final beneficiary per project must not exceed EUR 150 million; (yb) for aid for certain projects of common interest in the area of trans-European digital connectivity infrastructures financed under Regulation (EU) 2021/1153 or awarded a Seal of Excellence quality label under that Regulation awarded in the form of a grant: EUR 100 million total costs per project; for aid for certain projects of common interest in the area of trans-European digital connectivity infrastructures awarded in the form of a financial instrument the nominal amount of total financing provided to any final beneficiary per project must not exceed EUR 150 million; (yc) for aid in the form of connectivity vouchers schemes: the total State aid budget over 24 months for all connectivity voucher schemes in a Member State must not exceed EUR 50 million (total amount including national and regional or local voucher schemes); (yd) for aid for the deployment of backhaul networks awarded in the form of a grant: EUR 100 million total costs per project; for aid for the deployment of backhaul networks awarded in the form of a financial instrument the nominal amount of total financing provided to any final beneficiary per project must not exceed EUR 150 million; (z) for investment aid for culture and heritage conservation: EUR 165 million per project; operating aid for culture and heritage conservation: EUR 82.5 million per undertaking per year; (aa) for aid schemes for audiovisual works: EUR 55 million per scheme per year; (bb) for investment aid for sport and multifunctional recreational infrastructures: EUR 33 million or the total costs exceeding EUR 110 million per project; operating aid for sport infrastructure: EUR 2.2 million per infrastructure per year; (cc) for investment aid for local infrastructures: EUR 11 million or the total costs exceeding EUR 22 million for the same infrastructure; (dd) for aid for regional airports: the aid intensities and aid amounts laid down in Article 56a; (ee) for aid for maritime ports: eligible costs of EUR 143 million per project (or EUR 165 million per project in a maritime port included in the work plan of a Core Network Corridor as referred to in Article 47 of Regulation (EU) No 1315/2013 of the European Parliament and of the Council); as regards dredging a project is defined as all dredging carried out within 1 calendar year; (ff) for aid for inland ports: eligible costs of EUR 44 million per project (or EUR 55 million per project in an inland port included in the work plan of a Core Network Corridor as referred to in Article 47 of Regulation (EU) No 1315/2013); as regards dredging a project is defined as all dredging carried out within 1 calendar year; (gg) for aid involved in financial products supported by the InvestEU Fund: the amounts laid down in Section 16 of Chapter III; and (hh) for aid to SMEs for costs incurred by participating in community-led local development (‘CLLD’) projects: for aid under Article 19a, EUR 2 million per undertaking, per project; for aid under Article 19b, the amounts laid down in Article 19b(2) per project. 2. The thresholds set out or referred to in paragraph 1 shall not be circumvented by artificially splitting up the aid schemes or aid projects.

    Text digest 70b7efc080878fe38eda19b968285d9bcbe2bfd821e2c2e23a29e350462049e6, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/004

  2. 005 Article 5

    Article 5 Transparency of aid 1. This Regulation shall apply only to aid in respect of which it is possible to calculate precisely the gross grant equivalent of the aid ex ante without any need to undertake a risk assessment (‘transparent aid’). 2. The following categories of aid shall be considered to be transparent: (a) aid comprised in grants and interest rate subsidies; (b) aid comprised in loans, where the gross grant equivalent has been calculated on the basis of the reference rate prevailing at the time of the grant; (c) aid comprised in guarantees: (i) where the gross grant equivalent has been calculated on the basis of safe-harbour premiums laid down in a Commission notice; or (ii) where before the implementation of the measure, the methodology to calculate the gross grant equivalent of the guarantee has been accepted on the basis of the Commission Notice on the application of Articles 87 and 88 of the EC Treaty to State aid in the form of guarantees, or any successor notice, following notification of that methodology to the Commission under any regulation adopted by the Commission in the State aid area applicable at the time, and the approved methodology explicitly addresses the type of guarantee and the type of underlying transaction at stake in the context of the application of this Regulation; (d) aid in the form of tax advantages, where the measure provides for a cap ensuring that the applicable threshold is not exceeded; (e) aid for regional urban development if the conditions laid down in Article 16 are fulfilled; (ea) aid to undertakings for their participation in European Territorial Cooperation projects under Article 20a, where it provides for a cap ensuring that the applicable threshold laid down in Article 20a is not exceeded; (f) aid comprised in risk finance measures if the conditions laid down in Articles 21 and 21a are fulfilled; (g) aid for start-ups if the conditions laid down in Article 22 are fulfilled; (ga) aid for SMEs in the form of reduced access fees or free access to innovation advisory services and innovation support services, as defined in Article 2, points (94) and (95) respectively, offered for example by research and knowledge dissemination organisations, research infrastructures, testing and experimentation infrastructures or innovation clusters based on an aid scheme provided that the following conditions are met: (i) the advantage consisting in reduced fees or free access acquired is quantifiable and demonstrable; (ii) the full or partial price discounts for services and the rules in accordance with which SMEs may apply for and be selected and granted discounts are made publicly available (through web sites or other suitable means) before the service provider starts offering the discounts; (iii) the service provider shall keep records of the amounts of aid granted to each SME in the form of price discounts to make sure that the ceilings set out in Article 28(3) and (4) are complied with. Such records shall be kept for 10 years from the date on which the last aid was granted by the service provider; (h) aid for energy efficiency projects if the conditions laid down in Article 39 are fulfilled; (i) aid in the form of premiums in addition to the market price if the conditions laid down in Article 42 are fulfilled; (j) aid in the form of repayable advances, if the total nominal amount of the repayable advance does not exceed the thresholds applicable under this Regulation or if, before implementation of the measure, the methodology to calculate the gross grant equivalent of the repayable advance has been accepted following its notification to the Commission; (k) aid in the form of the sale or the lease of tangible assets below market rates where the value is established either by an independent expert evaluation prior to the transaction or by reference to a publicly available, regularly updated and generally accepted benchmark; (l) aid involved in financial products supported by the InvestEU Fund, if the conditions laid down in Chapter III, Section 16, are fulfilled; (m) aid to microenterprises in the form of public interventions concerning the supply of electricity, gas or heat, if the conditions set out in Articles 19c are fulfilled; (n) aid to SMEs in the form of temporary public interventions concerning the supply of electricity, gas or heat produced from natural gas or electricity to mitigate the impact of price increases following Russia’s war of aggression against Ukraine, if the conditions set out in Article 19d are fulfilled.

    Text digest 2abdb939b44b2082d752f07791f0de59e7052d94813f2f92860eac9371c69c1a, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/005

