The text of one Luxembourg work as it stood on one date, or of one EU work in the wording that answers that date (its original wording or a later consolidated one), article by article, as the publisher wrote it, with what a quotation of it needs. The identifier and the date go to this server in the request and nowhere else, and this page keeps nothing.
Lex shows the published text of the law. It does not tell you whether or how it applies to your situation and is not legal advice.
070 Article 70
Quoted from 32019L0944, eng, the consolidated wording of 2025-10-12 (the publisher's consolidation date).
Article 70 Amendments to Directive 2012/27/EU Directive 2012/27/EU is amended as follows: (1) Article 9 is amended as follows: (a) the title is replaced by the following: ‘Metering for natural gas’; (b) in paragraph 1, the first subparagraph is replaced by the following: ‘1. Member States shall ensure that, in so far as it is technically possible, financially reasonable, and proportionate to the potential energy savings, for natural gas final customers are provided with competitively priced individual meters that accurately reflect the final customer's actual energy consumption and that provide information on actual time of use.’; (c) paragraph 2 is amended as follows: (i) the introductory part is replaced by the following: ‘2. Where, and to the extent that, Member States implement intelligent metering systems and roll out smart meters for natural gas in accordance with Directive 2009/73/EC:’; (ii) points (c) and (d) are deleted; (2) Article 10 is amended as follows: (a) the title is replaced by the following: ‘Billing information for natural gas’; (b) in paragraph 1, the first subparagraph is replaced by the following: ‘1. Where final customers do not have smart meters as referred to in Directive 2009/73/EC, Member States shall ensure, by 31 December 2014, that billing information for natural gas is reliable, accurate and based on actual consumption, in accordance with point 1.1 of Annex VII, where that is technically possible and economically justified.’; (c) in paragraph 2, the first subparagraph is replaced by the following: ‘2. Meters installed in accordance with Directive 2009/73/EC shall enable the provision of accurate billing information based on actual consumption. Member States shall ensure that final customers have the possibility of easy access to complementary information on historical consumption allowing detailed self-checks.’; (3) in Article 11, the title is replaced by the following: ‘Cost of access to metering and billing information for natural gas’; (4) in Article 13, the words ‘Articles 7 to 11’ are replaced by the words ‘Articles 7 to 11a’; (5) Article 15 is amended as follows: (a) paragraph 5 is amended as follows: (i) the first and second subparagraphs are deleted; (ii) the third subparagraph is replaced by the following: ‘Transmission system operators and distribution system operators shall comply with the requirements set out in Annex XII.’; (b) paragraph 8 is deleted; (6) in Annex VII, the title is replaced by the following: ‘Minimum requirements for billing and billing information based on actual consumption of natural gas’.Text digest cd184f51eb43372bf1dd960104a8d7fff7ce360d9e380015fa957951606cc2bb, body digest b5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official source https://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01, /eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/070
Cite this article
- Usual citation
- Article 70 of Directive (EU) 2019/944
- With its permalink
- Article 70 of Directive (EU) 2019/944 (https://law.soufien.lu/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/070)
- Evidence form
- Article 70 of Directive (EU) 2019/944
Permalink: https://law.soufien.lu/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/070
CELEX: 02019L0944-20251012
Wording: the consolidated wording of 2025-10-12
Published in: the Official Journal reference is not held by this index.
Text digest (SHA-256): cd184f51eb43372bf1dd960104a8d7fff7ce360d9e380015fa957951606cc2bb
Consulted on Lex on 2026-10-31 (date in Luxembourg).
Only the Official Journal of the European Union published in electronic form is authentic and produces legal effects (Regulation (EU) No 216/2013, Article 1(2)); this text is a reproduction read from the Publications Office's Formex package, not the authentic edition.
© European Union, https://eur-lex.europa.eu
Only the Official Journal of the European Union published in electronic form is authentic and produces legal effects (Regulation (EU) No 216/2013, Article 1(2)); this text is a reproduction read from the Publications Office's Formex package, not the authentic edition.
The publisher's dates this site holds for this act
- Entry into force: 2019-07-04 (the publisher's qualifier, word for word:
DATPUB +20 V ART 73) - Application: 2020-01-01 (the publisher's qualifier, word for word:
MA/PART V ART 73) - Application: 2020-10-26 (the publisher's qualifier, word for word:
MA/PART V ART 73) - Application: 2021-01-01 (the publisher's qualifier, word for word:
MA/PART V ART 73) - End of validity, in whole or in part: 2025-10-11 (the publisher's qualifier, word for word:
FIN/VAL/PART ART 70 A/PAR 32023L1791) - Deadline: 2025-01-01 (the publisher's qualifier, word for word:
V ART 66.4) - Deadline: 2025-12-31 (the publisher's qualifier, word for word:
B-19.12 V ART 69.2) - Deadline: 2027-07-05 (the publisher's qualifier, word for word:
V ART 66.5)
None of the dates above is used to choose a wording: each wording below carries its own date.
32019L0944, eng, the consolidated wording of 2025-10-12 (the publisher's consolidation date)
This is the latest wording held: it answers every later date, and an amendment the publisher has not yet consolidated is not in it.
1 other publisher work carries this date: 1 with this same text held here, 0 with no text held here.
80 articles quoted, 0 held without text.
Contents
Page 3 of 3: Article 59 to Article 74.