  3. 006 Article 6

    Article 6 Incentive effect 1. This Regulation shall apply only to aid which has an incentive effect. 2. Aid shall be considered to have an incentive effect if the beneficiary has submitted a written application for the aid to the Member State concerned before work on the project or activity starts. The application for the aid shall contain at least the following information: (a) undertaking's name and size; (b) description of the project, including its start and end dates; (c) location of the project; (d) list of project costs; (e) type of aid (grant, loan, guarantee, repayable advance, equity injection or other) and amount of public funding needed for the project; 3. Ad hoc aid granted to large enterprises shall be considered to have an incentive effect if, in addition to ensuring that the condition laid down in paragraph 2 is fulfilled, the Member State has verified, before granting the aid concerned, that documentation prepared by the beneficiary establishes that the aid will result in one or more of the following: (a) in the case of regional investment aid: that a project is carried out, which would not have been carried out in the area concerned or would not have been sufficiently profitable for the beneficiary in the area concerned in the absence of the aid. (b) in all other cases, that there is: a material increase in the scope of the project/activity due to the aid, or a material increase in the total amount spent by the beneficiary on the project/activity due to the aid, or a material increase in the speed of completion of the project/activity concerned; 4. By way of derogation from paragraphs 2 and 3, measures in the form of tax advantages shall be deemed to have an incentive effect if the following conditions are fulfilled: (a) the measure establishes a right to aid in accordance with objective criteria and without further exercise of discretion by the Member State; and (b) the measure has been adopted and is in force before work on the aided project or activity has started, except in the case of fiscal successor schemes, where the activity was already covered by the previous schemes in the form of tax advantages. 5. By way of derogation from paragraphs 2, 3 and 4, the following categories of aid are not required to have or shall be deemed to have an incentive effect: (a) regional operating aid and regional urban development aid, where the relevant conditions laid down in Articles 15 and 16 are fulfilled; (b) aid for access to finance for SMEs, if the relevant conditions laid down in Articles 21, 21a and 22 are fulfilled; (c) aid for the recruitment of disadvantaged workers in the form of wage subsidies and aid for the employment of workers with disabilities in the form of wage subsidies, if the relevant conditions laid down in Articles 32 and 33 respectively are fulfilled; (d) aid compensating for the additional costs of employing workers with disabilities and aid for compensating the costs of assistance provided to disadvantaged workers, where the relevant conditions laid down in Articles 34 and 35 are fulfilled; (e) aid in the form of reductions in environmental taxes under Directive 2003/96/EC, if the conditions laid down in Article 44 of this Regulation are fulfilled; (f) aid to make good the damage caused by certain natural disasters, if the conditions laid down in Article 50 are fulfilled; (g) social aid for transport for residents of remote regions, if the conditions laid down in Article 51 are fulfilled; (h) aid for culture and heritage conservation, if the conditions laid down in Article 53 are fulfilled; (i) aid for undertakings participating in European Territorial Cooperation projects, if the relevant conditions in Article 20 or Article 20a are fulfilled; (j) aid for research and development projects awarded a Seal of Excellence quality label, Marie Skłodowska-Curie actions and ERC Proof of Concept actions awarded a Seal of Excellence quality label, aid involved in co-funded projects and in co-funded Teaming actions, if the relevant conditions laid down in Article 25a, Article 25b, Article 25c or Article 25d are fulfilled; (k) aid involved in financial products supported by the InvestEU Fund, if the conditions laid down in Section 16 of Chapter III are fulfilled; (l) aid for SMEs participating in or benefitting from community-led local development (‘CLLD’) projects, if the relevant conditions in Article 19a or 19b are fulfilled; (m) aid for the remediation of environmental damage and the rehabilitation of natural habitats and ecosystems where the remediation or rehabilitation costs exceed the increase in value of the land or property and the conditions laid down in Article 45 are fulfilled; (n) aid for the protection of biodiversity and the implementation of nature-based solutions for climate change adaptation and mitigation where the conditions laid down in Article 45 are fulfilled; (o) aid for the promotion of energy from renewable energy sources under Article 41, 42 and 43 when the aid is granted automatically in accordance with objective and non-discriminatory criteria and without further exercise of discretion by the Member State and the measure has been adopted and is in force before work on the aided project or activity has started; (p) aid to microenterprises in the form of public interventions concerning the supply of electricity, gas or heat, subject to the conditions set out in Article 19c; (q) aid to SMEs in the form of temporary public interventions concerning the supply of electricity, gas or heat produced from natural gas or electricity to mitigate the impact of price increases following Russia’s war of aggression against Ukraine, subject to the conditions set out in Article 19d.

    Text digest 196016d499e91b8c4b09413f6d50777040f8e632bc1fca166d1af76c14d90b41, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/006

  4. 007 Article 7

    Article 7 Aid intensity and eligible costs 1. For the purposes of calculating aid intensity and eligible costs, all figures used shall be taken before any deduction of tax or other charge. Value added tax charged on eligible costs or expenses that is refundable under the applicable national tax law shall, however, not be taken into account for calculating aid intensity and eligible costs. The eligible costs shall be supported by documentary evidence which shall be clear, specific and contemporary. The amounts of eligible costs may be calculated in accordance with simplified cost options, provided that an operation is at least partly financed through a Union fund that allows the use of simplified cost options and that the category of costs is eligible according to the relevant exemption provision. In such case, the simplified cost options provided in the relevant rules governing the Union fund are applicable. In addition, for projects implemented in line with Recovery and Resilience Plans as approved by the Council under Regulation (EU) 2021/241 of the European Parliament and of the Council, the amounts of eligible costs may also be calculated in accordance with simplified cost options, provided that the simplified cost options set out in Regulation (EU) No 1303/2013 or Regulation (EU) 2021/1060 are used. In addition, for aid under Articles 25a and 25b, indirect costs can be calculated in accordance with the rules laid down in the respective paragraph 3 of Articles 25a and 25b. 2. Where aid is granted in a form other than a grant, the aid amount shall be the gross grant equivalent of the aid. 3. Aid payable in the future, including aid payable in several instalments, shall be discounted to its value at the moment it is granted. The eligible costs shall be discounted to their value at the moment the aid is granted. The interest rate to be used for discounting purposes shall be the discount rate applicable at the moment the aid is granted. 4. Where aid is granted by means of tax advantages, discounting of aid tranches shall take place on the basis of the discount rates applicable at the various times the tax advantage takes effect. 5. Where aid is granted in the form of repayable advances which, in the absence of an accepted methodology to calculate their gross grant equivalent, are expressed as a percentage of the eligible costs and the measure provides that in case of a successful outcome of the project, as defined on the basis of a reasonable and prudent hypothesis, the advances will be repaid with an interest rate at least equal to the discount rate applicable at the moment the aid is granted, the maximum aid intensities laid down in Chapter III may be increased by 10 percentage points. 6. Where regional aid is granted in the form of repayable advances, the maximum aid intensities established in a regional aid map in force at the moment the aid is granted may not be increased.

    Text digest c1e262efb58bf169f13a2eac9c0440128341dd82dc78548febe2dc7d4afb65be, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/007

  5. 008 Article 8

    Article 8 Cumulation 1. In determining whether the notification thresholds in Article 4 and the maximum aid intensities in Chapter III are respected, the total amount of State aid for the aided activity or project or undertaking shall be taken into account. 2. Where Union funding centrally managed by the institutions, agencies, joint undertakings or other bodies of the Union that is not directly or indirectly under the control of the Member State is combined with State aid, only the latter shall be considered for determining whether notification thresholds and maximum aid intensities or maximum aid amounts are respected, provided that the total amount of public funding granted in relation to the same eligible costs does not exceed the most favourable funding rate laid down in the applicable rules of Union law. By way of derogation, the total public funding for projects supported by the European Defence Fund may reach up to the total eligible costs of the project, irrespective of the maximum funding rate applicable under this fund, provided that the notification thresholds and maximum aid intensities or maximum aid amounts under this Regulation are respected. 3. Aid with identifiable eligible costs exempted by this Regulation may be cumulated with: (a) any other State aid, as long as those measures concern different identifiable eligible costs, (b) any other State aid, in relation to the same eligible costs, partly or fully overlapping, only if such cumulation does not result in exceeding the highest aid intensity or aid amount applicable to this aid under this Regulation. Financing provided to the final beneficiaries with support from the InvestEU Fund covered by Section 16 of Chapter III and the cost covered by this financing shall not be considered for determining compliance with the cumulation provisions laid down in the first sentence of this point. Instead, the amount relevant for determining compliance with the cumulation provisions of the first sentence of this point shall be calculated as follows. First, the nominal amount of the financing supported by the InvestEU Fund shall be deducted from the total eligible project costs, obtaining the total remaining eligible costs; second, the maximum aid shall be calculated by applying the relevant highest aid intensity or aid amount only to the total remaining eligible costs. In cases of Articles for which the notification threshold is expressed as a maximum aid amount, the nominal amount of financing provided to the final beneficiaries with the support from the InvestEU Fund shall also not be considered for determining whether the notification thresholds in Article 4 are respected. Alternatively, for senior loans or guarantees on senior loans supported by the InvestEU Fund under Section 16 of Chapter III, the gross grant equivalent of the aid entailed in such loans or guarantees provided to the final beneficiaries may be calculated in accordance with Article 5(2), point (b) or (c), as appropriate. This gross grant equivalent of the aid can be used for ensuring, in line with the first sentence of this point, that cumulation with any other aid for the same identifiable eligible costs does not result in exceeding the highest aid intensity or aid amount applicable to the aid under this Regulation or the relevant notification threshold under this Regulation. 4. Aid without identifiable eligible costs exempted under Articles 19b, 20a, 21, 21a, 22 or 23, Article 56e(5), point (a)(ii), (iii) or (iv), Article 56e(10) and Article 56f may be cumulated with any other State aid with identifiable eligible costs. Aid without identifiable eligible costs may be cumulated with any other State aid without identifiable eligible costs, up to the highest relevant total financing threshold fixed in the specific circumstances of each case by this or another block exemption regulation or decision adopted by the Commission. Aid without identifiable eligible costs exempted under this Regulation may be cumulated with other aid without identifiable eligible costs granted to remedy a serious disturbance in the economy of a Member State under Article 107(3), point (b), of the Treaty approved in a decision adopted by the Commission. Aid without identifiable eligible costs exempted under Article 56e(5), point (a)(ii), (iii) or (iv), Article 56e(10) and Article 56f may be cumulated with other aid without identifiable eligible costs exempted under those Articles. 5. State aid exempted under this Regulation shall not be cumulated with any de minimis aid in respect of the same eligible costs if such cumulation would result in an aid intensity exceeding those laid down in Chapter III of this Regulation. 6. By way of derogation from paragraph 3(b), aid in favour of workers with disabilities, as provided for in Articles 33 and 34 may be cumulated with other aid exempted under this Regulation in relation to the same eligible costs above the highest applicable threshold under this Regulation, provided that such cumulation does not result in an aid intensity exceeding 100 % of the relevant costs over any period for which the workers concerned are employed. 7. By way of derogation from paragraphs 1 to 6, in determining whether the ceilings for regional operating aid in outermost regions, as set out in Article 15(4), are respected, only regional operating aid in outermost regions implemented under this Regulation shall be taken into account.

    Text digest 1dbdc29b236992d791700bf4a0dab8651a45f27ef6a26bab7dc583d6cd64dfc6, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/008

  6. 009 Article 9

    Article 9 Publication and information 1. The Member State concerned shall ensure the publication, in the Commission’s transparency award module or on a comprehensive State aid website, at national or regional level, of: (a) the summary information referred to in Article 11 in the standardised format laid down in Annex II or a link providing access to it; (b) the full text of each aid measure, as referred to in Article 11 or a link providing access to the full text; (c) the information referred to in Annex III on each individual aid award exceeding EUR , or for aid involved in financial products supported by the InvestEU fund under Section 16 on each individual aid award exceeding EUR , or for beneficiaries active in primary agricultural production or in the fishery and aquaculture sector, other than those to which Section 2a applies, on each individual aid award exceeding EUR . As regards aid granted to European Territorial Cooperation projects as referred to in Article 20, the information referred to in this paragraph shall be placed on the website of the Member State in which the managing authority concerned, as defined in Article 21 of Regulation (EU) No 1299/2013 of the European Parliament and of the Council, or Article 45 of Regulation (EU) 2021/1059 of the European Parliament and of the Council, whichever is applicable, is located. Alternatively, the participating Member States may decide that each of them shall provide the information relating to the aid measures within their territory on the respective websites. The publication obligations laid down in the first subparagraph shall not apply to aid granted to European Territorial Cooperation projects referred to in Article 20a, as well as community-led local development (‘CLLD’) projects under Article 19b. 2. For schemes in the form of tax advantages, and for schemes covered by Articles 16, 21a and 22 the conditions set out in paragraph 1, first subparagraph, point (c), of this Article shall be considered fulfilled if Member States publish the required information on individual aid amounts in the following ranges (in EUR million): 0.01-0.1 (only for fishery and aquaculture as well as primary agricultural production); 0.1-0.5; 0.5-1; 1-2; 2-5; 5-10; 10-30; and 30 and more. 3. For schemes under Article 51 of this Regulation, the publication obligations laid down in this article shall not apply to final consumers. 3a. If a financial product has been implemented by a Member State under the InvestEU Member State compartment or by a national promotional bank acting as an implementing partner or acting as a financial intermediary under InvestEU, the Member State remains under the obligation to ensure the publication of information as laid down in paragraph 1, first subparagraph, point (c). However, this obligation is deemed to be fulfilled if the implementing partner provides to the Commission the information as laid down in paragraph 1, first subparagraph, point (c), no later than 30 June of the year following the financial year in which the aid was granted and if the guarantee agreement signed between the Commission and the implementing partner stipulates the requirement to provide to the Commission the information as laid down in paragraph 1, first subparagraph, point (c). 4. The information referred to in paragraph 1, point (c), shall be organised and accessible in a standardised manner, as described in Annex III, and shall allow for effective search and download functions. It shall be published within 6 months from the date the aid was granted, or for aid in the form of tax advantages, within 1 year from the date the tax declaration is due, and shall be available for at least 10 years from the date on which the aid was granted. For aid in the form of tax advantages, if there is no formal requirement for an annual declaration, 31 December of the year for which the aid was granted will be considered as the granting date for the purposes of this paragraph. 5. The Commission shall publish on its website: (a) the links to the State aid websites referred to in paragraph 1 of this Article; (b) the summary information referred to in Article 11. 6. Member States shall comply with the provisions of this Article at the latest within two years after the entry into force of this Regulation.

    Text digest ea9ff0fbc80da4dc014660ad536d083bdfd5c205fb988d15dd0f42a2e3b9b2fb, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/009

  7. 010 Article 10

    Article 10 Withdrawal of the benefit of the block exemption Where a Member State grants aid allegedly exempted from the notification requirement under this Regulation without fulfilling the conditions set out in Chapters I to III, the Commission may, after having provided the Member State concerned with the possibility to make its views known, adopt a decision stating that all or some of the future aid measures adopted by the Member State concerned which would otherwise fulfil the requirements of this Regulation, are to be notified to the Commission in accordance with Article 108(3) of the Treaty. The measures to be notified may be limited to the measures granting certain types of aid or in favour of certain beneficiaries or aid measures adopted by certain authorities of the Member State concerned.

    Text digest 21acff2ddab29edf24d86304a7256de9d92336d38b4acbb51c5a5e271d658f8a, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/010

  8. 011 Article 11

    Article 11 Reporting 1. Member States, or in the case of aid granted to European Territorial Cooperation projects under Article 20, alternatively the Member State in which the Managing Authority, as defined in Article 21 of Regulation (EU) No 1299/2013, or Article 45 of Regulation (EU) 2021/1059, whichever is applicable, is located, shall transmit to the Commission: (a) via the Commission’s electronic notification system, the summary information about each aid measure exempted under this Regulation in the standardised format laid down in Annex II, together with a link providing access to the full text of the aid measure, including its amendments, within 20 working days following its entry into force; and (b) an annual report, as referred to in Commission Regulation (EC) No 794/2004 in electronic form, on the application of this Regulation, containing the information indicated in that Regulation, in respect of each whole year or each part of the year during which this Regulation applies. For financial products implemented by a Member State under the InvestEU Member State compartment or by a national promotional bank acting as an implementing partner or acting as a financial intermediary under InvestEU, this obligation of the Member State is deemed to be fulfilled if the implementing partner provides the annual reports to the Commission, in accordance with the relevant reporting requirements laid down in the guarantee agreement signed between the Commission and the implementing partner. The first subparagraph shall not apply in respect of aid granted to European Territorial Cooperation projects referred to in Article 20a, as well as to community-led local development (‘CLLD’) projects as referred to in Article 19b. 2. Where, as a consequence of the extension of the application period of this Regulation until 31 December 2023 by Commission Regulation (EU) 2020/972, a Member State plans to extend measures in respect of which the summary information was submitted to the Commission in accordance with paragraph 1 of this Article, that Member State shall update that summary information regarding the extension of those measures and communicate that update to the Commission within 20 working days following the entry into force of the act which extends the respective measure by the Member State.

    Text digest bc60379b3afb9a34d2dbf00aa1648feecbba120c3093674c66c418e905d8eafa, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/011

  9. 012 Article 12

    Article 12 Monitoring 1. In order to enable the Commission to monitor the aid exempted from notification by this Regulation, Member States, or alternatively, in the case of aid granted to European Territorial Cooperation projects referred to in Article 20, the Member State in which the Managing Authority is located, shall maintain detailed records with the information and supporting documentation necessary to establish that all the conditions laid down in this Regulation are fulfilled. Such records shall be kept for 10 years from the date on which the ad hoc aid was granted or the last aid was granted under the scheme. The first subparagraph shall not apply in respect of aid granted to European Territorial Cooperation projects referred to in Article 20a, as well as to European Innovation Partnership for agricultural productivity and sustainability Operational Group projects and to community-led local development (‘CLLD’) projects as referred to Article 19b. 2. In the case of schemes under which fiscal aid is granted automatically, such as those based on tax declarations of the beneficiaries, and where there is no ex ante verification that all compatibility conditions are met for each beneficiary, Member States shall regularly verify, at least ex post and on a sample basis, that all compatibility conditions are met, and draw the necessary conclusions. Member States shall maintain detailed records of the verifications for at least 10 years from the date of the controls. 3. The Commission may request, from each Member State, all the information and supporting documentation which the Commission considers necessary to monitor the application of this Regulation, including the information mentioned in paragraphs 1 and 2. The Member State concerned shall provide the Commission with the requested information and supporting documents within a period of 20 working days from receipt of the request or such longer period as may be fixed in the request.