059 Article 59
Article 59 Duties and powers of the regulatory authorities 1. The regulatory authority shall have the following duties: (a) fixing or approving, in accordance with transparent criteria, transmission or distribution tariffs or their methodologies, or both; (aa) carrying out the obligations laid out in Article 3, Article 5(7) and Articles 14 to 17 of Regulation (EU) 2022/869 of the European Parliament and the Council. (b) ensuring the compliance of transmission system operators and distribution system operators and, where relevant, system owners, as well as the compliance of any electricity undertakings and other market participants, with their obligations under this Directive, Regulation (EU) 2019/943, the network codes and the guidelines adopted pursuant to Articles 59, 60 and 61 of Regulation (EU) 2019/943, and other relevant Union law, including as regards cross-border issues, as well as with ACER's decisions; (c) in close coordination with the other regulatory authorities, ensuring the compliance of the single allocation platform established in accordance with Commission Regulation (EU) 2016/1719, the ENTSO for Electricity and the EU DSO entity with their obligations under this Directive, Regulation (EU) 2019/943, the network codes and guidelines adopted pursuant to Articles 59, 60 and 61 of Regulation (EU) 2019/943, and other relevant Union law, including as regards cross-border issues, as well as with ACER’s decisions, and jointly identifying non-compliance of the single allocation platform, the ENTSO for Electricity and the EU DSO entity with their respective obligations; where the regulatory authorities have not been able to reach an agreement within a period of four months after the start of consultations for the purpose of jointly identifying non-compliance, the matter shall be referred to the ACER for a decision, pursuant to Article 6(10) of Regulation (EU) 2019/942; (d) approving products and procurement process for non-frequency ancillary services; (e) implementing the network codes and guidelines adopted pursuant to Articles 59, 60 and 61 of Regulation (EU) 2019/943 through national measures or, where so required, coordinated regional or Union-wide measures; (f) cooperating in regard to cross-border issues with the regulatory authority or authorities of the Member States concerned and with ACER, in particular through participation in the work of ACER's Board of Regulators pursuant to Article 21 of Regulation (EU) 2019/942; (g) complying with, and implementing, any relevant legally binding decisions of the Commission and of ACER; (h) ensuring that transmission system operators make available interconnector capacities to the utmost extent pursuant to Article 16 of Regulation (EU) 2019/943; (i) reporting annually on its activity and the fulfilment of its duties to the relevant authorities of the Member States, the Commission and ACER, including on the steps taken and the results obtained as regards each of the tasks listed in this Article; (j) ensuring that there is no cross-subsidisation between transmission, distribution and supply activities or other electricity or non-electricity activities; (k) monitoring investment plans of the transmission system operators and providing in its annual report an assessment of the investment plans of the transmission system operators as regards their consistency with the Union-wide network development plan; such assessment may include recommendations to amend those investment plans; (l) monitoring and assessing the performance of transmission system operators and distribution system operators in relation to the development of a smart grid that promotes energy efficiency and the integration of energy from renewable sources, based on a limited set of indicators, and publish a national report every two years, including recommendations; (m) setting or approving standards and requirements for quality of service and quality of supply or contributing thereto together with other competent authorities and monitoring compliance with and reviewing the past performance of network security and reliability rules; (n) monitoring the level of transparency, including of wholesale prices, and ensuring compliance of electricity undertakings with transparency obligations; (o) monitoring the level and effectiveness of market opening and competition at wholesale and retail levels, including on electricity exchanges, prices for household customers including prepayment systems, the impact of dynamic electricity price contracts and of the use of smart metering systems, switching rates, disconnection rates, charges for maintenance services, the execution of maintenance services, the relationship between household and wholesale prices, the evolution of grid tariffs and levies, and complaints by household customers, as well as any distortion or restriction of competition, including by providing any relevant information, and bringing any relevant cases to the relevant competition authorities; (p) monitoring the occurrence of restrictive contractual practices, including exclusivity clauses which may prevent customers from contracting simultaneously with more than one supplier or restrict their choice to do so, and, where appropriate, informing the national competition authorities of such practices; (q) monitoring the time taken by transmission system operators and distribution system operators to make connections and repairs; (r) helping to ensure, together with other relevant authorities, that the consumer protection measures are effective and enforced; (s) publishing recommendations, at least annually, in relation to compliance of supply prices with Article 5, and providing those recommendations to the competition authorities, where appropriate; (t) ensuring non-discriminatory access to customer consumption data, the provision, for optional use, of an easily understandable harmonised format at national level for consumption data, and prompt access for all customers to such data pursuant to Articles 23 and 24; (u) monitoring the implementation of rules relating to the roles and responsibilities of transmission system operators, distribution system operators, suppliers, customers and other market participants pursuant to Regulation (EU) 2019/943; (v) monitoring investment in generation and storage capacities in relation to security of supply; (w) monitoring technical cooperation between Union and third-country transmission system operators; (x) contributing to the compatibility of data exchange processes for the most important market processes at regional level; (y) monitoring the availability of comparison tools that meet the requirements set out in Article 14; (z) monitoring the removal of unjustified obstacles to and restrictions on the development of consumption of self-generated electricity, energy sharing, renewable energy communities and citizen energy communities, including obstacles and restrictions preventing the connection of flexible distributed energy generation within a reasonable time in accordance with Article 58, point (d). 2. Where a Member State has so provided, the monitoring duties set out in paragraph 1 may be carried out by other authorities than the regulatory authority. In such a case, the information resulting from such monitoring shall be made available to the regulatory authority as soon as possible. While preserving their independence, without prejudice to their own specific competence and consistent with the principles of better regulation, the regulatory authority shall, as appropriate, consult transmission system operators and, as appropriate, closely cooperate with other relevant national authorities when carrying out the duties set out in paragraph 1. Any approvals given by a regulatory authority or ACER under this Directive are without prejudice to any duly justified future use of its powers by the regulatory authority under this Article or to any penalties imposed by other relevant authorities or the Commission. 