    Text digest 24dd9d81639fa1e4b13a49f70069766f1890527baf36220d1ba0b01c2476c330, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/012

  10. 013 Article 13

    Article 13 Scope of regional aid This Section shall not apply to: (a) aid in the steel sector, the lignite sector and the coal sector; (b) aid to the transport sector as well as the related infrastructure; aid for energy generation, storage, transmission, distribution and infrastructure, except for regional investment aid in outermost regions and regional operating aid schemes; and aid in the broadband sector except for regional operating aid schemes; (c) regional aid in the form of schemes which are targeted at a limited number of specific sectors of economic activity; schemes aimed at tourism activities or processing and marketing of agricultural products are not considered to be targeted at specific sectors of economic activity; (d) regional operating aid granted to undertakings whose principal activities fall under Section K ‘Financial and insurance activities’ of the NACE Rev. 2 or to undertakings that perform intra-group activities whose principal activities fall under classes 70.10 ‘Activities of head offices’ or 70.22 ‘Business and other management consultancy activities’ of NACE Rev. 2.

    Text digest 35d899f0e9291747e4e5cae70c950b3bae42a3b1f17052832b37aa802c759394, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/013

  11. 014 Article 14

    Article 14 Regional investment aid 1. Regional investment aid measures shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled. 2. The aid shall be granted in assisted areas. 3. In assisted areas fulfilling the conditions of Article 107(3), point (a), of the Treaty, the aid may be granted for any form of initial investment regardless of the size of the beneficiary. In assisted areas fulfilling the conditions of Article 107(3), point (c), of the Treaty, the aid may be granted to SMEs for any form of initial investment and to large enterprises only for an initial investment that creates a new economic activity in the area concerned. 4. The eligible costs shall be one or several of the following: (a) investment costs in tangible and intangible assets; or (b) the estimated wage costs of employment created as a result of an initial investment, calculated over 2 years; or (c) a combination of part of the costs referred to in points (a) and (b) but not exceeding the amount of point (a) or (b), whichever is higher. 5. The investment shall be maintained in the area concerned for at least 5 years, or 3 years for SMEs, after the completion of the investment. This shall not prevent the replacement of a plant or equipment that has become outdated or broken within this period, provided that the economic activity is retained in the area concerned for the minimum period. 6. The assets acquired shall be new except for SMEs and for the acquisition of an establishment. Costs related to the lease of tangible assets may be taken into account under the following conditions: (a) for land and buildings, the lease must continue for at least 5 years after the expected date of completion of the investment for large enterprises, and 3 years for SMEs; (b) for plant or machinery, the lease must take the form of financial leasing and must contain an obligation for the aid beneficiary to purchase the asset at the expiry of the term of the lease. In the case of an initial investment as referred to in Article 2, point 49(b) or point 51(b), in principle only the costs of buying the assets from third parties unrelated to the buyer shall be taken into consideration. However, if a member of the family of the original owner, or one or more employees, takes over a small enterprise, the condition that the assets shall be bought from third parties unrelated to the buyer does not apply. The transaction shall take place under market conditions. If the acquisition of the assets of an establishment is accompanied by an additional investment eligible for regional aid, the eligible costs of that additional investment should be added to the cost of acquisition of the assets of the establishment. If aid has already been granted for the acquisition of assets prior to their purchase, the costs of those assets shall be deducted from the eligible costs related to the acquisition of an establishment. 7. For aid awarded to large enterprises for a fundamental change in the production process, the eligible costs shall exceed the depreciation of the assets linked to the activity to be modernised over the preceding 3 fiscal years. For aid awarded to large enterprises or SMEs for a diversification of an existing establishment, the eligible costs shall exceed by at least 200 % the book value of the reused assets, as registered in the fiscal year preceding the start of works. 8. Intangible assets are eligible for the calculation of investment costs if they fulfil the following conditions: (a) they must be used exclusively in the establishment receiving the aid; (b) they must be amortisable; (c) they must be purchased under market conditions from third parties unrelated to the buyer; and (d) they must be included in the assets of the undertaking that receives the aid and must remain associated with the project for which the aid is awarded for at least 5 years (3 years for SMEs). For large enterprises, costs of intangible assets shall be eligible only up to 50 % of the total eligible investment costs for the initial investment. For SMEs, 100 % of the costs of intangible assets shall be eligible. 9. Where eligible costs are calculated by reference to the estimated wage costs as referred to in paragraph 4(b), the following conditions shall be fulfilled: (a) the investment project shall lead to a net increase in the number of employees in the establishment concerned compared to the average over the previous 12 months, after deducting from the number of jobs created any job losses that occurred during that period, expressed in annual labour units; (b) each post shall be filled within 3 years of completion of the investment; (c) each job created through the investment shall be maintained in the area concerned for a period of at least five years from the date the post was first filled, or three years in the case of SMEs, except if the job is lost between 1 January 2020 and 30 June 2021. 10. Regional aid for broadband network development shall fulfil the following conditions: (a) aid shall be granted only in areas where there is no network of the same category (either basic broadband or NGA) and where no such network is likely to be developed on commercial terms within three years from the decision to grant the aid; and (b) the subsidised network operator must offer active and passive wholesale access under fair and non-discriminatory conditions including physical unbundling in the case of NGA networks; and (c) aid shall be allocated on the basis of a competitive selection process. 11. Regional aid for research infrastructures shall be granted only if the aid is made conditional on giving transparent and non-discriminatory access to the aided infrastructure. 12. The aid intensity shall not exceed the maximum aid intensity established in the regional aid map which is in force at the time the aid is awarded in the area concerned. Where the aid intensity is calculated on the basis of paragraph 4(c), the maximum aid intensity shall not exceed the most favourable amount resulting from the application of that intensity on the basis of investment costs or wage costs. For large investment projects the aid amount shall not exceed the adjusted aid amount calculated in accordance with the mechanism defined in Article 2, point 20; 13. Any initial investment related to the same or a similar activity started by the same beneficiary (at group level) within a period of 3 years from the date of start of works on another aided investment in the same level 3 region of the Nomenclature of Territorial Units for Statistics shall be considered to be part of a single investment project. Where such single investment project is a large investment project, the total aid amount for the single investment project shall not exceed the adjusted aid amount for large investment projects. 14. The aid beneficiary shall provide a financial contribution of at least 25 % of the eligible costs through its own resources or by external financing, in a form that is free of any public support. The 25 % own contribution requirement shall not apply to investment aid granted for investment in the outermost regions insofar as a lower contribution is necessary to fully accommodate the maximum aid intensity. 15. For an initial investment linked to European territorial cooperation projects covered by Regulation (EU) No 1299/2013 or Regulation (EU) 2021/1059, the aid intensity of the area in which the initial investment is located shall apply to all beneficiaries participating in the project. If the initial investment is located in two or more assisted areas, the maximum aid intensity shall be the one applicable in the assisted area where the highest amount of eligible costs are incurred. In assisted areas eligible for aid under Article 107(3), point (c), of the Treaty, this provision shall apply to large enterprises only if the initial investment creates a new economic activity. 16. The beneficiary shall confirm that it has not carried out a relocation to the establishment in which the initial investment for which aid is requested is to take place, in the two years preceding the application for aid and give a commitment that it will not do so up to a period of two years after the initial investment for which aid is requested is completed. With regard to commitments given prior to 31 December 2019, any loss of jobs, in the same or similar activity in one of the initial establishments of the beneficiary in the EEA, occurring between 1 January 2020 and 30 June 2021, shall not be considered a transfer within the meaning of Article 2(61a) of this Regulation. 17. In the fisheries and aquaculture sector, aid shall not be granted to undertakings that have committed one or more of the infringements set out in Article 10(1)(a) to (d) and Article 10(3) of Regulation (EU) No 508/2014 of the European Parliament and of the Council and for operations of Article 11 of that Regulation.