3. Member States shall ensure that regulatory authorities are granted the powers enabling them to carry out the duties referred to in this Article in an efficient and expeditious manner. For this purpose, the regulatory authority shall have at least the following powers: (a) to issue binding decisions on electricity undertakings; (b) to carry out investigations into the functioning of the electricity markets, and to decide upon and impose any necessary and proportionate measures to promote effective competition and ensure the proper functioning of the market. Where appropriate, the regulatory authority shall also have the power to cooperate with the national competition authority and the financial market regulators or the Commission in conducting an investigation relating to competition law; (c) to require any information from electricity undertakings relevant for the fulfilment of its tasks, including the justification for any refusal to grant third-party access, and any information on measures necessary to reinforce the network; (d) to impose effective, proportionate and dissuasive penalties on electricity undertakings not complying with their obligations under this Directive, Regulation (EU) 2019/943 or any relevant legally binding decisions of the regulatory authority or of ACER, or to propose that a competent court impose such penalties, including the power to impose or propose the imposition of penalties of up to 10 % of the annual turnover of the transmission system operator on the transmission system operator or of up to 10 % of the annual turnover of the vertically integrated undertaking on the vertically integrated undertaking, as the case may be, for non-compliance with their respective obligations pursuant to this Directive; and (e) appropriate rights of investigation and relevant powers of instruction for dispute settlement under Article 60(2) and (3). 4. The regulatory authority located in the Member State in which the single allocation platform, the ENTSO for Electricity or the EU DSO entity has its seat shall have the power to impose effective, proportionate and dissuasive penalties on those entities where they do not comply with their obligations under this Directive, Regulation (EU) 2019/943 or any relevant legally binding decisions of the regulatory authority or of ACER, or to propose that a competent court impose such penalties. 5. In addition to the duties conferred upon it under paragraphs 1 and 3 of this Article, when an independent system operator has been designated under Article 44, the regulatory authority shall: (a) monitor the transmission system owner's and the independent system operator's compliance with their obligations under this Article, and issue penalties for non-compliance in accordance with point (d) of paragraph 3; (b) monitor the relations and communications between the independent system operator and the transmission system owner so as to ensure compliance of the independent system operator with its obligations, and in particular approve contracts and act as a dispute settlement authority between the independent system operator and the transmission system owner with respect to any complaint submitted by either party pursuant to Article 60(2); (c) without prejudice to the procedure under point (c) of Article 44(2), for the first ten-year network development plan, approve the investments planning and the multi-annual network development plan submitted at least every two years by the independent system operator; (d) ensure that network access tariffs collected by the independent system operator include remuneration for the network owner or network owners, which provides for adequate remuneration of the network assets and of any new investments made therein, provided they are economically and efficiently incurred; (e) have the powers to carry out inspections, including unannounced inspections, at the premises of transmission system owner and independent system operator; and (f) monitor the use of congestion charges collected by the independent system operator in accordance with Article 19(2) of Regulation (EU) 2019/943. 6. In addition to the duties and powers conferred on it under paragraphs 1 and 3 of this Article, when a transmission system operator has been designated in accordance with Section 3 of Chapter VI, the regulatory authority shall be granted at least the following duties and powers: (a) to impose penalties in accordance with point (d) of paragraph 3 for discriminatory behaviour in favour of the vertically integrated undertaking; (b) to monitor communications between the transmission system operator and the vertically integrated undertaking so as to ensure compliance of the transmission system operator with its obligations; (c) to act as dispute settlement authority between the vertically integrated undertaking and the transmission system operator with respect to any complaint submitted pursuant to Article 60(2); (d) to monitor commercial and financial relations including loans between the vertically integrated undertaking and the transmission system operator; (e) to approve all commercial and financial agreements between the vertically integrated undertaking and the transmission system operator on the condition that they comply with market conditions; (f) to request a justification from the vertically integrated undertaking when notified by the compliance officer in accordance with Article 50(4), such justification including, in particular, evidence demonstrating that no discriminatory behaviour to the advantage of the vertically integrated undertaking has occurred; (g) to carry out inspections, including unannounced ones, on the premises of the vertically integrated undertaking and the transmission system operator; and (h) to assign all or specific tasks of the transmission system operator to an independent system operator appointed in accordance with Article 44 in the case of a persistent breach by the transmission system operator of its obligations under this Directive, in particular in the case of repeated discriminatory behaviour to the benefit of the vertically integrated undertaking. 7. The regulatory authorities, except where ACER is competent to fix and approve the terms and conditions or methodologies for the implementation of network codes and guidelines under Chapter VII of Regulation (EU) 2019/943 pursuant to Article 5(2) of Regulation (EU) 2019/942 because of their coordinated nature, shall be responsible for fixing or approving sufficiently in advance of their entry into force at least the national methodologies used to calculate or establish the terms and conditions for: (a) connection and access to national networks, including transmission and distribution tariffs or their methodologies, those tariffs or methodologies shall allow the necessary investments in the networks to be carried out in a manner allowing those investments to ensure the viability of the networks; (b) the provision of ancillary services which shall be performed in the most economic manner possible and provide appropriate incentives for network users to balance their input and off-takes, such ancillary services shall be provided in a fair and non-discriminatory manner and be based on objective criteria; and (c) access to cross-border infrastructures, including the procedures for the allocation of capacity and congestion management. 8. The methodologies or the terms and conditions referred to in paragraph 7 shall be published. 9. With a view to increasing transparency in the market and providing all interested parties with all necessary information and decisions or proposals for decisions concerning transmission and distribution tariffs as referred in Article 60(3), regulatory authorities shall make publicly available the detailed methodology and underlying costs used for the calculation of the relevant network tariffs, while preserving the confidentiality of commercially sensitive information. 10. The regulatory authorities shall monitor congestion management of national electricity systems including interconnectors, and the implementation of congestion management rules. To that end, transmission system operators or market operators shall submit their congestion management rules, including capacity allocation, to the regulatory authorities. Regulatory authorities may request amendments to those rules.