    Text digest 9062029e53caa62b9c1037ab1e53090dab1bf6c6b85c3562be98fc64457bca24, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/014

  12. 015 Article 15

    Article 15 Regional operating aid 1. Regional operating aid schemes in outermost regions, sparsely populated areas and very sparsely populated areas shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled. 2. In sparsely populated areas, the regional operating aid schemes shall compensate for the additional transport costs of goods which have been produced in areas eligible for operating aid, as well as additional transport costs of goods that are further processed in those areas, under the following conditions: (a) the aid is objectively quantifiable in advance on the basis of a fixed sum or per tonne/kilometre ratio or any other relevant unit; (b) the additional transport costs are calculated on the basis of the journey of the goods inside the national border of the Member State concerned using the means of transport which results in the lowest costs for the beneficiary. The Member State may impose environmental standards to be fulfilled by the mode of transport chosen, and if such standards are imposed on the beneficiary it may base the calculation of the additional transport costs on the lowest cost for fulfilling those environmental standards. The aid intensity shall not exceed 100 % of the additional transport costs as set out in this paragraph. 3. In sparsely and very sparsely populated areas, the regional operating aid schemes shall prevent or reduce depopulation under the following conditions: (a) the beneficiaries have their economic activity in the area concerned; (b) the annual aid amount per beneficiary under all operating aid schemes does not exceed 20 % of the annual labour costs incurred by the beneficiary in the area concerned. 4. In outermost regions, the operating aid schemes shall compensate for the additional operating costs incurred in those regions as a direct result of one or several of the permanent handicaps referred to in Article 349 of the Treaty, where the beneficiaries have their economic activity in an outermost region provided that the annual aid amount per beneficiary under all operating aid schemes implemented under this Regulation does not exceed one of the following percentages: (a) 35 % of the gross value added annually created by the beneficiary in the outermost region concerned; (b) 40 % of the annual labour costs incurred by the beneficiary in the outermost region concerned; (c) 30 % of the annual turnover of the beneficiary realised in the outermost region concerned.

    Text digest 792401fb229ae62748b6c574c254235108bb4c01147a675ab1569969adb905c9, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/015

  13. 016 Article 16

    Article 16 Regional urban development aid 1. Regional urban development aid shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled. 2. Urban development projects shall fulfil the following criteria: (a) they are implemented via urban development funds in assisted areas; (b) they are co-financed by the European Structural and Investment Funds; (c) they support the implementation of an ‘integrated sustainable urban development strategy’; 3. The total investment in an urban development project under any urban development aid measure shall not exceed EUR 22 million. 4. The eligible costs shall be the overall costs of the urban development project to the extent that they comply with Articles 37 and 65 of Regulation (EU) No 1303/2013, or Articles 67 and 68 of Regulation (EU) 2021/1060, whichever is applicable. 5. Aid granted by an urban development fund to the eligible urban development projects may take the form of equity, quasi-equity, loans, guarantees, or a mix thereof. 6. The urban development aid shall leverage additional investment from independent private investors as defined in Article 2 point (72) at the level of the urban development funds or the urban development projects, so as to achieve an aggregate amount reaching a minimum of 20 % of the total financing provided to an urban development project. 7. Private and public investors may provide cash or an in-kind contribution or a combination of those for the implementation of an urban development project. An in-kind contribution shall be taken into account at its market value, as certified by an independent qualified expert or duly authorised official body. 8. The urban development measures shall fulfil the following conditions: (a) urban development fund managers shall be selected through an open, transparent and non-discriminatory call in accordance with the applicable Union and national laws. In particular, there shall be no discrimination between urban development fund managers on the basis of their place of establishment or incorporation in any Member State. Urban development fund managers may be required to fulfil predefined criteria objectively justified by the nature of the investments; (b) the independent private investors shall be selected through an open, transparent and non-discriminatory call in accordance with applicable Union and national laws aimed at establishing the appropriate risk-reward sharing arrangements whereby, for investments other than guarantees, asymmetric profit-sharing shall be given preference over downside protection. If the private investors are not selected by such a call, the fair rate of return to the private investors shall be established by an independent expert selected via an open, transparent and non-discriminatory call; (c) in the case of asymmetric loss-sharing between public and private investors, the first loss assumed by the public investor shall be capped at 25 % of the total investment; (d) in the case of guarantees to private investors in urban development projects, the guarantee rate shall be limited to 80 % and total losses assumed by a Member State shall be capped at 25 % of the underlying guaranteed portfolio; (e) the investors shall be allowed to be represented in the governance bodies of the urban development fund, such as the supervisory board or the advisory committee; (f) the urban development fund shall be established according to the applicable laws. The Member State shall provide for a due diligence process in order to ensure a commercially sound investment strategy for the purpose of implementing the urban development aid measure. 9. Urban development funds shall be managed on a commercial basis and shall ensure profit-driven financing decisions. This is considered to be the case when the managers of the urban development fund fulfill the following conditions: (a) the managers of urban development funds shall be obliged by law or contract to act with the diligence of a professional manager in good faith and avoiding conflicts of interest; best practices and regulatory supervision shall apply; (b) the remuneration of the managers of urban development funds shall conform to market practices. This requirement is considered to be met where a manager is selected through an open, transparent and non-discriminatory call, based on objective criteria linked to experience, expertise and operational and financial capacity; (c) the managers of urban development funds shall receive a remuneration linked to performance, or shall share part of the investment risks by co-investing own resources so as to ensure that their interests are permanently aligned with the interests of the public investors; (d) the managers of urban development funds shall set out an investment strategy, criteria and the proposed timing of investments in urban development projects, establishing the ex ante financial viability and their expected impact on urban development; (e) a clear and realistic exit strategy shall exist for each equity and quasi-equity investment. 10. Where an urban development fund provides loans or guarantees to urban development projects, the following conditions shall be fulfilled: (a) in the case of loans, the nominal amount of the loan is taken into account in calculating the maximum investment amount for the purposes of paragraph 3 of this Article; (b) in the case of guarantees, the nominal amount of the underlying loan is taken into account in calculating the maximum investment amount for the purposes of paragraph 3 of this Article. 11. The Member State may assign the implementation of the urban development aid measure to an entrusted entity.

    Text digest 97cf941b9384dd8414081126c1daf81dd17ceb51b20fd6a541aa8e45e7b1b6ab, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/016

  14. 017 Article 17

    Article 17 Investment aid to SMEs 1. Investment aid to SMEs operating inside or outside the territory of the Union shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled. 2. The eligible costs shall be one or several of the following: (a) the costs of investment in tangible and intangible assets, including one-off non-amortizable costs linked directly to the investment and its initial installation; (b) the estimated wage costs of employment directly created by the investment project, calculated over 2 years; (c) a combination of part of the costs referred to in points (a) and (b) but not exceeding the amount of point (a) or (b), whichever is higher. 3. In order to be considered an eligible cost for the purposes of this Article, an investment shall consist of the following: (a) an investment in tangible and intangible assets related to the setting-up of a new establishment; the extension of an existing establishment; the diversification of the output of an establishment into products or services not previously produced in or provided from the establishment; or a fundamental change in the overall production process of the product(s) or overall provision of the service(s) concerned by the investment in the establishment; or (b) an acquisition of assets belonging to an establishment that has closed or would have closed had it not been purchased. Sole acquisition of the shares of an undertaking does not qualify as investment. The transaction shall take place under market conditions. In principle, only the costs of buying the assets from third parties unrelated to the buyer shall be taken into consideration. However, if a member of the family of the original owner, or one or more employees, takes over a small enterprise, the condition that the assets shall be bought from third parties unrelated to the buyer does not apply. A replacement investment thus does not constitute an investment in the meaning of this paragraph. 3a. Costs related to the lease of tangible assets may be taken into account under the following conditions: (a) for land and buildings, the lease must continue for at least 3 years after the expected date of completion of the investment; (b) for plant or machinery, the lease must take the form of financial leasing and must contain an obligation for the aid beneficiary to purchase the asset at the expiry of the term of the lease. 4. Intangible assets shall fulfil all of the following conditions: (a) they shall be used exclusively in the establishment receiving the aid; (b) they shall be amortisable; (c) they shall be purchased under market conditions from third parties unrelated to the buyer; (d) they shall be included in the assets of the undertaking that receives the aid for at least 3 years. 5. Employment directly created by an investment project shall fulfil the following conditions: (a) it shall be created within three years of completion of the investment; (b) there shall be a net increase in the number of employees in the establishment concerned, compared with the average over the previous 12 months; (c) it shall be maintained during a minimum period of three years from the date the post was first filled. 6. The aid intensity shall not exceed: (a) 20 % of the eligible costs in the case of small enterprises; (b) 10 % of the eligible costs in the case of medium-sized enterprises.

    Text digest ee9162da83568e4311e521636e7ae12bafdd28ac6515c82f80c4a896ebc83c91, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/017

  15. 018 Article 18

    Article 18 Aid for consultancy in favour of SMEs 1. Aid for consultancy in favour of SMEs shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled. 2. The aid intensity shall not exceed 50 % of the eligible costs. 3. The eligible costs shall be the costs of consultancy services provided by external consultants. 4. The services concerned shall not be a continuous or periodic activity nor relate to the undertaking's usual operating costs, such as routine tax consultancy services, regular legal services or advertising.

    Text digest 34056b3c144040e7c9e9fa191851d24c557ae7a7f45a1c36d6b536f1231aa6c4, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/018

  16. 019 Article 19

    Article 19 Aid to SMEs for participation in fairs 1. Aid to SMEs for participation in fairs shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled. 2. The eligible costs shall be the costs incurred for renting, setting up and running the stand for the participation of an undertaking in any particular fair or exhibition. 3. The aid intensity shall not exceed 50 % of the eligible costs.

    Text digest ec417618b0af4d93669f830cd0da7876959b2855bb8e7001ca445cc45fb1b75c, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/019

  17. 019A Article 19a

    Article 19a Aid for costs incurred by SMEs participating in community-led local development (‘CLLD’) projects 1. Aid for costs incurred by SMEs participating in CLLD projects covered by Regulation (EU) No 1303/2013 or Regulation (EU) 2021/1060 shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided the conditions laid down in this Article and in Chapter I are fulfilled. 2. The following costs, set out in Article 35(1) of Regulation (EU) No 1303/2013 or Article 34(1) of Regulation (EU) 2021/1060, whichever is applicable, shall be eligible for CLLD projects: (a) the costs of preparatory support, capacity building, training and networking with a view of preparing and implementing a CLLD strategy; (b) implementation of approved operations; (c) preparation and implementation of the cooperation activities; (d) running costs linked to the management of the implementation of the CLLD strategy; (e) animation of the CLLD strategy in order to facilitate exchange between stakeholders to provide information and to promote the strategy and projects, and to support potential beneficiaries with a view of developing operations and preparing applications. 3. The aid intensity shall not exceed the maximum support rates provided for in the Fund specific Regulations supporting CLLD.

    Text digest f551e3251e2585fcdc0e3f7ac09b39d2c0c9c15b6115a2280b619a657d8df585, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/019A

  18. 019B Article 19b

    Article 19b Limited amounts of aid to SMEs benefitting from community-led local development (‘CLLD’) projects 1. Aid to undertakings participating in, or benefitting from, CLLD projects, as referred to in Article 19a(1), shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided the conditions laid down in this Article and in Chapter I are fulfilled. 2. The total amount of aid under this Article granted per project shall not exceed EUR .

    Text digest 4dfe4273f7b2766991bffc577059d0751d54e01933278e7014f4cab724f98dfd, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/019B

  19. 019C Article 19c

    Article 19c Aid to microenterprises in the form of public interventions concerning the supply of electricity, gas or heat 1. Aid to microenterprises in the form of of public interventions concerning the supply of electricity, gas or heat shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled. This Article shall apply to: (a) public interventions in price setting reducing the prices applied by suppliers to microenterprises per unit of electricity, gas or heat; (b) payments made to microenterprises, be it directly or via suppliers, per unit of electricity, gas or heat consumption compensating for part of the costs of that consumption. 2. The measures pursuant to paragraph 1 shall: (a) discriminate neither between suppliers nor between microenterprises; (b) provide that all suppliers are eligible to provide offers for the supply of electricity, gas or heat to microenterprises on the same basis; (c) provide for a mechanism that, if granted via a supplier, ensures that the aid is passed on to the largest extent possible the final beneficiary; and (d) result in a price that is above cost, at a level where effective price competition can occur. 3. The aid amount shall be equal to the payment granted or, in the case of public interventions in price setting, shall not exceed the difference between the market price that would have had to be paid for the total electricity, gas and/or heat consumed by a beneficiary, and the price to be paid for this consumption following the public intervention.

    Text digest 4608085175d6cc4e9f37354b095a5eb792b6563d9643a5513f3f03b7f3637ebe, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/019C

  20. 019D Article 19d

    Article 19d Aid to SMEs in the form of temporary public interventions concerning the supply of electricity, gas or heat produced from natural gas or electricity to mitigate the impact of price increases following Russia’s war of aggression against Ukraine 1. Aid to SMEs in the form of public interventions concerning the supply of electricity, gas or heat, to the extent it is produced from natural gas or electricity, shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled. This Article shall apply to: (a) public interventions in price setting reducing the prices applied by suppliers per unit of electricity, gas or heat; (b) payments granted to SMEs, be it directly or via suppliers, per unit of electricity, gas or heat consumption compensating for part of the costs of that consumption. 2. The measures pursuant to paragraph 1 shall: (a) be limited to maximum 70 % of the beneficiary's consumption of electricity, gas or heat produced from natural gas or electricity over the period covered by the aid measure; (b) discriminate neither between suppliers nor between SMEs; (c) provide for compensation of suppliers, if the public intervention requires them to supply below cost; (d) provide that all suppliers are eligible to provide offers for the supply of electricity, gas or heat on the same basis; (e) provide for a mechanism that, if granted via a supplier, ensures that the aid is passed on to the largest extent possible to the final beneficiary; and (f) result in an average unit price of supplies at least equal to the average price per unit of electricity, gas, or heat respectively to final customers in the Member State concerned over the period from 1 January to 31 December 2021. 3. Payments made to suppliers for supplies provided to SMEs, as imposed by public interventions in price setting below the cost of the supplier, shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that: (a) the public intervention in price setting meets the requirements set out in paragraph 2; and (b) the compensation payment shall not exceed the difference between the price that the supplier could have expected to achieve when applying market-based supply prices without the intervention and the price set below cost by the public intervention. 4. This Article shall apply to aid granted for the cost of electricity, gas or heat which is consumed during a period where public interventions in price setting for the benefit of SMEs that receive supplies of either gas, electricity or heat are expressly allowed pursuant to secondary legislation based on Article 122 of the Treaty. The granting of aid shall occur no later than 12 months after the end of this period. 5. The aid amount shall be equal to the payment granted either to the SME or the supplier, or, in the case of public interventions in price setting, shall not exceed the difference between the market price that would have had to be paid for the total energy consumed by a beneficiary, and the price to be paid for this consumption following the public intervention.

    Text digest 3c65221b62785fb5e6df554fb7068469ec16ac1e2430e0ea436776d7302ecd4a, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/019D

  21. 020 Article 20

    Article 20 Aid for costs incurred by undertakings participating in European Territorial Cooperation project 1. Aid for costs incurred by undertakings participating in European Territorial Cooperation projects covered by Regulation (EU) No 1299/2013 or Regulation (EU) 2021/1059 shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided the conditions laid down in this Article and in Chapter I are fulfilled. 2. To the extent that they are linked to the cooperation project, the following costs, which shall have the meaning ascribed to them in Commission Delegated Regulation (EU) No 481/2014, or Articles 38 to 44 of Regulation (EU) 2021/1059, whichever is applicable, shall be eligible costs: (a) staff costs; (b) office and administrative costs; (c) travel and accommodation costs; (d) external expertise and services costs; (e) equipment costs; (f) costs for infrastructure and works. 3. The aid intensity shall not exceed the maximum co-financing rate provided for in Regulation (EU) No 1303/2013 or Regulation (EU) 2021/1060 and/or Regulation (EU) 2021/1059, whichever is applicable.

    Text digest 1c944734e4c35eee0228cd47fa0b1523f46a6b69c6e27dd3b167c990f355283a, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/020

  22. 020A Article 20a

    Article 20a Limited amounts of aid to undertakings for participation in European Territorial Cooperation projects 1. Aid to undertakings for their participation in European Territorial Cooperation projects covered by Regulation (EU) No 1299/2013 or by Regulation (EU) 2021/1059 shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided the conditions laid down in this Article and in Chapter I are fulfilled. 2. The total amount of aid under this Article granted to an undertaking per project shall not exceed EUR .