Text digest
1db01a2b1e7122ceb20b7f4424a80eabbcef0ab7b0ef2cbb4cb13c2a7a19f43e, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/059060 Article 60
Article 60 Decisions and complaints 1. Regulatory authorities shall have the authority to require transmission system operators and distribution system operators, if necessary, to modify the terms and conditions, including tariffs or methodologies referred to Article 59 of this Directive, to ensure that they are proportionate and applied in a non-discriminatory manner, in accordance with Article 18 of Regulation (EU) 2019/943. In the event of delay in the fixing of transmission and distribution tariffs, regulatory authorities shall have the power to fix or approve provisional transmission and distribution tariffs or methodologies and to decide on the appropriate compensatory measures if the final transmission and distribution tariffs or methodologies deviate from those provisional tariffs or methodologies. 2. Any party having a complaint against a transmission or distribution system operator in relation to that operator's obligations under this Directive may refer the complaint to the regulatory authority which, acting as dispute settlement authority, shall issue a decision within two months of receipt of the complaint. That period may be extended by two months where additional information is sought by the regulatory authority. That extended period may be further extended with the agreement of the complainant. The regulatory authority's decision shall have binding effect unless and until overruled on appeal. 3. Any party who is affected and who has a right to complain concerning a decision on methodologies taken pursuant to Article 59 or, where the regulatory authority has a duty to consult, concerning the proposed tariffs or methodologies, may, within two months, or within a shorter period as provided for by Member States, after publication of the decision or proposal for a decision, submit a complaint for review. Such a complaint shall not have suspensive effect. 4. Member States shall create appropriate and efficient mechanisms for regulation, control and transparency so as to avoid any abuse of a dominant position, in particular to the detriment of consumers, and any predatory behaviour. Those mechanisms shall take account of the provisions of the TFEU, and in particular Article 102 thereof. 5. Member States shall ensure that the appropriate measures are taken, including administrative action or criminal proceedings in conformity with their national law, against the natural or legal persons responsible where confidentiality rules imposed by this Directive have not been respected. 6. Complaints referred to in paragraphs 2 and 3 shall be without prejudice to the exercise of rights of appeal under Union or national law. 7. Decisions taken by regulatory authorities shall be fully reasoned and justified to allow for judicial review. The decisions shall be available to the public while preserving the confidentiality of commercially sensitive information. 8. Member States shall ensure that suitable mechanisms exist at national level under which a party affected by a decision of a regulatory authority has a right of appeal to a body independent of the parties involved and of any government.
Text digest
d3fbce01450a219f4b5bcc56053b82a6ee5669818d70819a0d697d8ca5b6b39e, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/060061 Article 61
Article 61 Regional cooperation between regulatory authorities on cross-border issues 1. Regulatory authorities shall closely consult and cooperate with each other, in particular within ACER, and shall provide each other and ACER with any information necessary for the fulfilment of their tasks under this Directive. With respect to the information exchanged, the receiving authority shall ensure the same level of confidentiality as that required of the originating authority. 2. Regulatory authorities shall cooperate at least at a regional level to: (a) foster the creation of operational arrangements in order to enable an optimal management of the network, promote joint electricity exchanges and the allocation of cross-border capacity, and to enable an adequate level of interconnection capacity, including through new interconnection, within the region and between regions to allow for development of effective competition and improvement of security of supply, without discriminating between suppliers in different Member States; (b) coordinate the joint oversight of entities performing functions at regional level; (c) coordinate, in cooperation with other involved authorities, the joint oversight of national, regional and European resource adequacy assessments; (d) coordinate the development of all network codes and guidelines for the relevant transmission system operators and other market actors; and (e) coordinate the development of the rules governing the management of congestion. 3. Regulatory authorities shall have the right to enter into cooperative arrangements with each other to foster regulatory cooperation. 4. The actions referred to in paragraph 2 shall be carried out, as appropriate, in close consultation with other relevant national authorities and without prejudice to their specific competence. 5. The Commission is empowered to adopt delegated acts in accordance with Article 67 in order to supplement this Directive by establishing guidelines on the extent of the duties of regulatory authorities to cooperate with each other and with ACER.