    Text digest d7afe78a95c727e0b17c21af6a0081cd609bafa90c358e1cc40575c822edd35a, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/020A

  23. 021 Article 21

    Article 21 Risk finance aid 1. Risk finance aid schemes in favour of SMEs shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled. 2. Member States, either directly or through an entrusted entity, shall implement the risk finance measure via one or more financial intermediaries. Member States or entrusted entities shall provide a public contribution to financial intermediaries in accordance with paragraphs 9 to 13; and financial intermediaries, in accordance with paragraphs 14 to 17, shall make risk finance investments in accordance with paragraphs 4 to 8, into eligible undertakings that comply with paragraph 3. Neither Member States nor entrusted entities shall invest directly into the eligible undertakings without the involvement of a financial intermediary. 3. Eligible undertakings shall be undertakings that are unlisted SMEs and fulfil, at the time of the initial risk finance investment, at least one of the following conditions: (a) they have not been operating in any market; (b) they have been operating in any market for any of the following: (i) less than 10 years following their registration; or (ii) less than 7 years after their first commercial sale. Where one of the eligibility periods referred to in points (i) and (ii) has been applied to a given undertaking, only that period can be applied also to any subsequent risk finance aid to the same undertaking. For undertakings that have acquired another undertaking or were formed through a merger, the eligibility period applied shall also encompass the operations of the acquired undertaking or the merged undertakings, respectively, except for such acquired or merged undertakings whose turnover accounts for less than 10 % of the turnover of the acquiring undertaking in the financial year preceding the acquisition or, in case of undertakings formed through a merger, less than 10 % of the combined turnover that the merging undertakings had in the financial year preceding the merger. Concerning the eligibility period referred to in point (i), if applied, for undertakings that are not subject to registration, the eligibility period shall start from either the moment when the undertaking starts its economic activity or the moment when it becomes liable to tax with regard to its economic activity, whichever is earlier; (c) they require an initial investment which, based on a business plan prepared in view of a new economic activity, is higher than 50 % of their average annual turnover in the preceding 5 years. By way of derogation from the first sentence, that threshold shall be limited to 30 % with regard to the following investments, which shall be considered initial investments into a new economic activity: (i) investments significantly improving the environmental performance of the activity in accordance with Article 36(2); (ii) other environmentally sustainable investments as defined in Article 2(1) of Regulation (EU) 2020/852; (iii) investments aiming at increasing capacity for the extraction, separation, refining, processing or recycling of a critical raw material listed in Annex IV. 4. The risk finance investment may also cover follow-on investments made in eligible undertakings, including after the eligibility period referred to in paragraph 3, point (b), if the following cumulative conditions are fulfilled: (a) the total amount of risk finance referred to in paragraph 8 is not exceeded; (b) the possibility of follow-on investments was provided for in the original business plan; (c) the undertaking receiving the follow-on investments has not become a ‘linked enterprise’, within the meaning of Article 3(3) of Annex I, with another undertaking other than the financial intermediary or the independent private investor providing risk finance under the measure, unless the new entity is an SME. 5. Risk finance investments into eligible undertakings may take the form of equity, quasi-equity investments, loans, guarantees, or a mix thereof. 6. When guarantees are provided, the guarantee shall not exceed 80 % of the underlying loan to the eligible undertaking. 7. For risk finance investments in the form of equity and quasi-equity investments in eligible undertakings, a risk finance measure may cover replacement capital only if the latter is combined with new capital representing at least 50 % of each investment round into the eligible undertakings. 8. The total outstanding amount of risk finance investment referred to in paragraph 5 shall not exceed EUR 16.5 million per eligible undertaking under any risk finance measure. In order to calculate this maximum risk finance investment amount, the following shall be taken into account: (a) in the case of loans and quasi-equity investments structured as debt, the nominal outstanding amount of the instrument; (b) in the case of guarantees, the nominal outstanding amount of the underlying loan. 9. The public contribution provided to financial intermediaries may take one of the following forms: (a) equity or quasi-equity, or financial endowment to provide risk finance investment directly or indirectly to eligible undertakings; (b) loans to provide risk finance investment directly or indirectly to eligible undertakings; (c) guarantees to cover losses from risk finance investment directly or indirectly to eligible undertakings. 10. Risk-reward sharing arrangements between, on the one hand, the Member State (or its entrusted entity) and, on the other hand, private investors, financial intermediaries or fund managers, shall be adequate and shall comply with the following conditions: (a) for risk finance aid in forms other than guarantees, prioritised returns from profits (asymmetric profit sharing or upside incentives) shall be given preference over protection against potential losses (downside protection); (b) in the case of asymmetric loss-sharing between public and private investors, the first loss borne by the public investor shall be capped at 25 % of the risk finance investment; (c) for risk finance aid in the form of guarantees, the guarantee rate shall be limited to 80 % and total losses assumed by a Member State shall be capped at a maximum of 25 % of the underlying guaranteed portfolio. Only guarantees covering expected losses of the underlying guaranteed portfolio may be provided for free. If a guarantee also comprises coverage of unexpected losses, the financial intermediary shall pay, for the part of the guarantee covering unexpected losses, a market-conform guarantee premium. 11. Where the public contribution provided to the financial intermediary takes the form of equity and quasi-equity as referred to in paragraph 9, point (a), no more than 30 % of the financial intermediary's aggregate capital contributions and uncalled committed capital may be used for liquidity management purposes. 12. For risk finance measures aimed at providing risk finance investments in the form of equity, quasi-equity or loans to eligible undertakings, the public contribution provided to the financial intermediary shall leverage additional finance from independent private investors at the level of the financial intermediaries or the eligible undertakings, so as to achieve an aggregate private participation rate reaching the following minimum thresholds: (a) 10 % of the risk finance investment provided to the eligible undertakings referred to in paragraph 3, point (a); (b) 40 % of the risk finance investment provided to the eligible undertakings referred to in paragraph 3 point (b); (c) 60 % of the risk finance investment provided to the eligible undertakings referred to in paragraph 3, point (c), and for follow-on risk finance investment in eligible undertakings after the eligibility period referred to in paragraph 3, point (b). Finance provided by independent private investors benefitting from risk finance aid in the form of tax incentives in accordance with Article 21a shall not be taken into account for the purposes of reaching the aggregate private participation rates set out in the first subparagraph of this paragraph. The private participation rates mentioned in the first subparagraph, points (b) and (c), shall be reduced to 20 % under point (b) and 30 % under point (c) for investments that are either: made in assisted areas designated in an approved regional aid map in force at the time of provision of the risk finance investment in application of Article 107(3), point (a), of the Treaty; or that receive support on the basis of the Member State’s recovery and resilience plan as approved by the Council; or receive support from the European Defence Fund in accordance with Regulation (EU) 2021/697 or under the Union Space Programme in accordance with Regulation (EU) 2021/696 of the European Parliament and of the Council; or that receive support from Union funds implemented under shared management covered by Regulation (EU) 1303/2013, Regulation (EU) 2021/1060 or Regulation (EU) 2021/2115 of the European Parliament and of the Council. 13. Where a risk finance measure is implemented through a financial intermediary targeting eligible undertakings at different development stages as referred to in paragraphs 3 and 4, the financial intermediary shall achieve a private participation rate that represents at least the weighted average based on the volume of the individual investments in the underlying portfolio and resulting from the application of the minimum participation rates to such investments as referred to in paragraph 12, unless the required participation from independent private investors is achieved at the level of the eligible undertakings. 14. Financial intermediaries and fund managers shall be selected through an open, transparent and non-discriminatory procedure in accordance with applicable Union and national laws. Member States may require that eligible financial intermediaries and fund managers fulfil predefined criteria objectively justified by the nature of the investments. The procedure shall be based on objective criteria linked to experience, expertise and operational and financial capacity, and shall comply with the following cumulative conditions: (a) it shall ensure that eligible financial intermediaries and fund managers are established in accordance with the applicable laws; (b) it shall not discriminate between financial intermediaries and fund managers on the basis of their place of establishment or incorporation in any Member State; (c) it shall aim at establishing adequate risk-reward sharing arrangements as referred to in paragraph 10, and profit-driven decisions as referred to in paragraph 15. 15. Risk finance measures shall ensure that the financial intermediaries receiving the public contribution take profit-driven decisions when providing eligible undertakings with risk finance investments. This obligation is met where the following cumulative conditions are fulfilled: (a) the Member State, or the entity entrusted with the implementation of the measure, shall provide for a due diligence process in order to ensure a commercially sound investment strategy for the purpose of implementing the risk finance measure, including an appropriate risk diversification policy aimed at achieving economic viability and efficient scale in terms of size and territorial scope of the relevant portfolio of investments; (b) risk finance investments provided to the eligible undertakings shall be based on a viable business plan, containing details of product, sales and profitability development, establishing ex ante financial viability; (c) a clear and realistic exit strategy shall exist for each equity and quasi-equity investment. 16. Financial intermediaries shall be managed on a commercial basis. This requirement is met where the financial intermediary and, depending on the type of risk finance measure, the fund manager, fulfil the following cumulative conditions: (a) they shall be obliged by law or contract to act in accordance with best practices and with the diligence of a professional manager acting in good faith and avoiding conflicts of interest; regulatory supervision shall apply, where relevant; (b) their remuneration shall conform to market practices. This requirement is presumed to be met as long as they are selected through an open, transparent and non-discriminatory selection procedure in accordance with in paragraph 14; (c) they shall share part of the investment risks by either co-investing their own resources or receiving a remuneration linked to performance, so as to ensure that their interests are permanently aligned with the interests of the Member State or its entrusted entity; (d) they shall set out an investment strategy, criteria and the proposed timing of investments; (e) investors shall be allowed to be represented in the governance bodies of the investment fund, such as the supervisory board or the advisory committee, if any. 17. In a risk finance measure where risk finance investment is provided to eligible undertakings in the form of guarantees, loans or quasi-equity investments structured as debt, the financial intermediary shall undertake risk finance investments into eligible undertakings that would not have been carried out or would have been carried out in a restricted or different manner without the aid. The financial intermediary shall be able to demonstrate that it operates a mechanism that ensures that all the advantages are passed on to the largest extent to the eligible undertakings in the form of higher volumes of financing, riskier portfolios, lower collateral requirements, lower guarantee premiums or lower interest rates. 18. Risk finance measures providing risk finance investments for SMEs that do not fulfil the conditions laid down in paragraph 3 shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the following cumulative conditions are fulfilled: (a) at the level of the SMEs, the aid fulfils the conditions laid down in Commission Regulation (EU) No 1407/2013, Commission Regulation (EU) No 1408/2013 or Regulation (EU) No 717/2014, whichever is applicable; (b) all the conditions laid down in this Article are fulfilled, with the exception of the conditions set out in paragraphs 3, 4, 8, 12 and/or 13; (c) for risk finance measures providing risk finance investments to eligible undertakings in the form of equity, quasi-equity or loans, the measure shall leverage additional financing from independent private investors at the level of the financial intermediaries or the SMEs, so as to achieve an aggregate private participation rate reaching at least 60 % of the risk finance provided to the SMEs. The private participation rate mentioned in the first subparagraph, point (c), shall be reduced to 30 % for investments that are either: made in assisted areas designated in an approved regional aid map in force at the time of provision of the risk finance investment in application of Article 107(3), point (a), of the Treaty; or that receive support on the basis of the Member State’s recovery and resilience plan as approved by the Council; or receive support from the European Defence Fund in accordance with Regulation (EU) 2021/697or under the Union Space Programme in accordance with Regulation (EU) 2021/696 or from Union Funds implemented under shared management covered by Regulation (EU) 1303/2013, Regulation (EU) 2021/1060 or Regulation (EU) 2021/2115.