Text digest
4bd615f3747ec6b2de92385550ed6b617d56fe9d210c3f50446bc31c827043eb, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/061062 Article 62
Article 62 Duties and powers of regulatory authorities with respect to regional coordination centres 1. The regional regulatory authorities of the system operation region in which a regional coordination centre is established shall, in close coordination with each other: (a) approve the proposal for the establishment of regional coordination centres in accordance with Article 35(1) of Regulation (EU) 2019/943; (b) approve the costs related to the activities of the regional coordination centres, which are to be borne by the transmission system operators and to be taken into account in the calculation of tariffs, provided that they are reasonable and appropriate; (c) approve the cooperative decision-making process; (d) ensure that the regional coordination centres are equipped with all the necessary human, technical, physical and financial resources for fulfilling their obligations under this Directive and carrying out their tasks independently and impartially; (e) propose jointly with other regulatory authorities of a system operation region possible additional tasks and additional powers to be assigned to the regional coordination centres by the Member States of the system operation region; (f) ensure compliance with the obligations under this Directive and other relevant Union law, in particular as regards cross-border issues, and jointly identify non-compliance of the regional coordination centres with their respective obligations; where the regulatory authorities have not been able to reach an agreement within a period of four months after the start of consultations for the purpose of jointly identifying non-compliance, the matter shall be referred to ACER for a decision, pursuant to Article 6(10) of Regulation (EU) 2019/942; (g) monitor the performance of system coordination and report annually to ACER in this respect in accordance with Article 46 of Regulation (EU) 2019/943. 2. Member States shall ensure that regulatory authorities are granted the powers enabling them to carry out the duties referred to in paragraph 1 in an efficient and expeditious manner. For this purpose, the regulatory authorities shall have at least the following powers: (a) to request information from the regional coordination centres; (b) to carry out inspections, including unannounced inspections, at the premises of the regional coordination centres; (c) to issue joint binding decisions on the regional coordination centres. 3. The regulatory authority located in the Member State in which a regional coordination centre has its seat shall have the power to impose effective, proportionate and dissuasive penalties on the regional coordination centre where it does not comply with its obligations under this Directive, Regulation (EU) 2019/943 or any relevant legally binding decisions of the regulatory authority or of ACER, or shall have the power to propose that a competent court impose such penalties.
Text digest
ef611f11168e337b835fcd9672548a759ba446f00734723111de814bf7ab8fae, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/062063 Article 63
Article 63 Compliance with the network codes and guidelines 1. Any regulatory authority and the Commission may request the opinion of ACER on the compliance of a decision taken by a regulatory authority with the network codes and guidelines referred to in this Directive or in Chapter VII of Regulation (EU) 2019/943. 2. ACER shall provide its opinion to the regulatory authority which has requested it or to the Commission, respectively, and to the regulatory authority which has taken the decision in question within three months of the date of receipt of the request. 3. Where the regulatory authority which has taken the decision does not comply with ACER's opinion within four months of the date of receipt of that opinion, ACER shall inform the Commission accordingly. 4. Any regulatory authority may inform the Commission where it considers that a decision relevant for cross-border trade taken by another regulatory authority does not comply with the network codes and guidelines referred to in this Directive or in Chapter VII of Regulation (EU) 2019/943 within two months of the date of that decision. 5. Where the Commission, within two months of having been informed by ACER in accordance with paragraph 3, or by a regulatory authority in accordance with paragraph 4, or, on its own initiative, within three months of the date of the decision, finds that the decision of a regulatory authority raises serious doubts as to its compatibility with the network codes and guidelines referred to in this Directive or in Chapter VII of Regulation (EU) 2019/943, the Commission may decide to examine the case further. In such a case, it shall invite the regulatory authority and the parties to the proceedings before the regulatory authority to submit observations. 6. Where the Commission takes a decision to examine the case further, it shall, within four months of the date of such decision, issue a final decision: (a) not to raise objections against the decision of the regulatory authority; or (b) to require the regulatory authority concerned to withdraw its decision on the basis that network codes and guidelines have not been complied with. 7. Where the Commission has not taken a decision to examine the case further or a final decision within the time-limits set in paragraphs 5 and 6 respectively, it shall be deemed not to have raised objections to the decision of the regulatory authority. 8. The regulatory authority shall comply with the Commission decision requiring it to withdraw its decision within two months and shall inform the Commission accordingly. 9. The Commission is empowered to adopt delegated acts in accordance with Article 67 supplementing this Directive by establishing guidelines setting out the details of the procedure to be followed for the application of this Article.
Text digest
897d40696e9342bd14d47905540615b79b5ef69483621a68fca4586161513574, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/063064 Article 64
Article 64 Record keeping 1. Member States shall require suppliers to keep at the disposal of the national authorities, including the regulatory authority, the national competition authorities and the Commission, for the fulfilment of their tasks, for at least five years, the relevant data relating to all transactions in electricity supply contracts and electricity derivatives with wholesale customers and transmission system operators. 2. The data shall include details on the characteristics of the relevant transactions such as duration, delivery and settlement rules, the quantity, the dates and times of execution and the transaction prices and means of identifying the wholesale customer concerned, as well as specified details of all unsettled electricity supply contracts and electricity derivatives. 3. The regulatory authority may decide to make available to market participants elements of that information provided that commercially sensitive information on individual market players or individual transactions is not released. This paragraph shall not apply to information about financial instruments which fall within the scope of Directive 2014/65/EU. 4. This Article shall not create additional obligations towards the authorities referred to in paragraph 1 for entities falling within the scope of Directive 2014/65/EU. 5. In the event that the authorities referred to in paragraph 1 need access to data kept by entities falling within the scope of Directive 2014/65/EU, the authorities responsible under that Directive shall provide them with the required data.
Text digest
1699bda2c822932e4b39f188599f9cff632db5679d021dc5f0a964829bb1ca7a, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/064065 Article 65
Article 65 Level playing field 1. Measures that the Member States may take pursuant to this Directive in order to ensure a level playing field shall be compatible with the TFEU, in particular Article 36 thereof, and with Union law. 2. The measures referred to in paragraph 1 shall be proportionate, non-discriminatory and transparent. Those measures may be put into effect only following the notification to and approval by the Commission. 3. The Commission shall act on the notification referred to in paragraph 2 within two months of the receipt of the notification. That period shall begin on the day after receipt of the complete information. In the event that the Commission has not acted within that two-month period, it shall be deemed not to have raised objections to the notified measures.
Text digest
d9f20dfbbf82d2678be8696aaa15c6bc7e392f59819c3ab4f3229f23482dca5a, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/065066 Article 66
Article 66 Derogations 1. Member States which can demonstrate that there are substantial problems for the operation of their small connected systems and small isolated systems, may apply to the Commission for derogations from the relevant provisions of Articles 7 and 8 and of Chapters IV, V and VI. Small isolated systems and France, for the purpose of Corsica, may also apply for a derogation from Articles 4, 5 and 6. The Commission shall inform the Member States of such applications before taking a decision, taking into account respect for confidentiality. 2. Derogations granted by the Commission as referred to in paragraph 1 shall be limited in time and subject to conditions that aim to increase competition in and the integration of the internal market and to ensure that the derogations do not hamper the transition towards renewable energy, increased flexibility, energy storage, electromobility and demand response. For outermost regions within the meaning of Article 349 TFEU, that cannot be interconnected with the Union electricity markets, the derogation shall not be limited in time and shall be subject to conditions aimed to ensure that the derogation does not hamper the transition towards renewable energy. Decisions to grant derogations shall be published in the Official Journal of the European Union. 3. Article 43 shall not apply to Cyprus, Luxembourg and Malta. In addition, Articles 6 and 35 shall not apply to Malta and Articles 44, 45, 46, 47, 48, 49, 50 and 52 shall not apply to Cyprus. For the purposes of point (b) of Article 43(1), the notion ‘undertaking performing any of the functions of generation or supply’ shall not include final customers who perform any of the functions of generation and/or supply of electricity, either directly or via undertakings over which they exercise control, either individually or jointly, provided that the final customers including their shares of the electricity produced in controlled undertakings are, on an annual average, net consumers of electricity and provided that the economic value of the electricity they sell to third parties is insignificant in proportion to their other business operations. 4. Until 1 January 2025, or until a later date set out in a decision pursuant to paragraph 1 of this Article, Article 5 shall not apply to Cyprus and Corsica. 5. Article 4 shall not apply to Malta until 5 July 2027. That period may be extended for a further additional period, not exceeding eight years. The extension for a further additional period shall be made by means of a decision pursuant to paragraph 1. 6. By way of derogation from Article 40(4), the transmission system operators in Estonia, Latvia and Lithuania shall be able to rely on balancing services provided by domestic electricity storage providers, transmission system operators related undertakings, and other facilities owned by transmission system operators. By way of derogation from Article 54(2), Estonia, Latvia and Lithuania may allow their transmission system operators and transmission system operators related undertakings to own, develop, manage and operate energy storage facilities without following an open, transparent and non-discriminatory tendering procedure and may allow such energy storage facilities to buy or sell electricity in the balancing markets. The derogations referred to in the first and second subparagraphs shall apply for up to three years after Estonia, Latvia and Lithuania have joined the Continental Europe Synchronous Area. Where necessary to preserve security of supply, the Commission may grant an extension of the initial three-year period by a maximum of five years. 7. By way of derogation from Article 40(4) and Article 54(2), Cyprus may allow its transmission system operator to own, develop, manage and operate energy storage facilities without following an open, transparent and non-discriminatory tendering procedure. The derogation referred to in the first subparagraph shall apply until the transmission system in Cyprus is connected to other Member States’ transmission systems via interconnection.
Text digest
bb0368c06b6bf38e2a22fe017bfcc08819c43ac51b78bec909d117c7890ee8c6, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/066066A Article 66a
Article 66a Access to affordable energy during an electricity price crisis 1. The Council may, acting on a proposal from the Commission, by means of an implementing decision declare a regional or Union-wide electricity price crisis, if the following conditions are met: (a) the existence of very high average prices in wholesale electricity markets of at least two and a half times the average price during the previous five years, and at least 180 EUR/MWh which is expected to continue for at least six months, the calculation of the average price during the previous five years not taking into account those periods where a regional or Union-wide electricity price crisis was declared; (b) sharp increases in electricity retail prices in the range of 70 % occur which are expected to continue for at least three months. 2. The implementing decision referred to in paragraph 1 shall specify its period of validity which may be for a period of up to one year. That period may be extended in accordance with the procedure laid down in paragraph 8 for consecutive periods of up to one year. 3. The declaration of a regional or Union-wide electricity price crisis pursuant to paragraph 1 shall ensure a fair competition and trade across all Member States affected by the implementing decision so that the internal market is not unduly distorted. 4. Where the conditions laid down in paragraph 1 are fulfilled, the Commission shall submit a proposal to declare a regional or Union-wide electricity price crisis which shall include the proposed period of validity of the implementing decision. 5. The Council, acting by a qualified majority, may amend a Commission proposal submitted pursuant to paragraph 4 or 8. 6. Where the Council has adopted an implementing decision pursuant to paragraph 1, Member States may, for the duration of the validity of that decision, apply temporary targeted public interventions in price setting for the supply of electricity to small enterprises and medium-sized enterprises. Such public interventions shall: (a) be limited to at most 70 % of the beneficiary’s consumption during the same period of the previous year and retain an incentive for demand reduction; (b) comply with the conditions set out in Article 5(4) and (7); (c) where relevant, comply with the conditions set out in paragraph 7 of this Article; (d) be designed to minimise any negative fragmentation of the internal market. 7. Where the Council has adopted an implementing decision pursuant to paragraph 1 of this Article, Member States may for the duration of the validity of that decision, by way of derogation from Article 5(7), point (c), when applying targeted public interventions in price setting for the supply of electricity pursuant to Article 5(6) or to paragraph 6 of this Article, exceptionally and temporarily set a price for the supply of electricity which is below cost provided that the following conditions are fulfilled: (a) the price set for household customers only applies, at most, to 80 % of median household consumption and retains an incentive for demand reduction; (b) there is no discrimination between suppliers; (c) suppliers are compensated for supplying below cost in a transparent and non-discriminatory manner; (d) all suppliers are eligible to provide offers for the price for the supply of electricity which is below cost on the same basis; (e) measures proposed do not distort the internal electricity market. 8. In due time before the expiry of the period of validity specified pursuant to paragraph 2, the Commission shall assess whether the conditions laid down in paragraph 1 continue to be fulfilled. If the Commission considers that the conditions laid down in paragraph 1 continue to be fulfilled, it shall submit to the Council a proposal to extend the period of validity of an implementing decision adopted pursuant to paragraph 1. Where the Council decides to extend the period of validity, paragraphs 6 and 7 shall apply during such extended period. The Commission shall continuously assess and monitor the impact resulting from any measures adopted under this Article and publish on a regular basis the results of such assessments.