    Text digest d945c2a3df2779e81ea6e7eec80f39268744057c0bca9648d39db77565a92b52, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/021

  24. 021A Article 21a

    Article 21a Risk finance aid to SMEs in the form of tax incentives for private investors who are natural persons 1. Risk finance aid schemes in favour of SMEs in the form of tax incentives to independent private investors who are natural persons providing risk finance directly or indirectly to eligible undertakings shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled. 2. Eligible undertakings are those that fulfill the criteria laid down in Article 21(3). The total risk finance investment provided under Article 21 and under this Article to each eligible undertaking shall not exceed the maximum amount laid down in Article 21(8). 3. Where the independent private investor provides risk finance indirectly through a financial intermediary, the eligible investment shall take the form of the acquisition of shares or participations in the financial intermediary, which shall in turn provide risk finance investments to eligible undertakings in accordance with Article 21(5) to (8). No tax incentive may be granted in respect of the services provided by the financial intermediary or its managers. 4. Where the independent private investor provides risk finance directly to the eligible undertaking, only the acquisition of newly issued full-risk ordinary shares issued by an eligible undertaking shall constitute an eligible investment. Those shares shall be kept for at least 3 years. Replacement capital shall only be covered under the conditions laid down in Article 21(7). Concerning the possible forms of tax incentives, losses arising upon disposal of the shares may be set-off against income tax. In the case of tax relief on dividends, any dividend received in respect of qualifying shares may be (fully or partially) exempt from income tax. Any profit on the sale of qualifying shares may be either (fully or partially) exempt from capital gains tax or the tax liability with respect to such profit may be deferred if reinvested in new qualifying shares within 1 year. 5. Where the independent private investor provides risk finance directly to the eligible undertaking, in order to ensure an adequate participation of such independent private investor, in accordance with Article 21(12), the tax relief, counted as the cumulative maximum tax relief from all tax incentives combined, shall not surpass the following maximum thresholds: (a) 50 % of the eligible investment carried out by the independent private investor into the eligible undertakings referred to in Article 21(3), point (a); (b) 35 % of the eligible investment carried out by the independent private investor into the eligible undertakings referred to in Article 21(3), point (b); (c) 20 % of the eligible investment carried out by the independent private investor into the eligible undertakings referred to in Article 21(3), point (c), or of a follow-on eligible investment into an eligible undertaking after the eligibility period referred to in Article 21(3), point (b). The tax relief thresholds for the direct investments mentioned in the first subparagraph, may be increased up to 65 % under point (a), up to 50 % under point (b) and up to 35 % under point (c) for investments that are either: made in assisted areas designated in an approved regional aid map in force at the time of provision of the risk finance investment in application of Article 107(3), point (a), of the Treaty; or that receive support on the basis of the Member State’s recovery and resilience plan as approved by the Council; or receive support from the European Defence Fund in accordance with Regulation (EU) 2021/697 or under the Union Space Programme in accordance with Regulation (EU) 2021/696; or that receive support from Union funds implemented under shared management covered by Regulation (EU) 1303/2013, Regulation (EU) 2021/1060 or Regulation (EU) 2021/2115. 6. Where the independent private investor provides risk finance indirectly through a financial intermediary, and in accordance with Article 21(12), the tax relief, counted as the cumulative maximum tax relief from all tax incentives combined, shall not surpass 30 % of the eligible investment carried out by the independent private investor into an eligible undertaking referred to in Article 21(3). This tax relief threshold may be increased up to 50 % for investments that are either: made in assisted areas designated in an approved regional aid map in force at the time of provision of the risk finance investment in application of Article 107(3), point (a), of the Treaty; or that receive support on the basis of the Member State’s recovery and resilience plan as approved by the Council; or receive support from the European Defence Fund in accordance with Regulation (EU) 2021/697 or under the Union Space Programme in accordance with Regulation (EU) 2021/696; or that receive support from Union funds implemented under shared management covered by Regulation (EU) 1303/2013, Regulation (EU) 2021/1060 or Regulation (EU) 2021/2115.

    Text digest 7e740afbb1549966be64355524c1447cc4f763ba08d4d048ff027f79ddea1562, body digest 4fa8d65ff7a521489e6dc3d879e076796e522fe9019059a4e831b1332b648fc6, official source https://publications.europa.eu/resource/cellar/e29b65e7-3061-11ee-9e98-01aa75ed71a1.0004.01, /eu-eurlex/32014R0651/2023-07-01--c1d75768b3a674cf7fc2cc69ccf6115723673d86b91a006658ccf6a509bd0563/eng/021A

What this reading does not hold

  • publisher_signature: no signature or attestation of the publisher is held; the digests are this index's own reading of the retained package
  • unconsolidated_amendments: an amendment the publisher has not yet consolidated is not held: the latest consolidated wording answers every later date, as dated
  • force_dates: the act's own dates are said under force_dates, as the publisher's dated statements on the act give them; none of them is used to choose a wording, each wording carries its own date, and a date the publisher records without a dated statement is not held
  • observation_time: when the publisher served the retained package is not held, so no observation time is stated
  • markup_and_notes: the Formex markup, notes and tables are not served as structure; the text is the article's searchable text, in publisher order
  • annexes: no annex text is held: annexes are not indexed as articles, so no annex is searched, quoted or exported; annexes_not_served lists the annexes the corpus classified against the publisher PDF on the members an expression was read from, with the official source to read them, and an empty list says only that the corpus classified none there, not that the act has none