Text digest
38b24408df989af74abf837f7416a1b9cef6e0a2cb67b94e17d14847f59295de, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/066A067 Article 67
Article 67 Exercise of the delegation 1. The power to adopt delegated acts is conferred on the Commission subject to the conditions laid down in this Article. 2. The power to adopt delegated acts referred to in Article 61(5) and Article 63(9) shall be conferred on the Commission for an indeterminate period of time from 4 July 2019. 3. The delegation of power referred to in Article 61(5) and Article 63(9) may be revoked at any time by the European Parliament or by the Council. A decision to revoke shall put an end to the delegation of power specified in that decision. It shall take effect the day following the publication of the decision in the Official Journal of the European Union or at a later date specified therein. It shall not affect the validity of any delegated act already in force. 4. Before adopting a delegated act, the Commission shall consult experts designated by each Member State in accordance with the principles laid down in the Interinstitutional Agreement of 13 April 2016 on Better Law-Making. 5. As soon as it adopts a delegated act, the Commission shall notify it simultaneously to the European Parliament and to the Council. 6. A delegated act adopted pursuant to Article 61(5) and Article 63(9) shall enter into force only if no objection has been expressed either by the European Parliament or the Council within two months of notification of that act to the European Parliament and the Council or if, before the expiry of that period, the European Parliament and the Council have both informed the Commission that they will not object. That period shall be extended by two months at the initiative of the European Parliament or of the Council.
Text digest
ece213a11fb1ba5b73812adee0df792261355a38928e9c261aa53d1637b816c5, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/067068 Article 68
Article 68 Committee procedure 1. The Commission shall be assisted by a committee. That committee shall be a committee within the meaning of Regulation (EU) No 182/2011. 2. Where reference is made to this paragraph, Article 4 of Regulation (EU) No 182/2011 shall apply.
Text digest
7e1c0aa1aafb887957d1d6db63ae640b2232fd819eec7b850749d2c707398089, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/068069 Article 69
Article 69 Commission monitoring, reviewing and reporting 1. The Commission shall monitor and review the implementation of this Directive and shall submit a progress report to the European Parliament and the Council as an annex to the State of the Energy Union Report referred to in Article 35 of Regulation (EU) 2018/1999. 2. By 31 December 2025, the Commission shall review the implementation of this Directive and shall submit a report to the European Parliament and to the Council. If appropriate, the Commission shall submit a legislative proposal together with or after submitting the report. The Commission’s review shall, in particular, assess the service quality offered to final customers and whether customers, especially vulnerable customers and customers affected by energy poverty, are adequately protected under this Directive.
Text digest
89421dddd4a33fe56af8e10bc3e9d0083623f1ffdd702ed37accae442ea125c5, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/069070 Article 70
Article 70 Amendments to Directive 2012/27/EU Directive 2012/27/EU is amended as follows: (1) Article 9 is amended as follows: (a) the title is replaced by the following: ‘Metering for natural gas’; (b) in paragraph 1, the first subparagraph is replaced by the following: ‘1. Member States shall ensure that, in so far as it is technically possible, financially reasonable, and proportionate to the potential energy savings, for natural gas final customers are provided with competitively priced individual meters that accurately reflect the final customer's actual energy consumption and that provide information on actual time of use.’; (c) paragraph 2 is amended as follows: (i) the introductory part is replaced by the following: ‘2. Where, and to the extent that, Member States implement intelligent metering systems and roll out smart meters for natural gas in accordance with Directive 2009/73/EC:’; (ii) points (c) and (d) are deleted; (2) Article 10 is amended as follows: (a) the title is replaced by the following: ‘Billing information for natural gas’; (b) in paragraph 1, the first subparagraph is replaced by the following: ‘1. Where final customers do not have smart meters as referred to in Directive 2009/73/EC, Member States shall ensure, by 31 December 2014, that billing information for natural gas is reliable, accurate and based on actual consumption, in accordance with point 1.1 of Annex VII, where that is technically possible and economically justified.’; (c) in paragraph 2, the first subparagraph is replaced by the following: ‘2. Meters installed in accordance with Directive 2009/73/EC shall enable the provision of accurate billing information based on actual consumption. Member States shall ensure that final customers have the possibility of easy access to complementary information on historical consumption allowing detailed self-checks.’; (3) in Article 11, the title is replaced by the following: ‘Cost of access to metering and billing information for natural gas’; (4) in Article 13, the words ‘Articles 7 to 11’ are replaced by the words ‘Articles 7 to 11a’; (5) Article 15 is amended as follows: (a) paragraph 5 is amended as follows: (i) the first and second subparagraphs are deleted; (ii) the third subparagraph is replaced by the following: ‘Transmission system operators and distribution system operators shall comply with the requirements set out in Annex XII.’; (b) paragraph 8 is deleted; (6) in Annex VII, the title is replaced by the following: ‘Minimum requirements for billing and billing information based on actual consumption of natural gas’.
Text digest
cd184f51eb43372bf1dd960104a8d7fff7ce360d9e380015fa957951606cc2bb, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/070071 Article 71
Article 71 Transposition 1. Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with Articles 2 to 5, Article 6(2) and (3), Article 7(1), point (j) and (l) of Article 8(2), Article 9(2), Article 10(2) to (12), Articles 11 to 24, Articles 26, 28 and 29, Articles 31 to 34 and 36, Article 38(2), Articles 40 and 42, point (d) of Article 46(2), Articles 51 and 54, Articles 57 to 59, Articles 61 to 63, points (1) to (3), (5)(b) and (6) of Article 70 and Annexes I and II by 31 December 2020. They shall immediately communicate the text of those provisions to the Commission. However, Member States shall bring into force the laws, regulations and administrative provisions necessary to comply with: (a) point (5)(a) of Article 70 by 31 December 2019; (b) point (4) of Article 70 by 25 October 2020. When Member States adopt those measures, they shall contain a reference to this Directive or be accompanied by such a reference on the occasion of their official publication. They shall also include a statement that references in existing laws, regulations and administrative provisions to the Directive repealed by this Directive shall be construed as references to this Directive. Member States shall determine how such reference is to be made and how that statement is to be formulated. 2. Member States shall communicate to the Commission the text of the main provisions of national law which they adopt in the field covered by this Directive.
Text digest
8d56eb66b03cae4888a86268a5a2c69bd398e41d6501862e40ff28e1ff4c324b, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/071072 Article 72
Article 72 Repeal Directive 2009/72/EC is repealed with effect from 1 January 2021, without prejudice to the obligations of Member States relating to the time-limit for the transposition into national law and the date of application of the Directive set out in Annex III. References to the repealed Directive shall be construed as references to this Directive and shall be read in accordance with the correlation table set out in Annex IV.
Text digest
7fe124e4668d03baca10565afdb59769a4438e0534c872a8e1c37d944aad3f11, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/072073 Article 73
Article 73 Entry into force This Directive shall enter into force on the twentieth day following that of its publication in the Official Journal of the European Union. Article 6(1), Article 7 (2) to (5), Article 8(1), points (a) to (i) and (k) of Article 8(2) and Article 8(3) and (4), Article 9(1), (3), (4) and (5), Article 10(2) to (10), Articles 25, 27, 30, 35 and 37, Article 38(1), (3) and (4), Articles 39, 41, 43, 44 and 45, Article 46(1), points (a), (b) and (c) and (e) to (h) of Article 46(2), Article 46(3) to (6), Article 47 to 50, Articles 52, 53, 55, 56, 60, 64 and 65 shall apply from 1 January 2021. Points (1) to (3), (5)(b) and (6) of Article 70 shall apply from 1 January 2021. Point (5)(a) of Article 70 shall apply from 1 January 2020. Point (4) of Article 70 shall apply from 26 October 2020.
Text digest
ec259bf8d7e864f9466ac99ee78e0d77b575e3b11c871c685dc0c057b562e38b, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/073074 Article 74
Article 74 Addressees This Directive is addressed to the Member States.
Text digest
ef6e9ef8bfdb50c8a827ca30fb468ed7e121e3584bdc614188671e172755dbb0, body digestb5eb0a876af203c58c35867a66943b81f30da988d1e743ff24cc33710a65248e, official sourcehttps://publications.europa.eu/resource/cellar/dba44a94-e02e-11f0-8439-01aa75ed71a1.0006.01,/eu-eurlex/32019L0944/2025-10-12--d9e9945d8797f913def1b3951c3b0840ac97ff2f354a848126878ec75dd3497c/eng/074
What this reading does not hold
- publisher_signature: no signature or attestation of the publisher is held; the digests are this index's own reading of the retained package
- unconsolidated_amendments: an amendment the publisher has not yet consolidated is not held: the latest consolidated wording answers every later date, as dated
- force_dates: the act's own dates are said under force_dates, as the publisher's dated statements on the act give them; none of them is used to choose a wording, each wording carries its own date, and a date the publisher records without a dated statement is not held
- observation_time: when the publisher served the retained package is not held, so no observation time is stated
- markup_and_notes: the Formex markup, notes and tables are not served as structure; the text is the article's searchable text, in publisher order
- annexes: no annex text is held: annexes are not indexed as articles, so no annex is searched, quoted or exported; annexes_not_served lists the annexes the corpus classified against the publisher PDF on the members an expression was read from, with the official source to read them, and an empty list says only that the corpus classified none there, not that the act has none